NRC ISSUES CONFIRMATORY ACTION LETTER |
||
The Nuclear Regulatory Commission staff has issued a Confirmatory Action Letter (CAL) to Arizona Public Service Co. confirming the company’s commitments regarding actions it will take to improve performance at the Palo Verde Nuclear Generating Station. APS operates the plant located in Wintersburg, Ariz. “Palo Verde is being operated safely, but performance improvements are needed,” NRC Region IV Administrator Bruce S. Mallett said. “We intend to hold APS accountable to perform a thorough evaluation of the causes of the performance problems at Palo Verde and to complete actions to correct them. The letter will serve as a roadmap for performance improvement.” The letter confirms commitments the company has made to the NRC to: 1. Complete actions to address root and contributing causes identified in its evaluations in response to performance problems associated with the voided containment sump suction piping for all three units, and associated with the Unit 3 emergency diesel generator electrical relay problems, including:
2. Complete corrective actions that result in measurable improvement in the crosscutting areas of human performance and problem identification and resolution. Specific areas to address are:
3. Complete an independent (third party) safety culture assessment by September 15. 4. Incorporate the results of their in-depth evaluations and safety culture assessments into a modified improvement plan. 5. Submit to the NRC portions of the modified improvement plans that impact the Reactor Safety strategic performance area, including safety culture improvement initiatives by November 30. Issuance of the CAL does not preclude subsequent issuance of an order formalizing the commitments requiring other actions on the part of the company. Palo Verde has been under increased NRC oversight since the fourth quarter of 2004 following a finding for a substantial safety issue. Inspectors found that APS had incorrectly left air pockets in portions of the emergency core cooling system for each reactor that could have hindered the system’s operation during certain types of accidents. The finding remains open because APS has not effectively addressed performance problems. Those problems include a lack of questioning attitude, lack of technical rigor and poor operability determinations by workers - factors which contributed to a more recent finding issued by the NRC for problems with a emergency diesel generator at Unit 3, moving Palo Verde into a higher level of NRC oversight. Two substantive cross-cutting issues in the areas of human performance and problem identification and resolution have also remained open since the NRC’s 2004 end-of-cycle assessment. Palo Verde has also had numerous operational challenges since 2004, including multiple reactor trips and unplanned shutdowns. |
||
NRC news releases are available through a free listserv subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html. The NRC Home Page at www.nrc.gov also offers a Subscribe to News link in the News & Information menu. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web Site. |