POLICY ISSUE
INFORMATION

SECY-00-0149

June 30, 2000

TO: The Commissioners
FROM: William D. Travers
Executive Director for Operations
SUBJECT:       SUMMARY OF ACTIVITIES RELATED TO GENERIC SAFETY ISSUES

PURPOSE:

To provide the annual summary of activities related to generic safety issues (GSIs).

BACKGROUND:

It has been the practice of the staff to provide the Commission with an annual update of the progress made in resolving GSIs. This practice was reinforced by the Commission in a Staff Requirements Memorandum (SRM) of May 8, 1998, in response to SECY-98-030, "Implementation of DSI-22, Research." In this SRM, the Commission directed the staff to provide an annual summary of activities related to open reactor and non-reactor GSIs.

The current structure of the reactor Generic Issues Program was established in the 1980s and was intended to address the resolution of reactor GSIs and environmental issues, improvement in the licensing process, and the elimination of requirements that are overly conservative or unnecessarily restrictive or costly. The NRC process for addressing reactor generic issues from all sources, operational and non-operational, was approved by the Commission in 1983 and is delineated in NUREG-0933, "A Prioritization of Generic Safety Issues."

Up to 1995, the Generic Issues Program focused only on GSIs related to nuclear power plants. However, following a December 19, 1995, Commission briefing on mechanisms for addressing GSIs, the staff was requested to expand the program to include non-reactor GSIs identified by the Office of Nuclear Material Safety and Safeguards (NMSS). The NRC process for addressing non-reactor generic issues from all sources, operational and non-operational, is delineated in NMSS Policy and Procedures Letter 1-57, Rev. 1, October 1997.

In addition to the processes documented in NUREG-0933 and NMSS Policy and Procedures Letter 1-57, Management Directive 8.5, "Operational Safety Data Review," addresses the roles of each affected office in the identification of generic issues resulting from the review of operational data.

In 1998, the staff conducted a self-assessment of the generic issues processes and recommended changes to improve efficiency, timeliness, and clarity. Whereas the original process contained six steps (discussed below), the proposed revised process will contain eight steps with the following changes: (1) the prioritization step, in which the relative priority ranking of high, medium, low, and drop was used to determine whether resources should be assigned to an issue, will be replaced by two steps, initial screening and technical screening, in which a determination will be made to continue work on an issue or drop it; (2) the resolution step will be replaced by two steps, a technical assessment step and a regulations and guidance development step; and (3) the imposition step will be replaced by a regulation and guidance issuance step. A new Management Directive 6.4, "Generic Issue Program," was developed by the staff to institute these changes. The revised process addresses adequate protection issues, substantial safety enhancement, and burden reduction initiatives. The staff is performing a trial application of this new process, as recommended by the Advisory Committee on Reactor Safeguards (ACRS), and is expected to report its findings to the ACRS by the end of 2000. Generic issues identified after March 1999 are being evaluated with the proposed revised process.

DISCUSSION:

Reactor GSIs

The original process for addressing reactor GSIs delineated in NUREG-0933 consists of six steps: identification, prioritization, resolution, imposition, implementation, and verification. Generally, safety concerns associated with operating events, research results, or risk assessments form the basis for the identification of GSIs by the staff, the ACRS, industry, or the public. After a GSI is identified, it is prioritized to determine whether resources should be expended in pursuit of a resolution. GSIs associated with nuclear reactor power plants are prioritized by the Office of Nuclear Regulatory Research (RES) using the methodology of NUREG-0933. The prioritization step is generally completed with a quantitative analysis of the risk reduction potential of the issue and a priority ranking of HIGH, MEDIUM, LOW, or DROP. GSIs with rankings of HIGH or MEDIUM would be able to meet the "substantial increase in the overall protection of the public health and safety" requirement of 10 CFR 50.109 and are selected for resolution. No additional action is taken on reactor GSIs in the LOW-priority and DROP categories.

Upon completion of the prioritization step, all reactor GSIs that meet the requirement of substantial increase in public health and safety are assigned for resolution by the RES Director, with the majority of these assignments made to RES. The Office of Nuclear Reactor Regulation (NRR) is assigned those reactor GSIs that require extensive interface with operating plants. Resolution of a reactor GSI requires a cost-benefit analysis of a proposed solution after consideration of the options to improve safety. Some action is taken on those for which the cost-benefit analysis shows that "the direct and indirect costs are justified in view of this increased protection" (10 CFR 50.109). The ACRS normally reviews the prioritization and resolution of GSIs associated with nuclear power plants. The schedules for the resolution of GSIs allow adequate time for ACRS review and resolution of ACRS comments.

In the imposition step, the staff issues requirements that may result from the resolution of the GSI, and the affected licensees are required to prepare schedules for implementing these requirements. Implementation covers the step in which the affected licensees perform actions on their operating plants to satisfy the commitments made during the imposition step. Finally, verification is accomplished by NRC inspection of licensee actions.

RES is responsible for: (1) resolving GSIs through the conduct of research; (2) tracking the status of all generic issues through the identification, prioritization, and resolution steps in the agency-wide Generic Issue Management Control System (GIMCS); and (3) documenting the prioritization and resolution results in NUREG-0933 and making it publicly available on the NRC Website. In addition to resolving some GSIs, NRR is responsible for managing the imposition, implementation, and verification of those GSIs that result in new requirements. Tracking GSIs through these final three steps is accomplished with the Safety Issues Management System (SIMS).

The following is a summary of the activities related to reactor GSIs since the last report to the Commission in SECY-99-185. All GSIs identified before March 1999 continue to be evaluated in accordance with the original process.

Non-Reactor GSIs

For non-reactor GSIs, NMSS is responsible for managing all six steps of the program described above, in accordance with the guidelines of NMSS Policy and Procedures Letter 1-57, Rev. 1. The status of the unresolved GSIs is tracked by RES in the GIMCS.

The following is a summary of the activities related to non-reactor GSIs since the last report to the Commission in SECY-99-185:

Assessment of Processes

The ACRS was briefed on the revised process and the new Management Directive 6.4, and ACRS comments were incorporated. Consistent with the ACRS recommendation, the staff is implementing a trial application of the new directive.

CONCLUSION:

Since the last report to the Commission in July 1999, the staff prioritized and resolved a combined total of seven reactor and two non-reactor GSIs. The staff will continue to use the processes of NUREG-0933 and NMSS Policy and Procedures Letter 1-5, Rev. 1, as well as the procedures of Management Directive 8.5, to identify, prioritize, and resolve reactor and non-reactor GSIs until the new process delineated in Management Directive 6.4 is approved by the Commission. The staff will continue to provide an annual update to the Commission and will inform the Commission of any significant results of the ongoing assessment.

/RA/

William D. Travers
Executive Director for Operations

Contact: Ronald C. Emrit, RES
(301) 415-6447
Attachments: 1. GSIs Prioritized and Resolved since July 16, 1999
2. Unresolved GSIs as of June 14, 2000


ATTACHMENT 1

GSIs Prioritized and Resolved Since July 16, 1999

GSI Number Title Identification
Date
Priority Lead
Office
Status
23 Reactor Coolant Pump Seal Failures 12/1980 HIGH RES Resolved. No additional generic regulatory requirements were found to be necessary. Plant-specific backfits will be pursued based on the NRC's plant-by-plant risk analysis of the loss of component cooling water/essential service water systems. The staff will work with the industry to develop additional RCP seal models to support future risk-informed licensing decisions.
145 Actions to Reduce Common Cause Failures 09/1988 HIGH RES Resolved. No additional regulatory requirements were found to be necessary. The staff developed a common cause failure (CCF) database and analysis software package to aid in system reliability analyses and related risk-informed applications. The industry was informed of the availability of the CCF database in Regulatory Issue Summary 99-03.
156.6.1 Pipe Break Effects on Systems and Components 02/1991 HIGH RES Re-prioritized with a HIGH-priority ranking for resolution. The technical approach for resolution of this issue has been developed (see Attachment 2) and is currently under RES management review. A meeting with NRR is planned by July 31, 2000, to obtain their view and comment on the approach. A detailed Task Action Plan will be developed based on the results of the NRR review and comment.
158 Performance of Safety-Related Power-Operated Valves Under Design Basis Conditions 09/1991 MEDIUM RES Resolved. No additional regulatory requirements were found to be necessary. The staff concluded that existing regulations are adequate to address the performance of safety-related power-operated valves under design basis conditions.
190 Fatigue Evaluation of Metal Components for 60-Year Plant Life 08/1996 HIGH RES Resolved. No additional regulatory requirements were found to be necessary. This conclusion was based on probabilistic analyses performed by the staff that showed low core damage frequencies resulting from fatigue failure of metal components. However, the nature of age-related degradation indicates the potential for an increase in the frequency of pipe leaks as plants continue to operate. Therefore, consistent with 10 CFR 54.21, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants: Contents of Application - Technical Information," licensees will have to address the effects of the reactor coolant system environment on component fatigue life, as aging management programs are formulated in support of license renewal.
B-17 Criteria for Safety-Related Operator Actions 06/1978 MEDIUM RES Resolved. No additional regulatory requirements were found to be necessary based on the staff's conclusion that the following actions taken by licensees, in response to regulatory requirements resulting from other programs that were issued since the issue was identified, addressed the safety concern: enhanced operator training and licensing requirements, including plant-specific simulators; improved training, based on the Systems Approach to Training for all covered staff; implementation of symptom-based emergency operating procedures; and the completion of the Individual Plant Examination (IPE) Program at all operating plants.
B-55 Improve Reliability of Target Rock Safety Relief Valves 06/1978 MEDIUM NRR Resolved. No additional regulatory requirements were found to be necessary. This conclusion was based on the staff finding that licensees had significantly improved the performance of Target Rock safety relief valves, and continue to evaluate and improve their performance. Licensee compliance with existing regulations, such as 10 CFR 50 Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," and 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," are sufficient for the staff to pursue additional improvements on a plant-specific basis, if needed.
NMSS-8 Year 2000 Computer Problem - Non-reactor Licensees 05/1998 HIGH NMSS Resolved. Health and safety were not compromised at materials licensee facilities due to the transition into the year 2000 or by the Leap Day (February 29, 2000). A lessons learned report and Generic Letter 98-03 closeout report were issued.
NMSS-15 Adequacy of Part 150 Criticality Requirements 06/1998 MEDIUM NMSS Resolved. SECY-99-272 issued November 23, 1999, recommended revising the Agreement State compatibility requirements in 10 CFR Part 61 and issuing new emplacement criticality guidance. In a Staff Requirements Memorandum dated January 5, 2000, the Commission disapproved the staff's proposal and directed the staff to stop work on the issue. The Commission concluded that the theoretical scenarios developed by the staff were unrealistic and failed to justify further efforts.


ATTACHMENT 2

Unresolved GSIs as of June 14, 2000

GSI Number Title Identification
Date
Priority Lead
Office
Status
156.6.1 Pipe Break Effects on Systems and Components 02/1991 HIGH RES This issue addresses the safety concern of whether the effects of pipe breaks inside the containment have been adequately addressed in the designs of some plants. A technical approach for resolving this issue has been developed. The staff is currently planning a meeting with NRR by July 31, 2000, to discuss the approach. The Task Action Plan should be completed by October 2000 if NRR is in basic agreement with the technical approach.
163 Multiple Steam Generator Tube Leakage 06/1992 HIGH NRR This issue addresses the safety concern associated with multiple steam generator tube leaks during a main steam line break that cannot be isolated. An ad hoc panel has been established to address a DPO related to this issue, and will make recommendations to the EDO for its resolution. NRR will develop a Task Action Plan for resolving this GSI after reviewing the EDO findings on the DPO. This action plan is scheduled to be completed by August 2000.
168 Environmental Qualification of Electrical Equipment 04/1993 HIGH RES Accelerated-aging tests on electrical equipment showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance. Failure of the cables during or following a design basis event could affect the performance of safety functions. LOCA tests are being conducted and the issue is scheduled to be resolved in December 2000.
170 Reactivity Transients and Fuel Damage Criteria for High Burn-up Fuel 01/1995 HIGH RES Work on the technical basis (i.e., fuel damage criteria at high burn-up) for a possible resolution is ongoing, and includes cooperative research with EPRI. Development of a technical basis for a possible resolution involves a long-term research effort.
172 Multiple System Responses Program (MSRP) 10/1989 HIGH RES Work performed by the industry is being reviewed to determine whether it adequately resolves the issue without new or revised requirements. Resolution is scheduled for February 2002.
173.A Spent Fuel Storage Pool: Operating Facilities 02/1996 HIGH NRR NRR has requested ACRS concurrence on its proposal to close the GSI with no new requirements. If the ACRS agrees, with this proposal, resolution of this GSI is expected to occur by August 2000, otherwise, a modified schedule will be developed.
191 Assessment of Debris Accumulation on PWR Sump Performance 09/1996 HIGH RES Development of a technical basis for a possible resolution involves a long-term research effort on coatings and debris transport to determine the potential severity of PWR sump blockage effects. Resolution is scheduled for September 2001.
NMSS-7 Criticality Benchmarks Greater than 5% Enrichment 05/1998 LOW NMSS The staff is developing and confirming the adequacy of tools for validating criticality calculations, including requests to process higher enrichments, to be used in licensing nuclear facilities. There is no scheduled resolution date.
NMSS-10 Troxler Gauge Source Rod Weld Failures 05/1998 MEDIUM NMSS The staff will work with the Agreement State of North Carolina to ensure that cracked source rods on Troxler moisture density gauges are repaired or replaced, and ensure the manufacturing process is reviewed and, as appropriate, modified to reduce the potential for recurrence. Resolution is scheduled for July 2000.
NMSS-14 Surety Estimates for Groundwater Restoration at In-Situ Leach Facilities 06/1998 MEDIUM NMSS This task is to develop a methodology for estimating the cost of groundwater restoration. The project is currently on hold. It will be reevaluated to determine if it should be modified or terminated, in response to a Commission response to SECY-99-013, regarding redefinition of regulatory responsibility at in-situ leach facilities. There is no scheduled resolution date.
NMSS-16 Adequacy of 0.05 Weight Percent Limit in Part 40 06/1998 MEDIUM NMSS The staff will determine whether the limit on "unimportant quantities" of source material adequately protects public health and safety. Options forwarded to the Commission on how to proceed with jurisdictional and technical issues on the regulation of source material were approved. There is no scheduled resolution date.