1 1 UNITED STATES OF AMERICA 2 NUCLEAR REGULATORY COMMISSION 3 *** 4 BRIEFING BY DOE ON 5 PLUTONIUM DISPOSITION STRATEGY AND PROGRAM 6 *** 7 PUBLIC MEETING 8 *** 9 Nuclear Regulatory Commission 10 Commission Hearing Room 11 11555 Rockville Pike 12 Rockville, Maryland 13 14 Wednesday, September 17, 1997 15 16 The Commission met in open session, pursuant to 17 notice, at 9:18 a.m., the Honorable SHIRLEY A. JACKSON, 18 Chairman of the Commission, presiding. 19 20 COMMISSIONERS PRESENT: 21 SHIRLEY A. JACKSON, Chairman of the Commission 22 GRETA J. DICUS, Member of the Commission 23 EDWARD McGAFFIGAN, JR., Member of the Commission 24 NILS J. DIAZ, Member of the Commission 25 ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 2 1 STAFF AND PRESENTERS SEATED AT COMMISSION TABLE: 2 JOHN C. HOYLE, Secretary 3 KAREN D. CYR, General Counsel 4 HOWARD CANTER, Acting Director, Office of Fissile 5 Materials Disposition, DOE 6 DAVE NULTON, Director, Reactor Group, Office of 7 Fissile Materials Disposition 8 ANDRE CYGELMAN, Director, Materials & 9 Immobilization Group, Office of Fissile 10 Materials Disposition 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 3 1 P R O C E E D I N G S 2 [9:18 a.m.] 3 CHAIRMAN JACKSON: Good morning, ladies and 4 gentlemen. The Commission would like to welcome Mr. Howard 5 Canter, Director of DOE's Office of Fissile Materials 6 Disposition, and his colleagues. For the record, DOE is the 7 Department of Energy. 8 This morning the Commission will be briefed on two 9 things. 10 First, DOE's plans to implement a program to 11 provide for the safe and secure storage of weapons-usable 12 fissile materials, that is, plutonium and highly enriched 13 uranium. 14 Second, DOE's strategy for the disposition of 15 surplus weapons-usable plutonium. 16 In December 1996 DOE issued its final programmatic 17 environmental impact statement on the storage and 18 disposition of weapons-usable fissile materials. The 19 Secretary of Energy announced the record of decision on this 20 matter on January 14th of this year. Shortly after the 21 Secretary's announcement the DOE briefed, on January 17, 22 1997, the Commission on its plans. 23 More recently, in July of this year DOE issued a 24 program acquisition strategy for selecting private sector 25 organizations to assist in implementing the MOX fuel ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 4 1 alternative for disposing of surplus weapons grade 2 plutonium. 3 The Commission is extremely interested in the 4 plans and strategies being considered by the Department of 5 Energy on this topic because the program could affect 6 facilities that the NRC has licensing authority over such as 7 commercial power reactors, the geologic high level 8 radioactive waste repository, and possibly others. 9 Unless my fellow members of the Commission have 10 any comments they would like to make, Mr. Canter, please 11 proceed. 12 MR. CANTER: Thank you very much, Madam Chairman 13 and other members of the Commission. 14 With me today is Mr. Dave Nulton, on my right, who 15 is responsible for the reactor option and our work under the 16 National Environmental Policy Act in doing a supplemental 17 EIS for the siting of the facilities that will be required 18 for plutonium disposition. Dave also has the highly 19 enriched uranium program, which I'm not going to discuss in 20 any detail here today, but if you have questions, we can 21 cover them. 22 On my left is Mr. Andre Cygelman, who has the 23 immobilization, the pit conversion, and some of the material 24 issues that our office is involved with. 25 I want to concentrate today on the plutonium ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 5 1 disposition, to go into this procurement strategy for the 2 private sector involvement, talk a little bit about some 3 legislative authority that may be required, and then talk 4 about what is going on with the Russian side of this, 5 because what we finally do in the long run is going to 6 depend on where we end up with an agreement with Russia. 7 Go ahead with the fist viewgraph. 8 This chart just gives some of the background, I 9 think most of which your members know already. 10 The commitment to eliminate the surplus fissile 11 materials. 12 The second item is the Defense Authorization Act 13 for fiscal year 1995 which established a permanent office in 14 the Department of Energy reporting to the under secretary. 15 We have an under secretary nominee now and hopefully he will 16 be confirmed. Then we will have our management structure 17 lined up again. 18 There is a joint U.S./Russian effort that came 19 from several summit agreements. The earliest one was a 20 President Clinton/President Yeltsin statement in January 21 1994 which kicked off a joint effort on this by their 22 "experts." 23 In March 1995 the President declared in excess of 24 200 metric tons of materials surplus to defense needs and 25 stated it would never again be used in nuclear weapons. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 6 1 Next viewgraph. 2 I'm going to concentrate on the disposition work 3 with the Russians. Right now the storage is a minor part of 4 the effort. If you do have questions about it, we can 5 answer them. 6 Next viewgraph. 7 The decision that was announced in January is to 8 pursue what we call a hybrid strategy. It has two parts to 9 it. There are basic reasons for pursing this. As 10 indicated, insurance against delay on any one. 11 There was no consensus on either approach. 12 The third bullet is a significant Russian concern 13 that if we immobilize all the plutonium that that 14 immobilized form is nothing but a storage form, and although 15 that is a satisfactory method to prevent third parties or 16 sub-national terrorists from obtaining it, it's not an 17 acceptable method to prevent irreversibility of the 18 disarmament process, in the Russian view. 19 CHAIRMAN JACKSON: Commissioner. 20 COMMISSIONER McGAFFIGAN: I find that argument 21 from the Russians, which I know is at the core of our policy 22 or our reaction to their policy, sort of the pot calling the 23 kettle black in the sense that every time I hear the 24 Russians talk about their nuclear future, they talk about 25 having breeders, having large numbers of reprocessing ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 7 1 facilities, having vast quantities of plutonium floating 2 around. So if there is any military concern about breakout 3 potential, it would strike me that the Russian breakout 4 potential would be far larger than any potential of us going 5 into Yucca Mountain and hauling out waste to be re-separated 6 and remade into weapons. 7 When you talk with the Russians about this stuff, 8 do we challenge that notion that our breakout potential 9 would somehow be larger than theirs? 10 MR. CANTER: Yes, we do, Commissioner. Some of 11 the things we can't quite say in public yet because they are 12 still classified. The facts are that their position -- we 13 don't necessarily agree with it; it's a negotiable issue -- 14 is that if we were going to break out, we would break out 15 with the designed weapons that we presently have and that 16 are proven by tests. So we would want to go back for the 17 same kind of plutonium that we used in manufacturing them 18 originally, and that would be the weapons grade plutonium. 19 That reactor grade or fuel grade or some other isotopic 20 mixture would require redesigning some of the weapons, 21 particularly the long range devices where weight is very 22 significant, and since we can't test, we might be wanting to 23 do that. 24 Of course each nation will probably keep a 25 strategic reserve of material anyway. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 8 1 This is a disarmament agreement, and we will have 2 to eventually stop talking about how much we are going to 3 get rid of and talk about how much are we keeping, because 4 that's the ultimate bottom line. 5 We are getting a lot of pressure from the Russians 6 on this issue. So it was one of the thoughts that we used. 7 We thought this would help us leverage the Russians towards 8 an agreement if we did at least some of the better quality 9 material with reactor fuel and at least degraded the 10 isotopic and destroyed some of the plutonium in the process. 11 CHAIRMAN JACKSON: That's really an important 12 point, namely that this point three is referenced to 13 material of a certain grade that obviously is linked to 14 strategic weapons of a certain design, and that's why the 15 focus is here. 16 MR. CANTER: Yes. 17 Next viewgraph. 18 This is just a pictorial of the two approaches. 19 As you can see, the first activities on both of them. 20 Early activities are site selection on the reactor 21 option. There is also the competitive procurement that we 22 are going to talk about, and there is mixed oxide fuel 23 development that has already been started and will continue 24 through the next fiscal year. 25 On immobilization, in addition to site selection ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 9 1 there is a lot of R&D on glass versus ceramic that has been 2 underway, and then there is research and development on the 3 process technology and the final form of the immobilization 4 which will be ongoing next year. 5 CHAIRMAN JACKSON: Let me ask you a couple of 6 questions on this particular slide. First, I guess I am 7 interested in having you expand a bit on the near term 1998 8 schedule vis-a-vis competitive procurement. Somewhat linked 9 to that, have you obtained congressional feedback that 10 indicates a willingness to commit the necessary resources to 11 this initiative, to the long term? 12 MR. CANTER: The procurement schedule will be 13 covered by Dave Nulton later. 14 With regard to the Congress, number one, the best 15 feedback is approval of a budget. Right now they are about 16 to go into conference committee, but the House has approved 17 our requested budget. The Senate reduced it by $8 million 18 out of about $103 million. They asked for more information. 19 We have provided it. We are hoping to get that restored. 20 In addition, in the Senate Armed Services 21 Committee report there is some language -- unfortunately I 22 didn't bring it with me today -- where they endorse this 23 dual track strategy and requested that the Department 24 proceed with it. So there seems to be fairly good support 25 on the Hill at the present time. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 10 1 CHAIRMAN JACKSON: Commissioner McGaffigan. 2 COMMISSIONER McGAFFIGAN: I don't think you are 3 going to come back to immobilization very much, as you said 4 earlier. On immobilization, we are going to have a separate 5 briefing later this week on external regulation of DOE, and 6 one of the areas where we have already been working some is 7 the tank waste remediation effort up at Hanford. Is the 8 notion that the facility that you will use for 9 immobilization may also be NRC licensed? 10 MR. CANTER: Yes. If it's the new facilities, our 11 assumption is we will design them to NRC regulations. Right 12 now the planning is based on the fact that what will be NRC 13 licensed would be the MOX plant, and the other facilities, 14 like the immobilization and the pit conversion, are still 15 DOE regulated and Defense Board reviewed. If the external 16 regulation comes about, we'll shift over to it. 17 My position has been that if we are going to do 18 that, rather than back into something later, the time to do 19 that is in the design phase as early as possible. 20 COMMISSIONER McGAFFIGAN: My recollection, and we 21 have come a long ways from it, of the Grumbly-Berube Task 22 Force of last December was that while there was this 23 ten-year time horizon for the defense facilities, there was 24 the notion that new facilities -- I know there is some 25 chance for immobilization you may use an older facilities -- ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 11 1 but new facilities would probably come under NRC regulation 2 earlier if Congress creates a whole host of ifs. 3 MR. CANTER: Yes. 4 COMMISSIONER McGAFFIGAN: Thank you. 5 MR. CANTER: The third piece that we are trying to 6 site is the pit conversion, and that is the next chart. We 7 are into site selection on that. We are installing a 8 prototype system at Los Alamos as we speak, and we expect to 9 start that up next year and to start testing that. There 10 are many different types of pits, so there will have to be 11 modifications to handle different kinds. 12 CHAIRMAN JACKSON: Los Alamos is the site for the 13 prototype but not necessarily the whole site? 14 MR. CANTER: That's correct, but it's full size 15 equipment. What would occur in the production facility 16 would be multiple lines of equipment. 17 COMMISSIONER McGAFFIGAN: Last time you were here 18 the gallium issue had just been in the New York Times and we 19 talked some about it. This is the point at which the 20 gallium, as I understand it, would be removed before it went 21 to the MOX facility. At least that's my recollection of 22 last time. Is that built in now to the planning for this 23 facility? 24 MR. CANTER: It's not necessarily the point for 25 removal of the gallium. The hydride/dehydride process, ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 12 1 which is a dry thermal process, does not purify the 2 plutonium. So whatever is alloyed with the plutonium will 3 come with it. 4 We have a choice if we have to remove the gallium 5 of whether it's removed by adding a module to the back end 6 of this conversion facility or in the front end of the MOX 7 plant if it's going into MOX. 8 We have a program to solve the gallium issue, and 9 we have both out-of-pile and in-pile tests. The out-of-pile 10 tests are already underway; the in-pile testing will be done 11 with fuel fabricated at Los Alamos and inserted into the 12 advanced test reactor in Idaho late this fall or probably 13 early winter. 14 So far the evidence from the out-of-pile tests, 15 which are done in a very conservative manner by using pure 16 gallium in tubes of clad material, show no general corrosion 17 of the cladding material but some evidence of the 18 possibility of some liquid metal embrittlement of the 19 material. But this is pure gallium. When you go through 20 the thermal treatment that has been developed, and then by 21 the time you mix it with uranium oxide in the mixed oxide 22 fuel, you are down to like 10 ppm gallium. That's why the 23 in-pile testing will be very important to determine what 24 happens. 25 If we can't demonstrate that the gallium will not ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 13 1 be a problem, it will have to be removed, because we don't 2 want to go with a licensing risk on this. 3 CHAIRMAN JACKSON: International inspection and 4 safeguards would come in at the point of oxide formation? 5 MR. CANTER: Yes. Once the military 6 characteristics are destroyed so we are not giving away any 7 nuclear weapons design information, from that point forward 8 there will be IAEA safeguards applied. 9 COMMISSIONER McGAFFIGAN: Again a question that 10 may be appropriate at this point. Los Alamos had to shut 11 down its CMR building for the next six months for safety 12 reasons. How is that impacting your program? 13 MR. CANTER: Right now it doesn't impact because 14 we are still installing the equipment for this. Once we go 15 to start this system up we will need the support of the 16 chemistry laboratory, and we are trying to work out a 17 mechanism to minimize any impact from that, if there is any 18 at all. But right now it's construction work. All the 19 equipment is cold and being installed. 20 Next viewgraph, please. 21 This chart is a tabulation of some of the mixed 22 oxide fuel research and development. We are somewhat 23 hampered by the fact that we don't know which kind of 24 reactors are going to be used, and until we do this 25 competitive procurement and the specific utilities and their ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 14 1 reactors are selected, we don't know whether it's a 2 Westinghouse, a General Electric, B&W, or what that we are 3 involved with. So we have to do most of what we are doing 4 in a generic sense or essentially do all different kinds, 5 which is very expensive and makes it very elaborate. We 6 have got some work underway. 7 We have done work on fabricability of the fuel 8 pellets with weapons-grade plutonium, and we have tested the 9 ability to make satisfactory fuel and sinter it properly and 10 grind it using the oxide produced by the dry process. It's 11 satisfactory. There are some people who say it must be 12 aqueous-derived oxide. We don't believe that's true at all. 13 The impact of gallium I've mentioned. 14 The CANDU MOX fuel testing. We fabricated some 15 CANDU fuel at Los Alamos. We are still struggling to try to 16 get a contract in place for the Russians to fabricate some. 17 That will cover a small-scale test that will be done at the 18 NRU reactor at Chalk River on use of the CANDU reactor. 19 It's called the parallax test. 20 We are doing an environmental assessment on 21 shipping this CANDU MOX fuel -- the original shipment is 22 like 5 kilograms of fuel -- up to Canada. That's in the 23 review cycle right now. Once that is completed, if there is 24 a finding of no significant impact, Los Alamos will apply 25 for the export permit for that, which was something that was ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 15 1 applied for and then pulled back last year. 2 We are doing work on spent MOX fuel 3 characterization. In fact all the forms that we end up with 4 are being analyzed -- we have been doing this for about two 5 years now -- by the people responsible for the repository. 6 Rather than have somebody else do it and have them struggle 7 with do they agree with the results, we are having them do 8 it. 9 That has provided some positive feedback. For 10 example, on our early immobilization forms we had as much as 11 ten percent plutonium in an immobilized form. They found 12 out it was going to create a criticality problem and we had 13 to reduce the quantity of plutonium in the immobilized form. 14 The reactor analyses and some work that has been 15 done on that, and safety analysis, to try to determine to 16 what extent we can go to higher levels of MOX fuel than the 17 traditional European approach, which is about 30 percent MOX 18 fuel assemblies. 19 We have under design a fresh fuel shipping 20 container. I think there are two containers in the United 21 States for MOX fuel, but they are extremely large, 22 cumbersome things. Since we decided we will ship the fresh 23 MOX fuel in our SSTs, they don't take advantage of the 24 protection provided by the SST. So we are designing and 25 plan to get certified a new type of container which will be ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 16 1 smaller and lighter and cheaper, obviously. 2 We are doing a lot of work on the economics and 3 cost analysis of all of this. 4 CHAIRMAN JACKSON: Before you go, looking back at 5 reactor core assessment, as I recall, in conventional light 6 water reactors using uranium oxide fuel that at the end of 7 cycle something like 70 percent of the fissions actually 8 come from plutonium-239 produced in the cycle. Do you have 9 some idea of what the percentages would be at a comparable 10 point for the MOX? Presumably it's higher. 11 There is a related question. I am coming to 12 something here in a second. The plutonium-239 provides a 13 more negative moderator temperature and coefficient and a 14 void coefficient to reactivity, which turns out to be 15 advantageous for PWRs at the beginning of cycle, less so at 16 the end of cycle, but I'm told that for BWRs the thermal 17 hydraulics and potential issues of stability, et cetera, are 18 more complex. Does this bias things in any way in terms of 19 reactor selection and the like, or is it too soon to say? 20 Whatever you are able and willing to say in this 21 room, I would appreciate it. 22 MR. CANTER: I don't personally have all the 23 information on that. We could get back to you with the 24 answer on that. 25 The interesting thing is that if you are starting ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 17 1 out with, say, four percent plutonium, which is 2 predominately 239 for the weapons grade -- it's 93 percent 3 more 239 -- and you've got depleted uranium, which may be 4 2/10 of one percent U-235, just about all your energy is 5 going to be produced by fissioning plutonium, either the 6 initial plutonium or the bred plutonium that you are going 7 to get from the 238. 8 CHAIRMAN JACKSON: I guess the ultimate place I'm 9 going is not necessarily to have a technical discussion but 10 in terms of what light water reactor mix or what's biased. 11 MR. CANTER: We haven't biased anything against 12 the boiling water reactors at all. In fact there are some 13 attractions to the boiling water. 14 COMMISSIONER DIAZ: From my old physics, if I can 15 remember it, the plutonium-240 will be larger and it will 16 actually make up for whatever difference it is. There is 17 going to be a small difference in the delay mutual fraction, 18 but that actually will not change as a function of core 19 life. It will be different at the beginning. The 240, 20 which will make more 240 than normal, would actually make up 21 for the differences in the coefficient. 22 CHAIRMAN JACKSON: So it doesn't bias things one 23 way or the other for one type of reactor. 24 COMMISSIONER DIAZ: No. 25 CHAIRMAN JACKSON: Commissioner. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 18 1 COMMISSIONER McGAFFIGAN: This may be actually 2 related. The last tick here is the economics and cost. As 3 I understand it, MOX fuel you can't have as long a cycle as 4 with uranium oxide fuels. That has been the practice in 5 Europe. Your burnups can't be as high. Presumably the 6 people who bid on the contract, if you are forcing them to 7 be down more often, will expect you all to make up for that 8 in some way. In your economic analyses have you factored in 9 that, and do you have any better cost estimates now as to 10 what the MOX option is going to cost? 11 MR. CANTER: We are going to need some information 12 from the procurement process to really refine these cost 13 estimates. We don't necessarily agree that you can't have 14 as long a cycle. 15 As a matter of fact, the French are now seriously 16 making preparations to go to an 18-month refueling cycle 17 similar to what is used for LWRs in the United States, and 18 they are talking about much higher burnups. It's an 19 experience factor. 20 So the burnups initially were in the 30,000, 21 33,000 megawatt days per ton range and going up into the 22 40s. It's going to be a question of what's doable within 23 the realm of the envelope of experience at the time. 24 CHAIRMAN JACKSON: So you're talking about going 25 into the 40s in terms of gigawatt days per ton for MOX as ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 19 1 opposed to uranium-based? 2 MR. CANTER: Yes. 3 COMMISSIONER McGAFFIGAN: I suspect the 4 procurement process will give you data. If I were bidding, 5 I probably would bid within the current envelope of 6 experience rather than presuming things. 7 MR. CANTER: For immobilization we have an 8 extensive research and development program. One is the 9 impact of impurities. All of the work prior to our record 10 of decision was done with pure plutonium oxide. The 11 assumption is that immobilization can accept what I'll call 12 the junk and stuff without extensive purification, but we 13 have to prove this out. So we are doing a lot of samples 14 and we have three or four of the labs working on this plus 15 Savannah River. 16 We are doing layouts of the process and to develop 17 the key process parameters and sizing of equipment. 18 We have decided to go with the can and canister 19 concept where the plutonium would be immobilized without a 20 radiation barrier in cans that are about the size of a two 21 liter bottle of Coke. Those cans will be suspended in a 22 framework in the large canisters that are used for high 23 level waste glass similar to those that are at Savannah 24 River now. Then high level waste glass will be poured 25 around those cans and fill the canister to create the ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 20 1 radiation barrier. 2 COMMISSIONER DIAZ: Where is the high level waste 3 going to come from? 4 MR. CANTER: It's either going to be at Savannah 5 River or Hanford. I think they've got a lot. 6 COMMISSIONER DIAZ: In liquid form. 7 MR. CANTER: Yes. At one point people felt that 8 we didn't have enough high level waste despite this, and I 9 said, my God, I hope we don't have to go out and create more 10 high level waste for this purpose. But it's adequate. 11 Our preferred sited, by the way, for 12 immobilization is Savannah River. We have already formally 13 announced that in the notice of intent on the EIS, because 14 they have a high level waste vitrification plant in 15 operation. 16 We do not want to alter that plant. It was never 17 designed for criticality control. So you'd have to go with 18 a much smaller melter, much smaller systems, and so forth, 19 which would change the throughput and significantly increase 20 the cost of the high level waste program. 21 CHAIRMAN JACKSON: And that's why you picked the 22 can and canister? 23 MR. CANTER: That's why we picked the can and 24 canister. We can take advantage of that facility without 25 affecting its operation, essentially. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 21 1 Andre mentions that we don't have any technical 2 experience in adding plutonium to the high level waste 3 glass. So that would be a tremendous technical risk. 4 We have gone through and we are completing this 5 month a formal evaluation of the relative merits of glass 6 and ceramic in the smaller cans. We haven't finally 7 approved the results of that, but we will be doing that 8 probably in the next two weeks. 9 CHAIRMAN JACKSON: The Savannah River facility can 10 handle the throughput that you expect? 11 MR. CANTER: Yes. 12 CHAIRMAN JACKSON: So in fact then you don't 13 expect to have a new immobilization facility? 14 MR. CANTER: There will be new facilities for 15 immobilizing the plutonium, making the cans, and any 16 preprocessing of the plutonium materials. 17 To give you an idea, the Savannah River facility, 18 the estimate is that they will produce about 6,000 canisters 19 of high level waste glass based on the high level waste at 20 Savannah River. Adding the plutonium to some of those would 21 probably impact maybe 500 to 1,000 of those canisters. 22 CHAIRMAN JACKSON: Commissioner. 23 COMMISSIONER DIAZ: Something occurred to me. 24 Looking at the options of immobilization versus the MOX 25 fuel, obviously we are still standing by our 20-year-old ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 22 1 policy of no reprocessing of fuel. I think in the MOX case 2 we can say that we are processing the plutonium into a new 3 fuel form actually without reprocessing the fuel. However, 4 in the immobilization we are taking high level waste and 5 mixing it in a form that will actually provide the radiation 6 barrier to make it less attractive. 7 Is anybody giving you any problem whether 8 immobilization is closer to reprocessing than the actual 9 fabrication of the MOX? 10 MR. CANTER: The only issues that have been raised 11 about that, Commissioner are, if we were to use the actual 12 canyon facilities at Savannah River, are we promoting use of 13 a reprocessing facility to do this, to mix materials, or so 14 forth? We are not planning to do that. It's not a good 15 argument anyway even with that. 16 I was so disturbed about what is the policy and 17 what has it been that I went back and found the original 18 October 28, 1976, policy statement signed by President Ford, 19 and it was the chemical separation from spent fuel. That 20 was the issue. There has been a lot of confusion on that. 21 CHAIRMAN JACKSON: You mention on this slide that 22 you completed a formal evaluation of the relative merits of 23 glass and ceramic forms. How has that come out? 24 MR. CYGELMAN: Actually we had tasked Lawrence 25 Livermore, who is our lead lab in this area, to give us a ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 23 1 recommendation with regard to continuing with one form. 2 They set up a process whereby they had two evaluation panels 3 evaluate the technical information that was presented. DOE 4 provided criteria which the panel and the lab could use to 5 evaluate the merits of each of the forms, and Lawrence 6 Livermore gave us a recommendation, indicating that ceramic 7 had certain advantages relative to glass, and their 8 recommendation was to select ceramic. 9 As Mr. Canter has indicated, we still are 10 assessing that recommendation and we haven't made that 11 decision yet. 12 CHAIRMAN JACKSON: If you are talking 13 vitrification, that means glass. 14 MR. CYGELMAN: Yes, it would mean glass. 15 MR. CANTER: If we were to use glass in these 16 cans, it would not be the same glass that is used with the 17 high level waste; it's a higher temperature glass. So it 18 doesn't remelt and the plutonium separate out when you are 19 pouring the large quantity high level waste glass around 20 those cans. There has been a lot of testing of a much 21 higher temperature glass for that. 22 CHAIRMAN JACKSON: Commissioner McGaffigan. 23 COMMISSIONER McGAFFIGAN: The defense waste 24 processing facility at Savannah River had some startup 25 problems. My recollection from reading the energy dailies ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 24 1 and other reliable sources lately is that those are behind 2 it and that it's meeting its goals for producing logs at 3 this point. 4 MR. CANTER: To my understanding, yes, sir. 5 COMMISSIONER DIAZ: Just to finish with the issue 6 of the high level waste, we assume that when you take the 7 high level waste stream from Savannah River or Hanford there 8 are no contaminants or chemicals that will need to be 9 separated. I'm sure you will make sure that this is going 10 to happen. 11 MR. CANTER: That is one of the reasons for this 12 can and canister concept. There is a barrier between the 13 immobilized plutonium, a metal can, and the high level waste 14 glass. So whatever process they are doing on preparation of 15 the feed stream for the high level waste glass will be 16 unchanged. 17 COMMISSIONER DIAZ: I was concerned about chemical 18 contaminants that might actually attack the integrity of the 19 canister from the high level waste. 20 MR. CANTER: If they have that problem, they have 21 that problem today with the canisters, and we wouldn't be 22 changing that. 23 The pit disassembly and conversion is the next 24 chart. I mentioned the prototype that we expect to start 25 demonstrating in March of next year at Los Alamos. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 25 1 The initial run is about 40 weapons components. 2 There are seven pit types that will be run through there. 3 Then we will have to start adding some different equipment 4 to do other types. We will probably add some automation and 5 some additional remote handling because some have radiation 6 levels that would give us a problem if we didn't. We expect 7 to test over a two-year period about 200 more. 8 CHAIRMAN JACKSON: Do you see any external 9 regulatory role in the pit disassembly and conversion 10 program? We have already talked about immobilization. 11 MR. CANTER: It depends on what the decisions are 12 and how the Congress reacts to this external regulation. I 13 don't know. 14 The siting of the disposition facilities is the 15 next chart. As you can see, for immobilization there are 16 just two sites that are candidates. Savannah River is the 17 preferred alternative site, but we are evaluating Hanford. 18 Although they don't have a high level waste immobilization 19 facility, they have plans for one. Even though some people 20 refer to their first phase as a pilot scale, that pilot 21 scale is so big that it's large enough to do this job if it 22 were to be completed. 23 For the other two modules, the pit conversion and 24 the mixed oxide fuel fabrication, there are four candidate 25 sites. None of those have been designated as a preferred ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 26 1 alternative at this time. 2 Next viewgraph. 3 We are doing an environmental impact statement, 4 and that is tiered off from our programmatic. The notice of 5 intent is already out. We have gone through scoping 6 meetings. 7 We expect the draft environmental impact statement 8 to be issued early next year, probably January or February 9 time frame. It will contain the preferred alternatives. As 10 I said, we already indicated the preferred alternative for 11 immobilization. So we'll have to pick the site for the MOX 12 plant and the pit conversion. 13 As part of our record of decision the MOX plant 14 will be on a DOE site; it will not be out in the commercial 15 sector. It will be owned by DOE although it will be 16 operated by the private sector. 17 The final environmental impact statement and the 18 record of decision, about the end of fiscal '98, early 19 fiscal '99. 20 CHAIRMAN JACKSON: Would you expect NRC to be a 21 commenting or a cooperative agency? 22 MR. CANTER: We have sent you correspondence, and 23 my understanding is that you would be a commenting agency 24 rather than a cooperating agency. 25 CHAIRMAN JACKSON: It's a recommendation the ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 27 1 Commission has to act on. 2 MR. CANTER: Yes. 3 The schedule, which is the next chart, is of 4 interest. I will come back to this later, but it shows 5 tests and qualifications, form selections, the procurement, 6 and then the design. We just show design and licensing for 7 the MOX facility because we don't know whether the others 8 will be licensed. And the construction periods. 9 We are requesting construction money to start the 10 design on the pit disassembly and conversion and the MOX 11 facility starting in fiscal '99. 12 We will not be ready to start on the design of the 13 additional facilities needed for the immobilization because 14 we are still developing the processes. That will start in 15 the year 2000, but the actual construction will be much 16 shorter because they are not very extensive facilities. So 17 it should be ready at least a couple years before the MOX 18 plant would be ready. 19 I'd like to let Dave Nulton describe our 20 procurement strategy and the feedback that we have gotten 21 from industry, because I think this will be of interest. 22 MR. NULTON: Because of the unique nature of our 23 procurement, the Department decided that we would issue a 24 procurement strategy rather than go out directly with a 25 draft RFP or a final RFP, the idea being that we would ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 28 1 indicate what our strategy is, get response from industry. 2 If there were major differences with our proposed approach, 3 then we could make changes and hopefully save some time. 4 The strategy indicated a preference for a 5 consortium as a minimum to be made up of a fuel fabricator 6 and an irradiation service provider, presumably a utility or 7 an IPP. The reason for that was we wanted the fabrication 8 of fuel and the fuel supplied to a utility or IPP to be as 9 close as possible to the normal business arrangements that 10 are in place between those entities right now. We didn't 11 want to put ourselves in the middle of that fuel supply 12 process, having to guarantee schedules and warranties on 13 fuel and so forth. 14 The consortium preference also indicated that we 15 wanted a sole contracting authority, a lead company. 16 Initially an NSSS company or a fuel fabricator. We did get 17 some comments back from that proposed approach from the 18 industry, which I will talk to in a minute. 19 The key assumptions were that the mission 20 timetable for this procurement and for implementing the 21 program would be dictated by international agreements, 22 primarily with Russia. The United States isn't going to 23 begin to eliminate or disposition their plutonium until we 24 see some commitment and progress on the Russian side as 25 well. Howard will say more a little bit later, at the end ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 29 1 of the presentation on progress that we are making with 2 Russia in that regard. 3 The MOX fuel fabrication facility site would be 4 determined through NEPA. As Howard mentioned, there are 5 four sites being considered. They are all DOE sites. 6 The assumption also stipulated that the MOX fuel 7 fabrication facility would be licensed by NRC as opposed to 8 being operated under DOE orders. 9 IAEA safeguards requirements would apply through 10 the disposition process once the materials are converted to 11 a declassified state. We would not have IAEA involvement in 12 the pit disassembly and conversion process because the 13 materials would be classified at that point. 14 We also indicated that NRC jurisdiction for 15 security and safeguards would apply at reactor sites. 16 Actually the original strategy indicated that the more 17 stringent safeguards and security requirements would apply 18 at the MOX site. We got some comments back from industry 19 questioning whether or not that would lead to some 20 conflicts, and as a result we are changing our approach 21 there, or at least proposing that it be changed to having 22 NRC jurisdiction at reactor sites and DOE jurisdiction at 23 the MOX fuel fabrication facility. 24 CHAIRMAN JACKSON: Let me ask you a question about 25 that. Since you are talking of NRC licensing of the MOX ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 30 1 fabrication facility as well as having the IAEA safeguards 2 apply, and we implement those at the civilian facilities 3 here, what is the gain or the rationale for having DOE 4 safeguards and security orders apply at the MOX fuel? 5 MR. CANTER: The MOX fuel fabrication plant would 6 be an enclave inside a larger DOE site. Effectively the 7 security force from the larger site would be the backup for 8 whoever is providing the security in the smaller internal 9 site. It just seemed to us that you don't want two sets of 10 rules. 11 One of the fundamental issues, and I'll come to 12 this later when I talk about legislation, is the question of 13 the use of deadly force. Under an NRC license, I don't 14 think that they get the authority through you to use deadly 15 force to protect the material. They can use deadly force to 16 protect themselves. 17 CHAIRMAN JACKSON: I know he is going to make the 18 comment I was going to make. 19 COMMISSIONER McGAFFIGAN: Part of our legislative 20 proposal is to deal with that. 21 CHAIRMAN JACKSON: It's in fact to change that. 22 MR. CANTER: I know that. Let's say something 23 were located at Savannah River. They've got a 300 square 24 mile site. They've got certain security requirements. If 25 you need help in this smaller enclave, you don't want to ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 31 1 tell people, well, when you go inside that fence you do it 2 this way, but outside of it you do it a different way. You 3 want a common set. We have to resolve this. 4 I don't think it's a big problem. It's just 5 something that has to be done. 6 CHAIRMAN JACKSON: Go ahead. 7 COMMISSIONER McGAFFIGAN: Just to clarify. It was 8 put out differently in the original acquisition strategy, 9 that it would be under NRC. Having your viewgraph is a 10 reaction to the comments you got at the meeting in Chicago. 11 MR. CANTER: Yes. 12 CHAIRMAN JACKSON: Do you envision the lead 13 contractor as the licensee? 14 MR. CANTER: Probably that would be the way it's 15 done, and it depends on their contractual relationship among 16 the members of this consortium. It was interesting. An 17 attorney in procurement started reading off different 18 definitions of the word "consortium," and when he got all 19 done describing Webster's, Black's Law Dictionary and 20 everything else, we knew less than when we started. 21 CHAIRMAN JACKSON: That's what dictionaries will 22 do for you. 23 MR. CANTER: It's whatever arrangement a group of 24 companies can have. What we do insist is that somebody be 25 in the lead and be responsible. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 32 1 CHAIRMAN JACKSON: What about foreign ownership 2 control and influence? 3 MR. NULTON: The rules for foreign ownership would 4 apply. There will be foreign entities involved in this, we 5 believe. The Western European fuel fabricators obviously 6 have this background and expertise, and we would expect to 7 see them in some of these consortia. The Buy American Act 8 would also apply. 9 CHAIRMAN JACKSON: But you'd expect the lead to be 10 a U.S. company. 11 MR. NULTON: A U.S. company or one that could 12 qualify as a U.S. company, yes. 13 CHAIRMAN JACKSON: Okay. 14 MR. NULTON: Next viewgraph. 15 The responsibilities of the consortium would be to 16 design, construct, license and operate the fuel fabrication 17 facility. 18 Then to irradiate the MOX fuel in existing 19 commercial reactors. 20 And to decontaminate and decommission the MOX fuel 21 facility at the end of the campaign. 22 CHAIRMAN JACKSON: Yes. 23 COMMISSIONER McGAFFIGAN: Did industry have any 24 comments at this meeting about decontaminating and 25 decommissioning? ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 33 1 You earlier talked about this enclave in a DOE 2 site, and all the DOE candidate sites are not exactly 3 pristine. If I were the entity, I would want to make sure 4 that I had a survey of the site so I did not get blamed for 5 past DOE sins. How is that decommissioning and 6 decontamination baseline going to be set? 7 Presumably if it's our license, it would be to our 8 license termination standard. 9 Was there any comment on that in your Chicago 10 meeting? 11 MR. NULTON: Not a lot of comment on that. The 12 facilities will either be new facilities in greenfields, or 13 they will be used in conjunction with new or existing 14 facilities. At Hanford the FMEF has never been used. So 15 it's a clean facility. At Savannah River we have the APSF. 16 That would sort of be the anchor and these other facilities 17 would be built contiguous to the APSF. 18 I don't think we have any preexisting 19 contamination at those sites, but we did not get a great 20 deal of comment on this. 21 COMMISSIONER McGAFFIGAN: Would they be allowed to 22 survey the site to provide a baseline? 23 MR. NULTON: Absolutely. 24 CHAIRMAN JACKSON: Okay. 25 MR. NULTON: The Department of Energy's ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 34 1 responsibilities would be to provide the site through our 2 NEPA process, to provide funding for the design and 3 construction of the facility, but we would retain ownership, 4 as Howard had mentioned earlier. 5 We would provide materials to meet the operator's 6 schedule, and we would also provide those to meet a spec for 7 powder going into the MOX fuel process. 8 We would transport the materials to the 9 fabrication facility from the disassembly and conversion 10 facility. They could be collocated, but they may not 11 necessarily be collocated. That's something to be 12 determined through our NEPA process. 13 Then we would also provide for IAEA inspections. 14 MR. CANTER: Let me interrupt a minute. This 15 shows the transportation to the MOX facility. I also said 16 we would transport the fresh fuel to the reactors. 17 MR. NULTON: Next viewgraph. 18 CHAIRMAN JACKSON: I think the Commissioner has a 19 question. 20 COMMISSIONER DIAZ: I just was wondering whether 21 you have a similar well defined chart of the NRC 22 responsibilities that you see as a companion to this chart. 23 MR. NULTON: We do not. I think that will be the 24 subject of further discussion. 25 COMMISSIONER DIAZ: Not even a tentative? ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 35 1 MR. NULTON: Not even a tentative at this point. 2 CHAIRMAN JACKSON: They knew we would give them a 3 hard time. 4 MR. NULTON: The procurement schedule actually 5 began back in March with a Commerce Business Daily 6 announcement that indicated that the Department was about to 7 undertake this procurement, that we would initiate the 8 procurement by issuing a procurement strategy. That 9 strategy was issued on July 17, 1997. 10 We provided time for review and asked that 11 comments be provided to the Department. Actually this 12 procurement is being conducted out of the Chicago operations 13 office. So we are working jointly with the Chicago office 14 on this. 15 There was a workshop held with industry and other 16 members of the public on August 28 to receive further 17 comments and have discussion on the strategy, which I will 18 say more about in a moment. 19 The draft request for proposals will be issued in 20 November, probably late November at this point. Our target 21 is to have that out before Thanksgiving. This will be the 22 last opportunity for industry and others to comment on our 23 procurement process. 24 And then we would have final request for proposals 25 out in February with receipt of proposals sometime around ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 36 1 the May time frame. 2 Contract award we show here as September of 1998, 3 but another comment that we received from industry, and I'll 4 say more in a moment about this as well, was that they were 5 concerned about the commitment of the Department to the 6 procurement; they were concerned about how much material 7 would go to immobilization versus mixed oxide fuel; and some 8 concern about why so much time was allowed between the 9 receipt of proposals and the award of a contract. 10 So we are looking at trying to accelerate this 11 schedule. We might be able to contract as early as July, 12 but that is something that we are still working internal to 13 DOE. 14 Next viewgraph, please. 15 As I mentioned, the workshop was held in Chicago, 16 at the Chicago operations office site on August 28. It was 17 well attended. We had over 100 attendees. I think we had 18 87 or so that formally registered and there were others who 19 came in at the last moment who did not register. So we 20 think roughly 100 people. 21 We had comments that had been provided prior to 22 the meeting. We took these and issued at that meeting a 23 draft set of answers to those comments, and then we also had 24 further discussion and tried to address other issues that 25 were raised at the meeting as we received them. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 37 1 What we tried to do here is identify some of the 2 major concerns. As I mentioned earlier, concern over DOE's 3 commitment to the MOX/reactor procurement. This, I think, 4 stems from a number of factors. 5 First, the wording in the record of decision from 6 the programmatic environmental impact statement was in some 7 cases vague, maybe even confusing in terms of how much 8 material would be committed to the immobilization approach 9 versus the mixed oxide approach. 10 Also DOE's track record in the past of completing 11 facilities on time and getting them up and running. 12 So there is some concern in industry. We hope 13 that accelerating the procurement, if we can do that, will 14 help to alleviate some of those concerns. 15 There was also a comment made by a number of 16 industry groups on the leadership requirements. Initially 17 we had said that we would like to have a fuel fabricator, an 18 NSSS vendor provide the leadership of that consortium. We 19 are now changing that approach to say that any members of 20 the consortium can be the lead as long as they meet the U.S. 21 ownership requirements, and also they must have the 22 financial and technical resources to be the lead, and then 23 we would contract with that lead. 24 In fact, we even allow, and I think we had this in 25 the original strategy document, for some of these ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 38 1 arrangements to be done through subcontracts. Not every 2 participant in this endeavor needs to be a member of the 3 consortium; they could subcontract to some of those 4 contractors. 5 There was a comment about the cost of preparing 6 the proposal and whether there would be cost reimbursement. 7 At this point we are making no change in our position there. 8 We would expect the consortia to fund the preparation of 9 their proposals. 10 There was a concern for duplicative DOE and NRC 11 regulation. This was primarily focused on the safeguards 12 and security requirements that we talked about earlier. 13 Again we had said that we would apply the most stringent 14 requirements. Now we are proposing that DOE requirements, 15 for the reasons that Howard described, would apply at the 16 MOX site and NRC requirements at the reactor site. This is 17 something that may require some legislation to get nailed 18 down. 19 CHAIRMAN JACKSON: Were there any other public 20 comments that addressed NRC or its role in this project? 21 MR. CANTER: We were asked whether we had 22 legislation giving NRC the authority. We said that's yet to 23 come. Some questions about that. Most people felt in view 24 of the fact that part of this process, the reactors, are 25 already NRC licensed that this was the right thing to do. I ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 39 1 didn't hear any real objections to it. 2 MR. NULTON: Next viewgraph, please. 3 One of the requirements that we identified in our 4 strategy was to provide excess capacity in the event that 5 more material is declared surplus or we want to increase the 6 throughput. 7 Also there is an option that we are evaluating in 8 our NEPA process to disposition some of this material in 9 Canadian CANDU reactors. As a result, we wanted to be sure 10 that we had adequate space in the facility to fabricate any 11 type of fuel that would be required or to increase our 12 throughput. 13 There was some objection to this. At this point 14 we have not changed that requirement. Again the Department 15 is going to pay the cost of designing and constructing this 16 facility, and our view is the additional cost will be funded 17 by the U.S. Government. So we're not sure why that is a 18 major concern, but we are looking at that further. 19 There was some uncertainty about how the MOX fuel 20 fabrication facility would relate to other activities at the 21 DOE site where the facility might be constructed. This was 22 focused primarily on services, water, electricity, and so 23 forth, whether they would be purchased or provided by DOE. 24 Also the potential for conflicting missions at that site. 25 We don't think this is a major problem, but we will address ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 40 1 it further in our draft RFP. 2 Finally, there was not so much comment but more 3 inquiry or question on details of criteria that would be 4 used in our evaluation, what would the weighting of that 5 criteria be. 6 Also a question on the safety records of some 7 reactors. If a reactor is in the watch list, will it be 8 considered? Our view there is a reactor that is on the 9 watch list today may not be in ten years when this activity 10 gets up and running and vice versa. 11 CHAIRMAN JACKSON: Also, presumably if in fact 12 it's in our regulatory regime, that would be part of what we 13 would make a decision on at any rate. 14 MR. NULTON: Absolutely. In fact we have received 15 correspondence on this in the past prior to the strategy 16 going. That's typically the answer that we give, that this 17 is an NRC regulatory issue. 18 Next viewgraph, please. 19 As Howard mentioned, we believe some legislation 20 will be needed to implement the program. In fact there have 21 been some preliminary discussions between our general 22 counsel's office and your attorneys on how we go about doing 23 this. First, of course, would be the authority for NRC to 24 license a DOE-owned facility. 25 Price Anderson indemnification. There was some ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 41 1 question on this at our meeting in Chicago and also some of 2 the comments that came in as part of the meeting. We need 3 to be clear on who is going to indemnify the operators of 4 this facility. I believe the proposal now would be that the 5 MOX facility would be covered through DOE; the reactors, of 6 course, through NRC. The question came up again because of 7 NRC licensing a facility on a DOE site. 8 The use of deadly force, which we discussed 9 earlier, may require legislation, although your proposed 10 legislation may deal with that and no further changes will 11 be required. 12 Then changes in security approach, having to deal 13 with the safeguards and security at the MOX facility and how 14 we handle that. 15 CHAIRMAN JACKSON: Yes. 16 COMMISSIONER McGAFFIGAN: Do you have a backup 17 plan in case Congress doesn't decide to do this? In the 18 case of tritium it has been controversial this year whether 19 Congress would grant the DOE legislative request, and I 20 guess we are waiting for the conference result on that. 21 If Congress says no, we want the MOX facility 22 self-regulated by DOE, you then have the interface at the 23 reactors, which are obviously going to continue to be 24 regulated by us. Have you thought through how that 25 regulatory regime would work and how your self-regulation at ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 42 1 the MOX facility producing fuel that you irradiated and our 2 regulated reactors, how that would all work out? 3 MR. CANTER: I think that is pretty 4 straightforward, Commissioner. The DOE regulation would be 5 the safety aspects of the MOX fuel fabrication facility. 6 The quality requirements for the product produced in there 7 would come from its contract with the utility and would have 8 to meet NRC requirements, but DOE wouldn't be responsible to 9 try to control the quality. That would be a contractual 10 arrangement with the purchaser or whatever arrangement there 11 is for that fuel, and the customer is the utility who has 12 requirements under its license with you. But the safety, I 13 think it's very easy, and the handoff would be on delivery 14 at the reactor site. 15 The Price Anderson is rather interesting. My 16 understanding is that if they get Price Anderson via a 17 license they have to pay an insurance premium for it, if I'm 18 correct. I don't know that I'm correct. This wouldn't make 19 sense if they had to pay that and then turn around and bill 20 us for the cost. Through the contract we can furnish the 21 Price Anderson, and we don't charge for it. We furnish it 22 to all our contractors. This would be just circulating 23 money for no purpose. 24 I want to cover a little bit on the Russian 25 activities because all of this is hinging on it and some ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 43 1 things have happened recently which are rather exciting. 2 The next viewgraph. 3 We completed a U.S.-Russian study last fall on the 4 technical options. This did not make recommendations on 5 what to do in Russia. It just presented an evaluation which 6 tried to be fair, an evaluation to some mutually agreed upon 7 criteria of the different options. 8 There were some important considerations that came 9 out of that. One was that the Russians in the study agreed 10 and after we printed it tried to back away from it for a 11 little while, but they agreed that whatever is done in 12 Russia and the United States we would reduce to equal 13 levels. That's a subtle difference between that and equal 14 rate. So if they are starting with more than we are 15 starting with, they may have to run faster. 16 The second point that is very interesting is that 17 they agreed that there would be no recycle of whatever form 18 there was, at least until the stockpile of surplus plutonium 19 is eliminated. So that day may be 30 years from now. They 20 wanted the option to go recycle their fuel. We said not 21 while you're getting it down. What happens 30 years from 22 now we'll figure out in the interim. 23 CHAIRMAN JACKSON: Commissioner. 24 COMMISSIONER McGAFFIGAN: One of the tricky points 25 is this reduction to equal levels, including presumably ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 44 1 whatever strategic reserves the two countries decide to 2 retain. It's fairly straightforward to calculate how much 3 plutonium they produced within, say, ten tons. I think I 4 saw a recent press report where Velikhov was quoted as 5 saying they might declare 50 tons excess. How will we react 6 if the number is that low given that we know it has to be 7 much higher or else their strategic reserve is going to be 8 much, much, much higher than ours? 9 You are into arms control, and I don't want to get 10 into classified, but there is a paradox here that is going 11 to be difficult to get passed unless they declare something 12 much larger. 13 MR. CANTER: You are really asking me what is the 14 negotiating strategy for working out a bilateral agreement 15 which I can't lay out and I don't think in a public forum 16 would be a good idea anyway. 17 In prior arms control agreements they did refer -- 18 for example, conventional forces in Europe. They didn't 19 deal with how many tanks are you going to destroy but how 20 many tanks are you going to keep. That's ultimately what we 21 have to get to here. It's going to be tough for the U.S. to 22 accept that, because it will require the U.S. to reveal what 23 it's going to keep, and they don't want to do that; there 24 are people who don't want to do that. 25 We have started conducting some small-scale tests ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 45 1 and demonstrations. We have several activities at the 2 Bochvar Institute on immobilizing plutonium. We have some 3 work at Bochvar and some fuel fabrication, and we have work 4 at IPP, Obninsk and at the Kuchatov Institute on analyzing 5 some of their reactors. Kuchatov was brought in because the 6 most promising option appears to be to start to use mixed 7 oxide fuel in some of the operating VVER-1000 light water 8 reactors. 9 The Russians have seven. They have indicated that 10 four of them are newer and could contribute to this. If you 11 stick with 30 percent MOX fuel, they could each consume 12 about a quarter of a ton of plutonium a year. So that's not 13 very much. But there are happen to be 12 operating 14 VVER-1000s in the Ukraine, and the Russians have agreed and 15 they have already started a dialogue with the Ukraine on 16 possibly using those. So then you are getting a population 17 of reactors that starts to get reasonable for accomplishing 18 the job. 19 One of the problems is that we don't know what the 20 end of life is on these reactors and will they last long 21 enough to really do this. Again you get back to the 22 question of how much do they have to do. 23 All of this is going to have to be worked out. 24 It's going to be somewhat difficult. 25 We have reached agreement with the Russians to ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 46 1 start developing a pilot-scale pit conversion facility for 2 Russia. In the experts meeting in Paris last October the 3 French and Germans proposed building a pilot-scale MOX plant 4 in Russia. That would consume 1.3 metric tons of plutonium 5 a year, produce about 30 tons of heavy metal mixed oxide 6 fuel. 7 They proposed it but then went around and passed 8 the hat and wanted to know who would like to contribute. We 9 took the position that we didn't want to contribute to that 10 but what we would prefer to do is break off the front end of 11 that, and we will handle that in total. That's the 12 conversion of the metal from the weapons components into 13 oxide and the placing of the resultant oxide under IAEA 14 safeguards. If that oxide goes into MOX fuel it has got to 15 be acceptable oxide for that, and we will size this 16 pilot-scale plant accordingly so it's handling 1.3 tons of 17 plutonium a year. 18 We will handle that, and we have already started 19 working on it and we have dedicated some money to it, and we 20 will be requesting money in the coming years for that 21 effort. What is started on that is a feasibility study, an 22 engineering study, and some experimental work at the Russian 23 laboratories on which process to use for converting metal to 24 oxide. At the present time they don't know what they want 25 to use, and it doesn't have to necessarily be the same ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 47 1 process we're using. 2 CHAIRMAN JACKSON: Commissioner. 3 COMMISSIONER McGAFFIGAN: I think I heard the 4 Russian deputy minister at the Leesburg conference talk 5 about their preference to get to the spent fuel standard by 6 putting the fuel in breeders. Does that continue to be 7 their preference? I know our preference is the VVER-1000s, 8 and you've got Kuchatov involved, but is there a disconnect 9 in the Russian bureaucracy on that? 10 MR. CANTER: No. Number one, they still love 11 breeders and we can't break up that love affair. But number 12 two, they have also agreed in the one fast breeder they've 13 got, the BN-600, to convert it to a burner, and there are 14 some early steps that can be taken. For example, the 15 removal of the radial blanket which generates weapons grade 16 plutonium and installing steel reflectors and some other 17 things. That can be done in a relatively short period of 18 time, a few years. So we can take some steps there to 19 eliminate that threat so they are not making more plutonium. 20 Of course, as you know, the Department working 21 with the Department of Defense has a core conversion program 22 for the production reactors also which we don't have aegis 23 over but another part of the Department does. 24 And we are providing technical support for the 25 Interagency Working Group. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 48 1 The next chart I'm not going to go through each of 2 the items. This is nicknamed the Holdren-Velikhov Report. 3 About a year and a half ago or two years ago 4 President Clinton and President Yeltsin sort of commissioned 5 an independent scientific commission consisting of five 6 members from the National Academy of Science and five 7 members from the Russian Academy of Science, and the two 8 sides are chaired by John Holdren from Harvard and Evgeny 9 Velikhov, who is the president of the Kuchatov Institute and 10 also a member of their National Defense Council. Their 11 report came out a few months ago, and it has some key 12 recommendations. 13 First of all, it endorsed the dual track for both 14 nations, and they supported getting these pilot plants built 15 and getting MPC&A, material protection control and 16 accountancy, at the sites, and we have an extensive program 17 for that. The budget for that has steadily gone up through 18 the years, and I think we asked for something in the 19 neighborhood of $130 million for fiscal year 1998. We will 20 see how that comes out. But there are some 40-odd sites 21 where that work is being done. 22 Some of the things are rather interesting for you. 23 Agree to establish appropriate managerial 24 structures. Within that recommendation were several 25 sub-recommendations. The Russians have never assigned ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 49 1 anybody responsibility for this. So when you deal with 2 them, this task is dealt with by this office and somebody 3 else. They recommend, I guess, that they have a mirror 4 image of what we got, which I guess is another office like 5 ours or something, or a program office. And they are 6 starting toward that direction. They just recently assigned 7 a coordinator at our request and are trying to get him up to 8 speed. 9 The other was that they recommended -- we have to 10 think long and hard about this -- that both nations 11 establish offices in their regulatory agencies dedicated to 12 the disposition of excess plutonium. So that would be the 13 NRC and GAN. Obviously we are not responding to that. The 14 White House has this report and they'll probably be in touch 15 with you. I know they're going to request through the 16 Interagency Working Group comments on it at some point. 17 The next chart, please. 18 This is the thing I was mentioning that is rather 19 dramatic as a result of some meetings that we had in May 20 where we met with the Defense Council. In the Russian 21 Government there are two councils. There is a National 22 Security Council and a National Defense Council. 23 The National Security Council is really for 24 internal security but they do handle such minor issues as 25 Chechnya and a few other things. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 50 1 The National Defense Council, akin to our NSC, is 2 chaired by the President himself, and the members consist of 3 some cabinet level ministers and the prime minister. In 4 fact I have a backup viewgraph on that. If you could find 5 that on the National Defense Council. 6 This describes the National Defense Council. Of 7 interest is that the Minister of Atomic Energy is not a 8 member of the National Defense Council - Mikhailov. There 9 is a secretary and chiefs of staff and all that, and the 10 secretary is the analogue to Sandy Berger of the NSC on this 11 side. 12 We met with some members of the National Defense 13 Council staff and explained to them in May that the United 14 States has an interagency process. So we get the policy 15 people involved early and we don't go running off and doing 16 things on our own in the Department of Energy, and we have 17 the State Department and we have the NSC and we have OSTP 18 and others involved, so that at some point you have to 19 translate technical work into policy, and that is being 20 lined up as we go. 21 But we don't see anything similar in Russia. In 22 other words, it's all buried in MINATOM. They went off and 23 prepared a recommendation to the President, and on the 23rd 24 of July President Yeltsin signed a decree that set up this 25 standing committee under the National Defense Council. ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 51 1 This is very important, because they assigned as 2 the chairman Velikhov, who is the only non-minister level 3 person in the National Defense Council, and the National 4 Defense Council in the Russian regime has suddenly started 5 flexing its muscles, and in fact the very day we met with 6 them they had a meeting that afternoon in the Kremlin at 7 which Yeltsin fired the Minister of Defense and the Chief of 8 Staff of the Armed Forces because they weren't going along 9 with the recommendations of the National Defense Council for 10 streamlining the military. So it's an interesting dynamic 11 that is happening there. 12 You can see that the members of this standing 13 committee are either ministerial level or deputy level. I 14 believe Vishnevsky is the head of GAN, and the Minister of 15 Finance happens to be the Minister of Finance. I don't know 16 who the representative from the Ministry of Defense is 17 because it was Kokoshin, but he moved up to become 18 Secretary. So this is a fairly high level committee. It's 19 a standing committee, and they are all supposed to oversee 20 this. 21 On the next sheet is a brief description of some 22 of their initial tasking, what they're going to do, and they 23 have to submit some recommendations by the 15th of October 24 on what path the Russians would take. 25 The second little tick under this initial tasking ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 52 1 is really for them to develop a framework for an 2 international agreement with the United States for getting 3 rid of plutonium. That's the kind of architecture in this 4 agreement you need. 5 And they are supposed to make an initial 6 declaration of what will be excess. It may be that they'll 7 say you did 50 tons, we'll do 50 tons. I don't know. But 8 we know that they are working on that. 9 And they are supposed to oversee on an interagency 10 basis the management of this problem. 11 So we are really excited over this move, because 12 it means that at the highest levels in the Russian 13 Government they are taking some action. President Yeltsin 14 has responded also to the Holdren-Velikhov Report. One of 15 the things that they have been asked to do is reconvene that 16 committee in about four or five months and provide to the 17 two presidents a progress report on how both sides are 18 moving, and that will help keep this thing moving along. 19 It's somewhat like a giant flywheel with bad bearings, and 20 if you don't keep it rolling it will just grind to a halt. 21 So this is encouraging. 22 There is one other thing. The schedule that I 23 showed you which showed when we would do construction and so 24 forth, in meetings the Russian Defense Council people picked 25 up and they asked, would you spend money on construction if ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 53 1 you don't have a bilateral agreement with us? My answer was 2 it will be very difficult to get money from the Congress if 3 we're not getting some reciprocity. They looked at all that 4 and decided that they had two and half years to get the 5 agreement or they're going to slow down the United States. 6 I think that was a very important conclusion and it provides 7 them an incentive to move on with this dialogue. So we are 8 hopeful. 9 That was all we had prepared. 10 CHAIRMAN JACKSON: Thank you. 11 Commissioner Dicus. 12 COMMISSIONER DICUS: No. I don't have any 13 questions. 14 CHAIRMAN JACKSON: Commissioner Diaz. 15 COMMISSIONER DIAZ: I don't have any questions. 16 CHAIRMAN JACKSON: Commission McGaffigan. 17 COMMISSIONER McGAFFIGAN: Just following up on the 18 breeder issue. Is that going to be part of the negotiation 19 as well, the production of further weapons grade plutonium? 20 Those reactors were designed to produce PU-239 with high 21 concentration. That starts to run into their vision of 22 their energy future. How is that going to be dealt with? 23 Not the specifics of negotiating strategy, but is that on 24 the table, production of further weapons grade? 25 MR. CANTER: This whole thing is very complex, ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 54 1 almost a web of intrigue. There is also an effort underway 2 to develop a fissile material cutoff treaty in which the 3 parties will agree to cut off the production of fissile 4 material. For example, although we are buying surplus HEU 5 from the Russians, 500 tons over so many years, they are 6 still making HEU. So when do you stop? We're not, but they 7 are. That will encompass the production of plutonium. 8 Also, as part of this disposition program, as I 9 explained, the one breeder that they have we've got an 10 agreement to work on the development of converting it to a 11 burner, a net burner. There is no intent on our part, and I 12 think most of the Western nations, to subsidize in any way, 13 shape or form construction of more fast breeder reactors or 14 probably any new reactors as long as we can get the job done 15 with the existing reactors. 16 With regard to immobilization, the Russians have 17 agreed that there are some forms of plutonium that they want 18 to dispose of as waste in an immobilized form. One of the 19 things we discovered just recently is that they had a policy 20 that if some waste had more than 200 ppm plutonium in it 21 that they had to process that waste to recover the 22 plutonium. I think now that they have to pay for things 23 they are going to find out it's an enormous burden. 24 We have got an agreement from them that we are 25 going to take on a study to examine that limit, and it will ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 55 1 be much higher, which will mean that more material would 2 logically be wasted and go into immobilized form. I don't 3 know how much yet, but just to get them to agree to do that 4 was a significant discussion. 5 COMMISSIONER McGAFFIGAN: Just to nail this down. 6 You said with regard to the existing BN-600 the goal is to 7 convert it into a burner, but I believe Yegorov is quite 8 bullish on -- I don't know where they'll get the resources, 9 their internal resources -- building future BN-800s in 10 quantity. Your answer was that we will not ourselves or 11 European countries likely subsidize Russian breeders, but if 12 using their own resources they go to breeders, will the 13 blankets on those breeders and their ability to breed 14 weapons grade plutonium be a subject of the negotiation? 15 MR. CANTER: I'm sure it will be. The work we are 16 doing on the BN-600 could be directly applicable to the 17 BN-800s that they want to construct, but we just don't know 18 where they'd ever get those resources. 19 CHAIRMAN JACKSON: Thank you very much, Mr. Canter 20 and colleagues. This has been a very informative briefing 21 on a subject that has both national and international 22 security and, I would say, economic significance. 23 The Commission recognizes the Administration's 24 view of the importance of this program to this country as 25 well as to other nations around the world and the need to ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 56 1 successfully address the broad goals and objectives of the 2 program. The issues involved, as we can see from our 3 discussion, are complex, but the NRC is ready to carry out 4 those responsibilities within our regulatory purview, both 5 existing and expanding. In fact we tend to be out ahead of 6 the game. 7 Briefings like this are important so that we can 8 make sure that we are not overly planning or under planning. 9 to that end, the Commission would request that you continue 10 to keep a very open line of communication with the NRC staff 11 on these activities to assure that the program as it evolves 12 is carried out effectively and efficiently and that any 13 policy issues that need to be surfaced are surfaced in a 14 timely way. 15 The Interagency Working Group on Plutonium 16 Disposition should be helpful in this regard, but again I 17 stress I think it is very important that the DOE and the NRC 18 specifically have very open lines of communication. 19 Again, I thank you and your colleagues for coming 20 to brief the Commission today. Unless there are further 21 comments, we are adjourned. 22 MR. CANTER: I did want to pass something on to 23 you which isn't in the presentation. I have asked our 24 general counsel's office to work with your counsel, because 25 what we would like to do is develop whatever legislative ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 . 57 1 package we need for this so it can go in with the budget 2 submission in February. So we need to do that over the next 3 few months. 4 The other thing is, with regard to budget, we have 5 requested in the budget money that will be needed by our 6 contractor as an applicant to pay for the full cost recovery 7 and everything, because we don't request the FTEs or 8 whatever is needed to provide sufficient resources in the 9 Commission staff. So we're faced with the fiscal '99 budget 10 being developed and going through OMB very shortly, and I do 11 not have any feel right now for whether or not the 12 Commission staff has anticipated a workload, because if we 13 proceed on this schedule, there will be work for the 14 Commission staff starting in fiscal '99. 15 CHAIRMAN JACKSON: I can't tell you what the exact 16 plug in the budget is for this, but I do think there is a 17 need to support us with the OMB in terms of relief from FTE 18 ceilings. That then would also be part of an appropriations 19 process and an appropriation to ensure that we have the 20 necessary resources to do this job. 21 MR. CANTER: Thank you very much. 22 CHAIRMAN JACKSON: Thank you. 23 [Whereupon, at 10:47 a.m., the public meeting was 24 concluded.] 25 ANN RILEY & ASSOCIATES, LTD. Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034
Privacy Policy |
Site Disclaimer |