News and Correspondence for 2004

This page lists, in chronological order, general news and correspondence on Reactor Vessel Head Degradation for 2004.

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date
Description
Davis-Besse Nuclear Power Station NRC Integrated Inspection Report 05000346/2004015
Submittal of Independent Assessment Report of the Engineering Program Effectiveness at the Davis-Besse Nuclear Power Station
Davis-Besse NRC Update - December 2004 Issue
11/29/04 Correction of Information Provided Regarding Response to Generic Letter 95-07
NRC Triennial Fire Protection Baseline Inspection Report
Submittal of Independent Assessment Report of Corrective Action Program Implementation for the Davis-Besse Nuclear Power Station
Davis Besse Inspection Report 2004-014
Correction of Performance Indicator Data for the Davis-Besse Nuclear Power Station Alert
Letter to Sandy Buchanan - Ohio Citizen Action
Announcement of Special Inspection: Follow-up of Discrepant Alert and Notification System Performance Indicator
NRC Special Inspection - Management and Human Performance Corrective Action Effectiveness
Submittal of Independent Assessment Report of Operations Performance for the Davis-Besse Nuclear Power Station
LER 04-002-00 for Davis-Besse Nuclear Power Station, Unit No. 1 Regarding notification of an unplanned reactor trip during reactor trip breaker testing.
Davis Besse NRC Update - September 2004 Issue
Integrated Inspection Report
Transmittal of Preliminary Davis-Besse ASP Analysis for Internal and Licensee Peer Review
Request for Additional Information Regarding Root Cause Analysis Report
Revision to Commitments Related to Generic Letter 2003-01, "Control Room Habitability"
Davis-Besse Nuclear Power Station; NRC evaluations of changes, experiments, or tests and permanent plant modifications; Inspection Report 05000346/2004010(DRS)
Davis-Besse Nuclear Power Station; Flood Protection Measures, and Maintenance Effectiveness IR 05000346-04-008
Davis Besse NRC Update - July 2004 Issue
Re-submittal of Corrective Action Program Implementation Independence Assessment Plan for Davis-Besse Nuclear Power Station
Submittal of Engineering Program Effectiveness Independent Assessment Plan for the Davis-Besse Nuclear Power Station
Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 1
Davis-Besse Nuclear Power Station; Routine Integrated Inspection Report
Davis-Besse Nuclear Plant; Initial License Examination Report
Davis-Besse Response to Request for Additional Information Regarding Root Cause Analysis Report
Davis Besse NRC Update - May 2004 Issue
Davis-Besse Nuclear Power Station-Notice of Violation NRC Special Inspection-Completeness and Accuracy of Required Records and Submittals to the NRC-Report No.50-346/03-19(DRP)
Davis-Besse Nuclear Power Station NRC Integrated Inspection Report 05000346/2004006
Update on Structural Integrity Assessment of Davis-Besse Reactor Pressure Vessel Head with Corrosion Wastage Cavity
NRC Special Inspection Report 50-346/04-04 Restart Readiness Assessment Team Follow-Up Inspection.
NRC Integrated Special Inspection Report 05000346/2004002
Correction of Information Provided Regarding Status of the Design Basis Validation Program.

Correction to Response date for Request for additional information regarding the Davis-Besse root cause analysis of the reactor pressure vessel head degradation.

Davis-Besse Nuclear Power Station - Inspection Schedule Update
NRC Press Release III-04-011: NRC Approves Davis-Besse Restart
Approval to Restart the Davis-Besse Nuclear Power Station, Closure of Confirmatory Action Letter, and Issuance of Confirmatory Order
03/08/04

Davis-Besse Unit 1, Amendment, One-Time Extension of Steam Generator Tube Inservice Inspection

Confirmatory Order Modifying License (Effective Immediately)
Inspection Report 50-346/04-05 - HPI Pump Final significance Letter
NRC Special Team Inspection Report 50-346/02-10, Corrective Action Program Implementation and Notice of Violation
Request for additional information regarding root cause analysis submitted to the NRC concerning the reactor pressure information.
LER 04-001-00 for Davis-Besse, Unit 1 Regarding Violation of Steam and Feedwater Rupture Control System Technical Specification
NRC Special Inspection Report 50-346/03-12 - Management and Human Performance Root Cause Assessment Phase 3
Meeting Slides from NRC Commission Briefing on Status of Implementation of Davis-Besse Lessons Learned Task Force Recommendations

Recommendation for NRC to Approve Restart of the Davis-Besse Nuclear Power Station and Recommendation to Issue Confirmatory Order

Licensing Renewal Related Correspondence, Updated Forecast for Submittal of License Amendment Applications to Convert to the Improved Standard Technical Specifications and Renew the Operating License
02/23/04

Semiannual Report - Status of Implementation of Davis-Besse Lessons Learned Task Force Report Recommendations

Revised Order EA-03-009
Disposition of Reactor Vessel Head Sample Pieces "A2A7L," A2A7M," and A2A7N."
Request to Amend the Existing Exemption from 10 CFR 50.46 and 10 CFR 50, "Appendix K, for Boric Acid Precipitation Control Methodology.
Supplemental Information Regarding License Amendment Application to Revise Technical Specification 3/4.4.5, "Reactor Coolant System - Steam Generators (SG)," to Permit One-Time Extension of SG Tube Inservice Inspection Interval.
Davis Besse NRC Update - February 2004 Issue
Tech Spec Change, Related Correspondence, Correction of Information Provided in License Amendment Request No. 96-0008
Supplement to the Integrated Report to Support Restart of the Davis-Besse Nuclear Power Station
NRC Special Inspection - Restart Readiness Assessment Team Inspection Report No. 05000346/2003011 (DRP)
Supplemental Information Regarding License Amendment Application to Revise TS 3/4.5, "Reactor Coolant System - Steam Generators," to Permit One-Time Extension of Steam Generator Tube Inservice Inspection Interval.
NRC Special Inspection Report 50-346/03-19 - Completeness and Accuracy of Required Records and Submittals to the NRC
NRC Integrated Inspection Report 05000346/2003025
Davis Besse NRC Update - January 2004 Issue
Request for Exemption From 10CFR50, Appendix R, Section III.G.3 for Fire Area HH.
Supplemental Information Regarding License Amendment Applications to Modify Technical Specification 3/4.5.2, Emergency Core Cooling Systems - ECCS Subsystems
Response to Questions Regarding the 2002 Steam Generator Tube Inspections.
LER 03-011-01. Davis-Besse Unit 1 Inoperability of Containment Spray Pump 1 Due to Solid State Trip Device Ground Fault False Trip
NRC Special Inspection Report No. 05-346/03-24