Mold in Construction Checklist
|
|
St. Paul Fire & Marine
Insurance Company
Presented
at the Construction Safety Councils' 13th Annual Construction Safety
& Health Conference & Exposition, Rosemont, Illinois, February
2003. |
- St Paul makes
no warranty of any kind, and is not liable for any damages that may
arise from use of this information.
- We ARE NOT LAWYERS,
and can't give legal advice. If you need it, talk with your own
lawyer.
- Our discussion
of a topic does not change or create insurance coverage- your insurance
policy does that.
- This class does
not, and cannot cover all conditions you may encounter in the real world.
- YOU always have
FINAL responsibility for YOUR safety.
This checklist is only
a tool to assist the Insured in managing its responsibility to maintain
safe premises, practices, operations and equipment, and is not for the benefit
of any other party. The checklist does not cover all possible hazardous
conditions or unsafe acts or conditions that may exist, and contains no
legal advice. For all decisions regarding use of the practices suggested
in this checklist, follow the advice of your own legal counsel or other
qualified professional. The St. Paul disclaims all warranties whether implied,
express or statutory, including without limitation, implied warranties of
merchantability, fitness for use and fitness for a particular purpose. Implementation
of any practices suggested in this checklist is at your sole discretion,
and The St. Paul will have no liability to any party for any damages including,
but not limited to, direct, indirect, special or consequential damages,
arising out of or in connection with the information provided or the use
of the results of this checklist. Further, this document does not amend,
or otherwise affect, the terms, conditions or coverages of any insurance
policy issued by The St. Paul. No part of this document or any of our other
risk control documents, or any of our risk control activities associated
with or leading up to the creation of these documents, is a representation
that coverage does or does not exist for any particular claim or type of
claim under any such policy. Whether coverage exists or does not exist for
any particular claim under any such policy depends on the facts and circumstances
involved in the claim and all applicable policy wording.
- Project management and workers trained in importance and methods
of preventing mold growth.
- Keep interior materials dry - prior to, during and after installation
- Do not install wet building materials
- Report any water damage, leaks or intrusion to project manager
immediately
- Dry out any water damaged materials as soon as possible
- Build in strict accordance with designs and specifications
- Immediately alert architects to designs that may allow water intrusion
or moisture accumulation
- Question "conceptual only," inadequate architectural detailing
or outright improper building plans
- During the design phase, carefully review the details with specific
attention to ensuring an impermeable envelope.
- Consult an envelope engineer on geometrically complex buildings for
a third party opinion on the water tightness of the envelope.
- On a renovation or addition, carefully survey the existing building
before construction begins. Look for discoloration in finished surfaces
or a musty smell. It is possible that a preexisting mold problem can
become the contractor's problem once construction begins.
- Develop the project schedule with envelope construction completion
as a predecessor to installation of finishes. This may be impossible
on some projects; if so, have a detailed weather protection plan for
all areas of exposure and establish a sufficient budget to implement
the plan.
- Establish a partnering program with the owner and promote a peer
review for the mechanical system and the building envelope designs.
- Carefully document any recommended changes to the Architect of Record.
On standard Owner-Architect-Contractor project delivery methods, the
Architect's approval must be obtained. In the event the recommendation
is rejected, reiterate the recommendation in writing, copy the owner
and file it.
- Pre-qualify potential subcontractors and ensure that the subs have
adequate experience in the specific application being bid.
- Consult manufacturers of moisture critical products to confirm the
product's application and recommend standard details, and provide preferred
installers.
- Delivery of interior materials (e.g. dry wall, paneling, ceiling
tiles, framing lumber):
- Schedule so materials will arrive after exterior of building
has been sealed
- Provide for dry storage of materials - off ground away from moisture
sources
- Minimize storage time
- Plastic sheeting or tarps used to cover materials are secured
loosely to allow air circulation
- Prearrange for drying equipment
- Fans
- Dehumidifiers
- Wet-Dry vacuums
- "Super sucker" trucks
- All materials inspected upon delivery for preexisting mold contamination
- Interior materials installed in dry condition - per manufacturers'
specifications
- All water services (including fire sprinklers) and waste lines checked
for:
- Proper installation
- Connections properly made and checked for leakage
- Water lines (particularly chilled water) properly insulated
- Have multiple inspectors for filling or hydro test of sprinklers
- All building penetrations properly installed and checked for leakage:
- Doors
- Windows
- Balconies and decks
- Roof membranes - lapping at corners and joints
- Ventilation/exhaust ducts
- All tears, openings or punctures in vapor barriers have been repaired
- All flashings and caulking checked for proper lapping and application
- All roof drains drain away from the foundation
- Roof drains properly supported and braced for large volume storms
- All moisture-generating equipment vented outdoors
- Surrounding ground sloped away from foundation
- Proper ventilation to attics, crawl spaces or other enclosed areas
- HVAC system
- Correct filters properly installed - ASHRAE Dust Spot Efficiency
per specifications, no filters missing or misaligned
- Drip pan for cooling coils drains properly
- No insulation on interior of ventilation ducts - bare, galvanized
sheet metal preferred
- All duct joints sealed
- The system is cleaned and commissioned. Third party certification
of HVAC (test and balance report). The American Society of Heating
Refrigerating and Air Conditioning Engineers has published a good
practice commissioning procedure (ASHRAE Guide #1).
- Documentation of critical installations, including photographs
- Use EIFS installers that follow performance standards, specification,
and methods of application guidelines from the EIFS Industry Members
Association. (www.eima.com)
- Perform interim inspections; invite the Architect, Envelop Engineer,
Mechanical Engineer, manufacturer's representatives to inspect for mold
related issues
- Have manufacturers inspect installations for warrantee purposes
- Facility owner briefed on their responsibilities to prevent mold
growth
- Fix leaky plumbing and leaks in the building envelope as soon as
possible.
- Watch for condensation and wet spots. Fix source(s) of moisture problem(s)
as soon as possible.
- Prevent moisture due to condensation by increasing surface temperature
or reducing the moisture level in air (humidity). To increase surface
temperature, insulate or increase air circulation. To reduce the moisture
level in air, repair leaks, increase ventilation (if outside air is
cold and dry), or dehumidify (if outdoor air is warm and humid).
- Keep heating, ventilation and air conditioning (HVAC) drip pans clean,
flowing properly and unobstructed
- Vent moisture-generating appliances, such as dryers, to the outside
when possible
- Maintain low indoor humidity, below 60 percent relative humidity
(RH), ideally 30-50 percent, if possible
- Perform regular building/HVAC inspections and maintenance as scheduled
- Install and maintain proper air filters
- Clean and dry wet or damp spots within 48 hours
- Don't let foundations stay wet. Provide drainage and slope the ground
away from the foundation
- Ensure new building penetrations are properly sealed
- Landscape watering system does not spray building foundation
- Final visual inspection of:
- Pipe chases
- Utility tunnels
- Areas above drop ceilings that are exposed to water or waste
lines or that are directly below roof
Mold in Construction
This program is only a tool to assist you in managing your legal responsibility
to maintain safe premises, practices, operations and equipment, and is not
for the benefit of any other party. The program does not cover all possible
hazardous conditions or unsafe acts that may exist, and contains no legal
advice. For decisions regarding use of the practices suggested by this program,
follow the advice of your own legal counsel. St. Paul disclaims all warranties
whether implied, express or statutory, including without limitation, implied
warranties of merchantability, fitness for use and fitness for a particular
purpose. Implementation of any practices suggested by this program is at
your sole discretion, and St. Paul will have no liability to any party for
any damages including, but not limited to, direct, indirect, special or
consequential damages, arising out of or in connection with the information
provided or its use.
Further, this document does not amend, or otherwise affect, the terms, conditions
or coverages of any insurance policy issued by The St. Paul. No part of
this document or any of our risk control activities associated with or leading
up to the creation of this document, is a representation that coverage does
or does not exist for any particular claim or type of claim under any such
policy. Whether coverage exists or does not exist for any particular claim
under any such policy depends on the facts and circumstances involved in
the claim and all applicable policy wording.
Mold in Construction
This paper
appears in the eLCOSH website with the permission of the author and/or
copyright holder and may not be reproduced without their consent. eLCOSH
is an information clearinghouse. eLCOSH and its sponsors are not responsible
for the accuracy of information provided on this web site, nor for its
use or misuse.
eLCOSH
| CDC | NIOSH
| Site Map | Search
| Links | Help
| Contact Us | Privacy Policy
|