Home > Nuclear Reactors > Operating Reactors
>
Operational Experience
>
Operating Experience Smart Sample (OpESS) Program
> Operating Experience Smart Samples - FY2007
Operating Experience Smart Samples -
FY2007
The following links on this page are to documents in Adobe Portable Document
Format (PDF). See our Plugins,
Viewers, and Other Tools page for more information. For successful
viewing of PDF documents on our site please be sure to use the latest
version of Adobe.
OpESS |
Date |
Description |
FY2007-04 |
08/27/07 |
Operating Experience Smart Sample (OpESS) FY 2007-04 "BWR Core Power / Flow Map - supplemental inspection
guidance for MC 2515D" |
FY2007-03 Rev.2 |
09/12/08 |
Crane and heavy lift inspection, supplemental guidance for IP-71111.20 |
FY2007-02 |
12/20/06 |
Flooding Vulnerabilities due to Inadequate Design and Conduit /
Hydrostatic Seal Barrier Concerns |
FY2007-01 |
11/20/06 |
PWR Containment Sump Recirculation Pipe Foreign Material Blockage |
|