Bureau of Reclamation Banner

BUREAU OF RECLAMATION
HYDROELECTRIC POWERPLANTS OPERATED BY OTHERS



These facilities are ones whose title is with the Federal Government, but operations, maintenance, and marketing are performed by other entities.

Powerplant Name
  Project
   Location
Capacity
in MW
   Date Operating Entity and Comments
Arizona Falls Powerplant
  Salt River Project
    Phoenix, Arizona
0.75 2003 Salt River Valley Water User's Association
Constructed by the Association
(Original 1913 constructed plant shut down in 1950)
Causey Powerplant
  Weber Basin Project
    Ogden, Utah
1.9 1999 Weber Basin Water Conservancy District
Constructed and operated by the District
Cross Cut Powerplant
  Salt River Project
    Tempe, Arizona
3.0 1914

Salt River Valley Water User's Association
Construction funds provided by the Association
(In standby condition - not in operation)

Drop One Powerplant
  Boulder Canyon Project
    All American Canal System, Arizona
6.0 1984 Imperial Irrigation District
Constructed and operated by the District
Drop Two Powerplant
  Boulder Canyon Project
    All American Canal System, Arizona
10.0 1953 Imperial Irrigation District
Constructed and operated by the District
Drop Three Powerplant
  Boulder Canyon Project
    All American Canal System, Arizona
9.8 1941 Imperial Irrigation District
Constructed and operated by the District
Drop Four Powerplant
  Boulder Canyon Project
    All American Canal System, Arizona
19.6 1941 Imperial Irrigation District
Constructed and operated by the District
Drop Five Powerplant
  Boulder Canyon Project
    All American Canal System, Arizona
4.0 1982 Imperial Irrigation District
Constructed and operated by the District
Gateway Powerplant
  Weber Basin Project
    Ogden, Utah
4.0 1958 Weber Basin Water Conservancy District
No Limit on duration of contract
Energy Exchange contract w/ Western
Grand Valley Powerplant
  Grand Valley Project
    Grand Junction, Colorado
3.0 1933 Grand Valley Water Users Association
Leased and marketed by Colorado Public Service Company - 40 year lease. Construction funds provided by Colorado Public Service
Horse Mesa Powerplant
  Salt River Project
    Phoenix, Arizona
129.58 1927 Salt River Valley Water User's Association
Constructed and Operated by the Association
Jackson Gulch Reservoir Hydroelectric Powerplant
  Mancos Project
    Mancos, Colorado
0.26 1995 Mancos Water Conservancy District
Lease of Power Privilege
Constructed and Operated by Mancos Water Conservancy District
Lahontan Powerplant
  Newlands Project
    Hazen, Nevada
2.4 1911 Truckee-Carson Irrigation District
Operated by Sierra Pacific Power Company
Constructed by Truckee-Carson Irrigation District
Lemon Dam Hydroelectric Powerplant
  Florida Project
    Durango, Colorado
0.12 1989 Florida Water Conservancy District
Lease of Power Privilege
Constructed and Operated by Florida Water Conservancy District
Lower Spanish Fork Powerplant
  Strawberry Valley Project
    Spanish Fork, Utah
0.25 1937 Strawberry Water User's Association
Constructed and Operated by the Association
(No longer shown in operation)
Morman Flat Powerplant
  Salt River Project
    Phoenix, Arizona
57.85 1926 Salt River Valley Water User's Association
Constructed and Operated by the Association
New Waddell Pump/Generating Plant
  Central Arizona Project
    Phoenix, Arizona
36.0 1993 Central Arizona Water Conservation District
Operated by the District
Olmsted Powerplant

    Utah
10.3 1904 Purchased from PacifiCorp in 1990
Leased back to PacifiCorp for a 25 year period
Payson Powerplant
  Strawberry Valley Project
    Spanish Fork, Utah
0.4 1941 Strawberry Water User's Association
Constructed and Operated by the Association
Pilot Knob Powerplant
  Boulder Canyon Project
    All American Canal System, Arizona
33.0 1961 Imperial Irrigation District
Constructed and operated by the District
Senator Wash Pump/Generating Plant
  Colorado River Front Work and Levee       System
    California
7.2 1966 Imperial Irrigation District
Operated by the District
Siphon Drop Powerplant
  Boulder Canyon Project
    All American Canal System, Arizona
4.6 1987 Yuma County Water User's Association
Constructed and operated by the Association
South Consolidated Powerplant
  Salt River Project
    Mesa, Arizona
1.4 1912 Salt River Valley Water User's Association
Construction funds provided by the Association
Stewart Mountain Powerplant
  Salt River Project
    Phoenix, Arizona
10.4 1930 Salt River Valley Water User's Association
Constructed and Operated by the Association
Theodore Roosevelt Powerplant
  Salt River Project
    Phoenix, Arizona
36.02 1973 Salt River Valley Water User's Association
Construction funds provided by the Association
Upper Spanish Fork
  Strawberry Valley Project
    Spanish Fork, Utah
3.9 1983 Strawberry Water User's Association
No limit on contract duration
Power handled by the Association
Original 1909 plant replaced by the Association
Wanship Powerplant
  Weber Basin Project
    Wanship, Utah
1.9 1958 Weber Basin Water Conservancy District
No limit on contract duration
Energy Exchange contract with Western
 

Return to Reports and Data Button    Return to Reports and Data



Revised July 5, 2005            Hydropower Site Map             Help