INFORMATION REPORT

SECY-08-0012

January 25, 2008

For: The Commissioners
From: Vonna L. Ordaz, Assistant for Operations, Office of the EDO
Subject: WEEKLY INFORMATION REPORT - WEEK ENDING JANUARY 18, 2008

Contents Enclosure
Nuclear Reactor Regulation A*
New Reactors B*
Nuclear Material Safety and Safeguards C*
Federal and State Materials and Environmental Management Programs D*
Nuclear Regulatory Research E
Nuclear Security and Incident Response F*
Administration G
Information Services H
Chief Financial Officer I*
Human Resources J
Small Business & Civil Rights K*
Enforcement L*
Public Affairs M
International Programs N*
Secretary O
Region I P*
Region II P*
Region III P*
Region IV P*
Executive Director for Operations Q*
Congressional Affairs R*
*No input this week.

/RA/

Vonna L. Ordaz
Assistant for Operations, OEDO

Contact:
L. Rakovan, OEDO


Enclosure E

Office of Nuclear Regulatory Research (RES)
Items of Interest
Week Ending January 18, 2008

Meeting of the Interagency Nuclear Safety Review Panel (INSRP) on the Mars Science Laboratory '09 (MSL09) Mission

On January 8 and 9, RES staff met with the National Aeronautics and Space Administration (NASA) project team for the MSL09 mission.  The purpose of the meeting was to review the draft Safety Analysis Report for the mission and to discuss the schedule for development of the Final Safety Analysis Report (FSAR) and the independent INSRP Safety Evaluation Report (SER).  The FSAR is scheduled to be completed in the summer of 2008, and the SER is scheduled to be finalized in the fall of 2008.

Workshop on Low Probability of Rupture in Primary Water Stress Corrosion Cracking (PWSCC) Systems

From January 9 - 11, staff conducted an international workshop that included discussions on the current state of knowledge, potential knowledge gaps and identification of areas of conservatism/non-conservatism for PWSCC.  The workshop also addressed quantification of uncertainties in developing probabilistic fracture mechanics analytical tools that can quantify the effects of PWSCC and other degradation mechanisms on the probability of fluid system piping rupture.  PWSCC is a concern for piping systems designated and approved for leak-before-break in pressurized water reactor (PWR) plants.


Enclosure G

Office of Administration (ADM)
Items of Interest
Week Ending January 18, 2008

Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities; Issuance of Draft Regulatory Guide (Part 73)

On January 15, 2008 (73 FR 2435), the NRC published a document in the Federal Register announcing the availability of a draft regulatory guide for comment (DG-5015 – Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities).  The draft regulatory guide provides licensees with an approach that would be acceptable to the NRC for training and qualifying security personnel at their facilities.  The comment period for this action closes February 25, 2008.

George Barnet; Denial of Petition for Rulemaking (PRM-20-27)

On January 17, 2008 (73 FR 3221), the NRC published a document in the Federal Register that denies a petition for rulemaking submitted by George Barnet (PRM-20-27).  The petitioner requested that the NRC amend its regulations concerning obtaining approval for radioactive material disposal procedures by broadening their scope to allow for the recycling of materials.  The NRC is denying the petition because the issues raised by the petition fall within the scope of the rationale for a recent Commission decision not to conduct a rulemaking in the area of setting radiological criteria for the disposition of solid materials.  The Commission believes that the current NRC approach for the disposition of solid materials is fully protective of public health and safety.


Enclosure H

Office of Information Services (OIS)
Items of Interest
Week Ending January 18, 2008

Freedom of Information Act (FOIA) and Privacy Act (PA) Requests Received During the Period of January 11, 2008 through January 17, 2008

NRC license 34-29200-01MD FOIA/PA-2008-0088
Allegation RIV-1999-A-0041 including all correspondence between NRC and named individual FOIA/PA-2008-0089
August 9, 2007, meeting between NRC and GE-Hitachi Nuclear Energy Americas regarding pre-application issues, copy of NRC presentation handouts FOIA/PA-2008-0090
Indian Point 3, memo from T. King to J. Zwolincki, regarding Individual Plant Examination of External Events (IPEEE) Submittal, November 15, 2000 FOIA/PA-2008-0091
Investigation report on named individual, May 2006 and July 2006 FOIA/PA-2008-0092
Radioactive material licenses for companies near Pope AFB, Cumberland County, North Carolina, listing of cities provided FOIA/PA-2008-0093
Radioactive material licenses for companies near McChord AFB, Pierce County, Washington, listing of cities provided FOIA/PA-2008-0094
St. Lucie, Florida Power and Light, all communications regarding incidental capture of threatened and endangers species, 2003, 2004, 2005, 2006 and to August 2007 (Referral by NOAA, Dept of Commerce) FOIA/PA-2008-0095
STPNOC COL application, all records associated with compilation of acceptance review inputs of whether to docket an application, September 20, 2007, to present FOIA/PA-2008-0096
Nuclear Fuel Services, docket no. 70-143, license SNM-124, all inspection reports and notices of violations for 2003, 2004, 2005, 2006, and 2007 FOIA/PA-2008-0097
Office of Investigations report 4-2007-006, including transcript of named individual FOIA/PA-2008-0098
Director's Decision dated March 10, 2005 for Entergy Nuclear Operations, Vermont Yankee, docket 50-271; and Carolina Power and Light Co., Shearon Harris Nuclear, LBP-07-11 (ML0721504472) FOIA/PA-2008-0099
Cabot Corp., a.k.a. The Beryllium Corp, NGK Metals Corp, Cabot Berylco Inc., Kawecki Berylco Inc, KBI, Kawecki Berylco Industries, Kawecki Chemicals, Berylco Inc, residing at 150 Tuckerton Road, Reading, Pennsylvania 19605, all records FOIA/PA-2008-0100
Indian Point, 8th Quarterly Seismic Report, March - May 1977; and 13th Quarterly Seismic Report, June - August 1978 FOIA/PA-2008-0101

Enclosure J

Office of Human Resources (HR)
Items of Interest
Week Ending January 18, 2008

Arrivals
BEALL, ROBERT PROJECT MANAGER (MULTIPLE) NRR
CALLE, JOSELITO SENIOR CONSTRUCTION INSPECTOR RII
DIPALO, ANTHONY PROJECT MANAGER NMSS
FLORES, GREG PERSONNEL SECURITY SPECIALIST ADM
GRAIZER, VLADIMIR GEOPHYSICIST (SEISMOLOGY) NRO
GREYNOLDS, ELENA IT SPECIALIST (SYSANALYSIS) NRO
KENNEDY, MICHAEL ADMINISTRATIVE JUDGE (TECHNICAL) ASLBP
MABRY, YVETTE MANAGEMENT ANALYST/AUDITOR OIG
MARTIN, GILLIAN HUMAN RESOURCES TEAM LEADER HR
MASTERS, ANTHONY CONSTRUCTION PROJECT INSPECTOR RII
MATHEWS, ROBERT ADMINISTRATIVE JUDGE (TECHNICAL) ASLBP
TRIMBLE, JR., DAVID CONSULTANT NRO
Departures
FAIRBANKS, ABIN REACTOR INSPECTOR (NSPDP) RIV
LEE, MICHAEL MANAGEMENT ANALYST TRAINEE (CO-OP) NRR
MONROE, SHIRLEY HUMAN RESOURCES SPECIALIST RI
ORTIZ-MORALES, GRISEL STUDENT ENGINEER (CO-OP) RES
UNIKEWICZ, STEVEN SENIOR MECHANICAL ENGINEER NRR

Enclosure O

Office of Public Affairs (OPA)
Items of Interest
Week Ending January 18, 2008

OPA Received Significant Media Inquiries on the Following:

Inattentive Guards incident at Peach Bottom nuclear plant

Oyster Creeks nuclear plant license renewal application and an appeal in the proceedings

Vermont Yankee nuclear power plant's decommissioning funding issues

South Texas Combined License application and the expectations of the environmental scoping meetings

NRC received Bellefonte's new reactor application and the amended AP1000 reactor design application

NRC's confirmatory order issued against San Onofre nuclear plant involving deliberate misconduct by plant employees

Other Public Affairs Items:

OPA supported coordination of the Department of Homeland Security's rollout of the new National Response Framework.

Press Releases
Headquarters:
08- 005 NRC Announces Expanded Photo Gallery on Its Web Site (1/14)
08-006 Mitsubishi Application to Certify US-APWR Design Available on NRC Website (1/18)
Regions:
III-08-001 NRC Proposes $3,250 Fine for Violation Associated with Theft Of Nuclear Gauge from Southfield, Mich., Firm (1/14)
IV-08-004 NRC Orders Changes at San Onofre Nuclear Generating Station (1/14)
IV-08-005 NRC Assigns New Senior Resident Inspector at Grand Gulf Nuclear Plant (1/15)
IV-08-006 NRC Conducting Special Inspection at Wolf Creek Nuclear Plant (1/16)

Enclosure O

Office of the Secretary (SECY)
Items of Interest
Week Ending January 18, 2008

Document Released
to Public
Date Subject
Decision Documents
  1. SECY-07-0224
12/29/07 Final Rule: Regulatory Improvements to the Nuclear Materials Management and Safeguards System (RIN 3150-AH85)
  1. SECY-07-0225
12/29/07 Revision of NUREG-0654, Supplement 3, "Criteria for Protective Action Recommendations for Severe Accidents"
Information Papers
  1. SECY-08-0001
12/29/07 Status Update on Consultation With Native American Tribes Who May be Affected by a Commercial Reactor Proposed for Galena, Alaska
Memoranda
  1. M080115
1/15/08 Staff Requirements - Affirmation Session:  I. SECY-07-0193 – PG&E Co. (Diablo Canyon ISFSI), Docket No. 72-26-ISFSI, San Luis Obispo Mothers For Peace's Contentions And Request For Hearing Re Diablo Canyon Environmental Assessment Supplement; II. SECY-07-0214 – Pilgrim Nuclear Power Station License Renewal Pilgrim Watch's Appeal Of Interlocutory Board Order Summarily Disposing Of Contention 3 (Samas) (LBP-07-13)

Commission Correspondence

  1. Letter to Clay Johnson, OMB dated January 2, 2008, provides appointment of NRC's Performance Improvement Officer.

  2. Letter to Shian-Jang Su, Taiwan, dated January 2, 2008, responds to recent letter and    invitation to visit Taiwan.

  3. Letter to Senator Thomas Carper, et al., dated December 31, 2007, provides a summary of actions taken by the NRC in response to recommendations made by GAO, "Nuclear  Energy: NRC's Workforce and Processes for New Reactor Licensing Are Generally in  Place, but Uncertainties Remain as industry Begins to Submit Applications," GAO-07- 1129.

Federal Register Notices Issued

  1. ASLBP Designation of Presiding Officer - Diablo Canyon Power Plant Independent Spent Fuel Storage Installation.

  2. ACRS Subcommittee Meeting on Planning and Procedures Notice of Meeting (February 6, 2008).

  3. ACRS Subcommittee Meeting on Safety Research Program Notice of Meeting (February 5, 2008).