Visit NASA's Home Page Jet Propulsion Laboratory California Institute of Technology View the NASA Portal Click to search JPL Visit JPL Home Page Proceed to JPL's Earth Page Proceed to JPL's Solar System Page Proceed to JPL's Stars & Galaxies Page Proceed to JPL's Technology Page Proceed to JPL's People and Facilities Photojournal Home Page View the Photojournal Image Gallery
Top navigation bar

PIA11711: Overnight Changes Recorded by Phoenix Conductivity Probe
Target Name: Mars
Mission: Phoenix
Spacecraft: Phoenix Lander
Instrument: Thermal and Electrical Conductivity Probe
Product Size: 1152 samples x 1152 lines
Produced By: University of Arizona
Full-Res TIFF: PIA11711.tif (3.986 MB)
Full-Res JPEG: PIA11711.jpg (89.88 kB)

Click on the image to download a moderately sized image in JPEG format (possibly reduced in size from original).

Original Caption Released with Image:

This graph presents simplified data from overnight measurements by the Thermal and Electrical Conductivity Probe on NASA's Phoenix Mars Lander from noon of the mission's 70th Martian day, or sol, to noon the following sol (Aug. 5 to Aug. 6, 2008).

The graph shows that water disappeared from the atmosphere overnight, at the same time that electrical measurements detected changes consistent with addition of water to the soil.

Water in soil appears to increase overnight, when water in the atmosphere disappears.

The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

Image Credit:
NASA/JPL/University of Arizona


Latest Images Search Methods Animations Spacecraft & Telescopes Related Links Privacy/Copyright Image Use Policy Feedback Frequently Asked Questions Photojournal Home Page First Gov Freedom of Information Act NASA Home Page Webmaster
Bottom navigation bar