March 24, 1998

MEMORANDUM TO: L. Joseph Callan
Executive Director for Operations
FROM: John C. Hoyle /s/
SUBJECT: STAFF REQUIREMENTS:SECY-97-205 - INTEGRATION AND EVALUATION OF RESULTS FROM RECENT LESSONS-LEARNED REVIEWS

After carefully considering the various options presented in SECY-97-205 and the information provided at the December 17, 1997 Commission briefing on the issues addressed in the paper, the Commission approved only the short term actions proposed by the staff under Option 5 (as expanded by those portions of Options 1 and 2, as noted specifically below). As a result, the staff should take the following specific actions:

(EDO) (SECY Suspense:  7/10/98)
(EDO) (SECY Suspense:  4/17/98)
(EDO) (SECY Suspense:  7/10/98)

Although the Commission did not provide a majority to initiate the long term recommendations within Option 5 that would have led to the development of much broader implementation of risk-informed decision making and oversight of NRC regulations from a risk perspective, the Commission believes that the steps outlined above are the necessary prerequisite to constructive engagement in the long term. The staff is requested to provide a status report on the effectiveness of these short-term activities and recommendations on whether to pursue more resource intensive and high-impact long term actions. Concurrently, the staff should consider and make recommendations, as appropriate, regarding the "scope" of 50.59. The staff should continue to develop guidance regarding design basis issues, such as specifying the type of information to be considered as design-basis information (as discussed in Option 2).

(EDO) (SECY Suspense:  2/26/99)

The staff should continue with the Commitment Management related actions (Short Term Action 4, from SECY-97-036).

cc: Chairman Jackson
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
OGC
CIO
CFO
OCA
OIG
Office Directors, Regions, ACRS, ACNW, ASLBP (by E-Mail)
PDR
DCS


SECY NOTE:  This SRM and the Commission Voting Record will be made publicly available 5 working days after the date of this SRM. SECY 97-205 and the initial SRM on SECY-97-205 were made publicly available on October 2, 1997.