Public Meetings for Materials Decommissioning 2008

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.
Date Description
11/19-20/2008

Meeting Report re: Mtgs with Shieldalloy to Discuss Draft Requests for Additional Information re: NRC's review of the Engineered Barrier Design Report and Engineered Barrier Design

11/19-20/2008

Meetings with Sheildalloy Metallurgical Corporation to Discuss draft Request for Additional Information on Engineered Barrier Design and draft Request for Additional Information on ALARA Analysis, Cost Benefit Analyses and Potential Mixed Water in Slag Pile

10/21/2008 Meeting Report re: Meeting with with U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP), West Valley, NY to Continue discussions on dose modeling approach for DOE Phase 1 Decommissioning Plan for the WVDP
10/21/2008 Meeting Notice re: Forthcoming Meeting with U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP), West Valley, NY  to Continue discussions on dose modeling approach for DOE Phase 1 Decommissioning Plan for the WVDP
09/30/2008 Meeting Notice re: Forthcoming Open House on the Status of the NRC’s Review of the Shieldalloy Decommissioning Plan
09/03/2008 Meeting Report for Meeting with NASA to Discuss Results of Plum Brook dose modeling analysis and proposed options for demonstrating compliance with NRC requirements
09/03/2008 Meeting Notice re: Meeting with NASA to Discuss results of NASA's Plum Brook dose modeling analysis and proposed options for demonstrating compliance with NRC requirements
07/24/2008 Meeting With U.S. Department Of Energy West Valley Demonstration Project, West Valley, NY to Discuss the Dose Assessment Approach for the U.S. Department of Energy (DOE) Phase 1 Decommissioning Plan for the West Valley Demonstration Project
07/24/2008 Forthcoming Meeting With U.S. Department Of Energy West Valley Demonstration Project, West Valley, NY to Discuss the Dose Assessment Approach for the U.S. Department of Energy (DOE) Phase 1 Decommissioning Plan for the West Valley Demonstration Project
07/23/2008 Meeting To Discuss Data Quality Objectives For Next Phase Of Sampling At Jefferson Proving Ground And Submittal Of Addendum 7 To The Field Sampling Plan
07/23/2008 Meeting with NRC and Jefferson Proving Ground to discuss the Data Quality Objectives for the upcoming sampling events at Jefferson Proving Ground and contents of Addendum 7
05/19/2008 Meeting Summary re: Meeting with DOE/WVDP/NRC To Discuss The West Valley Demonstration Project Phase 1 Decommissioning Plan
05/19/2008 Meeting with U.S. Department of Energy West Valley Demonstration Project, West Valley, NY