CO2 Capture and Geologic Storage Projects, Worldwide


Project Name/ Location

Project Size
(MM tons CO2 /yr)

Year Begun

Project Summary

K12B/ The Netherlands

Initial inj.: 30 kt/yr
2006+: 0.4 MMt/yr
Total: 8 MMt

2004

Enhanced gas recovery demo project.

RECOPOL/ European Union

Designed: 20 t/d
Achieved: 1-1.3 t/d
Total: 3 Mt

2004

Injection into coal seam has been more difficult than expected.
Horizontal wells have been drilled.

Hokkaido/ Japan

Injection rate: 2 t/d
Total injected: 24 t

2004

CO2 - ECBM test project. 
Spring 2005 wells will be refurbished (original cementing not satisfactory) and new more extensive CO2 injection test planned.

CASTOR/ European Union

Rate: 10 kt/yr

2004

Currently conducting pilot-scale tests of post combustion capture and case studies of four potential geologic storage sites.

Quinshi/ China

Total injected: 200 t Duration: 22 d

2005

The next phase of the project will involve a multi well test, the design of which will be complete in 2005.

Otway/ Australia

Rate: 160 t/d
Duration: 2 yrs
Total: 0.1 MMt

Late 2005

Planned pilot-scale project.
Saline formation and depleted gas field.

CO2  SINK/ European Union

Rate: 30 kt/y
Duration: at least 2 yrs

2006

Project to test and evaluate CO2 capture and storage at an existing natural gas storage facility and in a deeper land-based saline formation.

ARC ECBM Recovery Project/ Alberta, Canada

 

 

Pilot-scale project (3 test wells).

Sleipner/ Norway

1.0

1996

CO2 is captured from an off-shore natural gas processing platform and injected into a saline formation.
Project motivated by a net tax on CO2 emissions.

Weyburn / United States and Canada

1.5

2000

CO2 is captured in North Dakota and piped across the US-Canada border to the Weyburn oilfield in Saskatchewan.
Significant modeling and field testing of CO2 monitoring equipment being conducted in parallel to EOR project.

In Salah/ Algeria

1.2

2004

CO2 captured from natural gas processing and reinjected to enhance natural gas recovery.

Snow White (Snohvit)/ Norwegian Barents Sea

0.75

2006

Need to purify natural gas before liquefaction (raw natural gas 5-8% CO2).

CCPC/ Canada

 

2007

Project still in planning stages. 
Leaning toward EOR combined with either post-combustion or oxyfuel.

Gorgon/ Australia

4.0

2009

Need to purify natural gas before liquefaction. 
Raw natural gas 12% CO2.

Alaska gas pipeline project/ Unites States

12

 

Need to purify natural gas to meet pipeline standards (Prudhoe bay raw gas 12% CO2).
CO2 capture qualifies for 15% EOR tax credit.

Stanwell/ Australia

 

 

Part of Australia’s clean coal program. 
No details on the project available. 

Hypogen/ European Union

 

 

Pre-feasibility study complete in January 2005
EU version of FutureGen

Innovation Center Initiative / North Sea  

 

 

Large-scale proposed project to help Great Britain/Europe meet Kyoto limits and also extend the productive life of the North Sea fields. 
CO2 source unspecified.