|
Home > About NRC
> How We Regulate > Decommissioning > Public Involvement in Decommissioning > Public Meetings for Reactors Decommissioning 2008
Public Meetings for Reactors Decommissioning 2008
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Date |
Description |
11/05/2008 |
Meeting with Fermi-1 staff to provide status update regarding license termination planning
|
06/18/2008 |
Public meeting to Discuss and Accept Public Questions and Comments on the Zion Nuclear Power Station Proposed License Transfer and Draft Post Shutdown Decommissioning Activities Report
|
06/18/2008 |
Meeting with Zion Nucler Power Station to discuss and accept public comments on
the Zion Nuclear Power Station proposed license transfer and Zion Solutions draft Post Shutdown
Decommissioning Activities Report
|
06/11/2008 |
Summary of Meeting with Southern California Edison to Discuss release for unrestricted use of the off-shore portion of the circulating water system from San Onofre Nuclear Generating Station Unit 1 (SONGS)
|
06/11/2008 |
Public Meeting With San Onofre Nuclear Generating Station, Unit 1 re: Release for unrestricted use of the off-shore
portion of the circulating water system from SONGS Unit 1
|
03/05/2008 |
Report of March 5, 2008 Category 1 Meeting with FERMI-1To discuss license termination and site decommissioning plans for the Fermi-1 reactor
|
03/05/2008 |
Meeting With Fermi-1 Regarding Status Of License Termination Planning Development.
|
01/08/2008 |
Meeting Summary re: meeting with Exelon and Energy Solutions to discuss a proposal to transfer Zion's 10 CFR Part 50 license and the decommissioning trust fund from Exelon to a subsidiary of Energy Solutions (ES)
|
01/08/2008 |
Meeting to discuss a proposal to transfer Zion’s 10 CFR Part 50 license and the
decommissioning trust fund from Exelon to a subsidiary of Energy
Solutions, with the subsequent transfer of the spent fuel back to Exelon
after the site decommissioning is completed.
|
|