MEMORANDUM TO: |
William D. Travers
Executive Director for Operations |
FROM: |
Annette L. Vietti-Cook, Secretary /RA/ |
SUBJECT: |
STAFF REQUIREMENTS - SECY-01-0099 - RULEMAKING PLAN AND ADVANCE
NOTICE OF PROPOSED RULEMAKING: ENTOMBMENT FOR POWER REACTORS |
The Commission has approved the staff's rulemaking plan for potential
development of a rule to allow entombment as a decommissioning option
for power reactors. The Commission has approved publication of the Advance
Notice of Proposed Rulemaking (ANPR) in the Federal Register
subject to the changes noted in the attachment. Also, the staff should
either revise the Federal Register notice to include a more substantial
plain language discussion of the issue and options or include in the Federal
Register notice a reference to another paper that provides a more
in-depth plain language discussion. If the additional paper option is
chosen, the paper should be easily retrievable by a member of the public
(i.e. on the web) and should be available in a time frame which allows
for public review and comment during the comment period allowed for the
notice.
|
(EDO) |
(SECY Suspense: 10/19/01) |
The staff should assess the number of licensees that are likely to pursue
entombment as a decommissioning option as part of the ANPR. This information
should be considered by staff in formulating a recommendation on which
option to pursue.
Attachment: Changed to the Federal Register
Notice in SECY-01-0099
cc: |
Chairman Meserve
Commissioner Dicus
Commissioner McGaffigan
Commissioner Merrifield
OGC
CFO
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR |
Attachment
Changed to the Federal Register Notice in SECY-01-0099
-
On page 4, last paragraph, revise line 2 to read ' ... in termination
of the its license.'
-
On page 5, delete the sentence in lines 1 through 3 from the top
(This collection of ... source term.)
-
On page 5, 1st full paragraph, revise line 4 to read '
... prevent inadvertent intrusion into the containment
intruder exposures (e.g., use ....'
-
On page 5, 2nd full paragraph, revise line 2 to read '
... depends on the specific ....'
-
On page 5, last paragraph, revise line 6 to read ' ... other site-specific
factors, such ....'
-
On page 6, paragraph 1, revise line 9 to read ' ... Part 20, Subpart
E. Thus, the , such that ....'
-
On page 7, last paragraph, revise line 1 to read ' ... this option
is that in some cases current ....' Revise line 3
to read ' ... flexible in some cases to achieve ....' Revise
line 4 to read ' ... regulating by exemption. Also, additional
resources would be requested to process the site-specific exemptions
for extension of time if ....' Revise lines 6 and 7 to read
' ... health and safety reasons it may require additional
resources to process the site-specific exemptions for extension of
time. Another disadvantage ....'
-
On page 8, revise lines 3 and 4 from the top to read ' ... over the
entombment. For example, Therefore, States
and compacts have authority for disposal of LLW ,
and might may prescribe means ....'
-
On page 8, 2nd full paragraph, revise line 7 to read '
... acceptable for restricted or unrestricted release.'
-
On page 9, revise lines 1 and 2 from the top to read ' ... permits
flexibility in defining of requirements
to meet for a broad variety of possible
situations, which . This would result
in ....' Revise line 4 to read ' ... than compared
to retaining a disposal license, as ....'
-
On page 9, 1st full paragraph, revise line 5 to read '
... as in Option 1, is that Option 2 it
does ....' Revise line 11 to read ' ... entombment. For example,
Therefore, States and compacts have authority for
disposal of LLW and might may ....'
-
On page 9, last paragraph, revise lines 2 and 3 to read ' ... characterized
as a disposal, rather than ....'
-
On page 10, last paragraph, revise the last 3 lines to read ' ...
have ever been entombed, and given the potential
source term for a power reactor, setting performance objectives and
continuation of an NRC license would permit greater confidence that
the dose criteria ....'
-
On page 11, paragraph 1, revise lines 1 through 3 to read ' ... does
not terminate the license and may raise questions as to why
the radiological dose criteria for license termination alone are not
adequate for protecting public health and safety.' Revise
lines 7 and 8 to read ' ... disposal facilities, subject to
however, DOE's has overall
....'
-
On page 13, paragraph 1, revise line 1 to read ' ... The
Thus, the NRC is considering that
approval of ....' Revise line 2 to read ' ... entombment be
based on a ....'
-
On page 13, combine paragraphs 1 and 2 into a single paragraph.
-
On page 13, last paragraph, delete the comma in line 2. Revise the
last 2 lines to read ' ... to occupational workers but these
exposures can be maintained within regulatory limits.
-
On page 14, delete the 1st full paragraph (Alternatively,
it may be possible ... classified as LLW.)
-
On page 15, revise D.3 to read ' ... other issues not covered
above for an ....'
- On page 15, item D.4, line 2, move footnote 2 to after 'categories'.
|