аЯрЁБс>ўџ =?ўџџџ<џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџьЅС#` јП$bjbjmЅmЅ ..ЯЯ$џџџџџџЄвввввввц....B$цЬ2rˆˆˆˆˆˆˆ9;;;;;;$ўhf€_вˆˆˆˆˆ_ввˆˆtюююˆ.вˆвˆ9юˆ9ююбввˆf 30Ш.Ж.щ9<Ьё,цфццвˆˆюˆˆˆˆˆ__ф ˆˆˆЬˆˆˆˆццц$ $ццц цццввввввџџџџ SECTION E INSPECTION AND ACCEPTANCE E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) This contract incorporates the following clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make a copy of the full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):  HYPERLINK "http://www.arnet.gov/far" http://www.arnet.gov/far. Federal Acquisition Regulation (48 CFR, APR 1984) Clauses Clause No. Clause Title Date 52.246-02 Inspection of Supplies - Fixed Price AUG 1996 52.246-04 Inspection of Services - Fixed Price AUG 1996 52-246-06 Inspection of Services Time and Materials and Labor Hour MAY 2001 52.246-06 Inspection of Services Time and Materials and Labor Hour (ALT I APR 1984) MAY 2001 E.2 QUALITY CONTROL RESPONSIBILITIES E.2.1 General The quality control of services provided under this contract shall be based on: (i) operational requirements and standards contained in this contract; (ii) work performance; and (iii) productivity requirements and standards, and (iv) data base information resource development and maintenance standards. E.2.2 Contractor Quality Control Responsibility The Contractor shall implement and adhere to the quality control plan provided as part of its Technical Proposal. The quality control plan shall be written by the Contractor’s Quality Control Manager and approved by his/her immediate supervisor. The Contractor is solely responsible for quality control of services that it provides. The Contractor’s quality control program, which is embodied in the quality control plan, shall include, but not be limited to, the following. A monitoring and inspection system covering all the services listed in the Performance Requirements Summary. It must specify the elements of work performance to be monitored and inspected, either on a scheduled or unscheduled basis; the methods to be used; frequency of monitoring and inspection; the format and content of records and reports to be generated; and the title(s) of the individual(s) who will perform the monitoring and inspection. It shall include, but is not limited to: the method for identifying and preventing deficiencies in the quality of services performed before the level of performance can become unsatisfactory; the administrative procedures to be followed for reporting to the Contracting Officer’s Technical Representative (COTR); and for responding to operational problems or complaints concerning work performance, qualifications, or other complaints about Contractor personnel; and preparation of system of on-site records of all inspections conducted by the Contractor and the corrective action(s) taken. This documentation shall be available to the Government at all times during the term of the contract. The Contractor shall provide to the COTR a detailed monthly summary of all quality control actions, including descriptions of events which require quality control activity, and the corrective action taken. E.2.3 Government Quality Assurance Responsibilities The Government will monitor the Contractor’s performance using predetermined quality assurance surveillance procedures to examine and determine compliance with contract performance requirements. A copy of these procedures will be provided to the Contractor prior to the start of contract performance. In keeping with the Government’s responsibility for quality assurance, the Government reserves the right to review all administrative, managerial, and statistical reports; telecommunications services; publicity materials and resource library materials using the Performance Requirements Summary. A copy of the Performance Requirements Summary will be provided to the Contractor prior to the start of contract performance. Final determination that reports, resource and publicity materials, and services rendered meet the requirements is solely the responsibility of the Government. All surveillance observations will be recorded by the Government. When an observation indicates defective performance, the Quality Assurance Evaluator (QAE) will request that the Contract Manager or designee initial the observation record. The Contractor shall, within 48 hours, notify the Contracting Officer, or his/her technical representative if so directed by the Contracting Officer, of the corrective action(s) taken in accordance with methods and techniques specified by the Contractor in its quality control plan. If the Contractor disputes any part of the QAE’s observation, he/she shall request that the Contracting Officer hold a Performance Evaluation Meeting. E.2.3.1 Performance Evaluation Meetings The Contract Manager may be required to meet with the COTR, the QAE, and the Contracting Officer whether by telephone or at a designated Contractor-operated location on at least a weekly basis during the first month after the issuance of a Task Order under this contract. Meetings will be held as often as necessary thereafter at the discretion of the Contracting Officer or the COTR. However, a meeting will be held whenever a contract discrepancy report is issued. A mutual good faith effort will be made to resolve all problems identified. The COTR will write the minutes of these meetings, and the minutes will be signed by the Contract Manager and the COTR. The attendee will, within three (3) business days, identify any areas wherein he/she does not agree by proving written notice to the COTR. $%&`’ “ Й К Л г д з  ) 8 y œ Ѓ Ў в м ц ч  X m Ж Ф щ ъ љ о у * Z И Ъ ;cgЁz„-._`ђчовоХоЕХЊХо оšоšоš‘šоš‘šоš‘š‘šво…оšо…оšоšоšоšоšоšоšhШ[ohФQŸ5CJaJhЕ khФQŸCJ hФQŸCJhЕ khФQŸ5CJhI]šhФQŸ0JCJjhI]šhФQŸCJUjhI]šhФQŸCJUhфAŸhФQŸ5CJaJhI]šhФQŸCJhI]šhФQŸCJaJhї'.hФQŸ5>*CJaJ4 $%&`ж з   Ђ Ѓ м  b Ф щ ъ љ ъиЦЦБЦЦиЦЦЦžžžžЦЦБ$ Ца8 pм#a$gdФQŸ$ Ца8 pdha$gdФQŸ$ Ца8 pa$gdФQŸ$ Ца8 pa$gdФQŸ$ Ца8 pdha$gdФQŸ$ўљ ) * Z QR"#КЛээиээээƒэU$ & F Ц8 pEЦ€vcЗ†oa$gdФQŸ$ Ца8 pdha$gdФQŸ$ Ца8 pa$gdФQŸ ЛЯаLM‚ƒЊ˜C˜˜˜U$ & F Ц8 pEЦ€vcЗ†oa$gdФQŸ$ Ца8 pa$gdФQŸU$ & F Ц8 pEЦ€vcЗ†oa$gdФQŸ`eiƒ‰“ЗЛХљ0: *cmглмќ(Dx#$їёїхмхїёїёїёїёїёїамаїёїёЬhФQŸhJhФQŸ5CJaJhФQŸ5CJaJh vhФQŸ5CJaJ hФQŸCJhI]šhФQŸCJƒЗвгќ#$ъииъиииж$ Ца8 pa$gdФQŸ$ Ца8 pdha$gdФQŸ,1hАа/ Ар=!А"А# $ %ААаАа айDаЩъyљКЮŒ‚ЊKЉ http://www.arnet.gov/farрЩъyљКЮŒ‚ЊKЉ 2http://www.arnet.gov/far†œ<`ёџ< ФQŸNormalCJ_HmH sH tH DA@ђџЁD Default Paragraph FontRiѓџГR  Table Normalі4ж l4жaі (kєџС(No List0U`Ђё0 ФQŸ Hyperlink>*B*$.џџџџ $%&`жзЂЃмbФщъљ)*ZQR" # К Л Я а L M ‚ ƒ З вгќ#&˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@' 0€Пк˜@0€Пк˜@' 0€Пк˜@0€Пк˜@' 0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пк˜@0€Пкша00€ $%&`жзЂЃмbФщъљ)*ZQR" # К Л Я а L M ‚ ƒ З вгќ#&š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@ 0€€š@0€€š@ 0€€š@0€€š@ 0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€š@0€€˜@0€€˜@0€€˜@0€€ 00#`$љ Лƒ$$’Кг$Xџ„ŒŽJKfk&„Œа л &333&ЖA%ЄіЪVџџџџџџџџџh„а„˜ўЦа^„а`„˜ўOJQJ^Jo(‡hˆHoh„ „˜ўЦ ^„ `„˜ўOJQJ^Jo(‡hˆHoh„p„˜ўЦp^„p`„˜ўOJQJo(‡hˆHЇ№h„@ „˜ўЦ@ ^„@ `„˜ўOJQJo(‡hˆHЗ№h„„˜ўЦ^„`„˜ўOJQJ^Jo(‡hˆHoh„р„˜ўЦр^„р`„˜ўOJQJo(‡hˆHЇ№h„А„˜ўЦА^„А`„˜ўOJQJo(‡hˆHЗ№h„€„˜ўЦ€^„€`„˜ўOJQJ^Jo(‡hˆHoh„P„˜ўЦP^„P`„˜ўOJQJo(‡hˆHЇ№ЖA%џџџџџџџџ         хФQŸџ@€##˜SE##$p@џџUnknownHLџџџџџџџџџџџџG‡z €џTimes New Roman5€Symbol3& ‡z €џArial?5 ‡: џCourier New;€Wingdings"qˆ№аhс+Уfс+УfMз (Mз (!№ ДД242ƒq№HX)№џ?фџџџџџџџџџџџџџџџџџџџџџФQŸ2џџ SECTION EAdam R. GoldsteinAdam R. Goldstein ўџр…ŸђљOhЋ‘+'Гй0ˆ˜ЌИдрьќ $ D P \hpx€ф SECTION EAdam R. GoldsteinNormalAdam R. Goldstein1Microsoft Office Word@@цjШ@цjШMзўџеЭеœ.“—+,љЎDеЭеœ.“—+,љЎ4№ hp|„Œ” œЄЌД М вфGSA( '  SECTION E TitleД 8@ _PID_HLINKSфAlHUhttp://www.arnet.gov/farї ўџџџўџџџ!"#$%&'()*+ўџџџ-./0123ўџџџ56789:;ўџџџ§џџџ>ўџџџўџџџўџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџRoot Entryџџџџџџџџ РFаBA0Ш@€Data џџџџџџџџџџџџ1Tableџџџџ іWordDocumentџџџџ..SummaryInformation(џџџџџџџџџџџџ,DocumentSummaryInformation8џџџџџџџџ4CompObjџџџџџџџџџџџџqџџџџџџџџџџџџўџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџўџ џџџџ РFMicrosoft Office Word Document MSWordDocWord.Document.8є9Вq