|
Glenn
Research Center
1994 Phase II
26 Percent
Efficient, Triple Junction
Cascade®
Space PV Solar Cells
TECSTAR,
Inc.
City of Industry, CA
|
INNOVATION
Total integration of the
research approach with manufacturability of current dual-junction cell
production with future triple-junction cell enhancement
|
Optional Powerpoint
file
|
ACCOMPLISHMENTS
- Optimized a two-junction GalnP2/GaAs
Cascade® solar cell
- Integrated a Ge cell as the
third lower cell
- Built a multijunction Cascade®
solar cell that exceeded the 26% efficiency goal, presently 27.1%
efficient.
- Validated the multijunction
Cascade® cell for space qualification & production
readiness
|
COMMERCIALIZATION
- Doubled solar cell capability.
Very firm market for low earth orbit and synchronous orbit applications
- Supplied GRC with a small array
after Phase II.
- Production orders exceeding
$50M ongoing in support of a leading satellite prime contractor
through 2001
- Delivered four flight qualified
multijunction solar panels to NASA for $100K contract price. Will
fly on NASA/DOD/DERA STRV-C/D Satellites in year 2000
|
GOVERNMENT/SCIENCE
APPLICATIONS
- Temperature and radiation characteristics
of these solar cells are advantageous for near sun missions and
high voltage operation
- Important to payload capabilities
of very small satellites
- Will reduce cost of launch and
station keeping
|
For more
information about this firm, please send e-mail to company
representative
Return
to NASA SBIR Success Listings
|
Curator:
SBIR Support |