Instructions:
- Click the photograph number or name link below the thumbnail to view the
full size image
- Photograph details are listed on the right
- Refer to the Viewing Instructions and FAQs for technical
help
View Full Size:
nf1679
File Size:
289 KB |
|
CATEGORY: |
Test Prep |
DESCRIPTION: |
FINAL TEST PREPARATIONS INCLUDE running miles of cable downhole which will transmit vital test information to the diagnostic trailers to the left.A rack containing instrumentation to go downhole is assembled in the tower to the right. Subsidence craters from earlier underground tests dot the landscape. |
DATE: |
|
NUMBER: |
NF-1679 |
CREDIT: |
Photo courtesy of National Nuclear Security Administration / Nevada Site Office |
FULL SIZE: |
nf1679 |
HELP GUIDE: |
Viewing Instructions
:
FAQs |
|
How to order or
purchase photographs |
|
|
|
Should these photos be used in any manner that requires a credit
line, the wording should read: "Photo courtesy of National Nuclear
Security Administration / Nevada Site Office".
RELATED LINKS
^ TOP ^
|