Home > Electronic Reading Room > Document Collections > Commission Documents > Commission Action
Memoranda (COMs and COMSECYs) > 2003
> COMSECY-03-0031
COMSECY-03-0031
July 14, 2003
MEMORANDUM TO: |
Chairman Diaz
Commissioner McGaffigan
Commissioner Merrifield |
FROM: |
William D. Travers /RA/
Executive Director for Operations |
SUBJECT: |
ANNUAL REVIEW OF REGULATORY GUIDE 1.174 AND SRP CHAPTER 19 (WITS199800100) |
In a staff requirements memorandum dated May 20, 1998, the Commission
requested that annual reviews be conducted of Regulatory Guide (RG) 1.174,
"An Approach for Using Probabilistic Risk Assessment in Risk-Informed
Decisions on Plant-Specific Changes to the Licensing Basis," and Standard
Review Plan (SRP) Chapter 19, "Use of Probabilistic Risk Assessment in
Plant-Specific, Risk-Informed Decisionmaking," and that the periodic reviews
and updates be tracked in the PRA Implementation Plan, now the Risk-Informed
Regulatory Implementation Plan (RIRIP).
Revisions 1 of RG 1.174 and SRP Chapter 19 were issued in November 2002
with relatively minor enhancements. No significant items have been identified
since that time that would cause the staff to revise these documents.
The staff proposes to discontinue the current requirement for an annual
status report on these two documents for the following reasons:
-
RG 1.174 and SRP Chapter 19 were first issued in 1998 and were revised
last year. The staff now sees these documents as mature. Industry
applications based upon the RG are well established and mostly straightforward.
Furthermore, stakeholders are not calling for additional revisions
at this time. Therefore, the staff does not see a need for a revision
to the RG within the next year or on any specific schedule. If a future
revision to the RG is deemed necessary, adequate communication to
all parties will precede its publication, such as public workshops
and advisory committee presentations.
-
Staff resources are being focused on the other risk-informed RGs
where there is a greater perceived need for revision. For instance,
the staff is revising RG 1.178, "An Approach for Plant-Specific, Risk-Informed
Decisionmaking: Inservice Inspection," which was also issued originally
in 1998 and which has been endorsed and widely applied by the industry.
The staff expects to issue the revision in August 2003. The staff
is also developing DG-1122, "An Approach for Determining the Technical
Adequacy of PRA Results for Risk-Informed Activities." It is intended
to provide industry with guidance for determining the quality of PRA
components. The staff will continue to inform the Commission of the
status of these and other risk-informed activities.
-
Other risk-informed initiatives, such as revisions to 10 CFR 50.46,
are currently underway. Ultimately, these initiatives may point to
the need for a revision to RG 1.174. However, in that case it would
be more appropriate to discuss the proposed changes in the context
of the overall risk-informed activity rather than on a stand-alone
basis as is currently done once a year.
Unless otherwise directed by the Commission, the staff plans to pursue
the course of action herein, namely, to discontinue annual reporting on
RG 1.174 and SRP Chapter 19. Future communications regarding these and
other risk-informed regulatory guides will be integrated into the individual
risk-informed initiatives, as described in the RIRIP.
SECY please track.
Contact: |
John C. Lane, RES
(301) 415-6442 |
|