skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

IN RESPONSE, PLEASE
REFER TO: M061109B

November 13, 2006

MEMORANDUM FOR:

Luis A. Reyes
Executive Director for Operations

FROM: Annette L. Vietti-Cook, Secretary /RA/
SUBJECT: STAFF REQUIREMENTS - BRIEFING ON DRAFT FINAL RULE - PART 52 (EARLY SITE PERMITS/STANDARD DESIGN CERTIFICATIONS/COMBINED LICENSES), 9:30 A.M., THURSDAY, NOVEMBER 09, 2006, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)

The Commission was briefed by the NRC staff and industry representatives on the draft final rule to update 10 CFR Part 52 (Early Site Permits/Standard Design Certifications/Combined Licenses).

The Commission supports the staff holding a public meeting as soon as reasonably possible to discuss and possibly resolve comments raised on the draft final Part 52 rule, including section 52.99, inspection during construction. The staff should reach out to interested stakeholders to ensure they are informed of the public meeting. The staff should report the results of the meeting shortly following the meeting, so that the Commission can complete voting on the final rule in an expeditious manner.

The staff should brief the Commission Technical Assistants on the intent of the draft rule language regarding applicant or licensee responsibilities for inclusion of international operating experience insights into license applications and plant design.

The staff should provide regular Commission briefings on preparation for combined license applications.

cc: Chairman Klein
Commissioner McGaffigan
Commissioner Merrifield
Commissioner Jaczko
Commissioner Lyons
OGC
CFO
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR


Privacy Policy | Site Disclaimer
Thursday, February 22, 2007