Official Transcript of Proceedings

NUCLEAR REGULATORY COMMISSION

Title:  Commissioners Briefing on License Renewal Program

Docket Number: (not applicable)

Location:  Rockville, Maryland

Date:  Thursday, June 14, 2001



Work Order No.:                                  NRC-270 Pages 1-82


UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION

+ + + + +

COMMISSIONERS BRIEFING ON LICENSE RENEWAL PROGRAM

+ + + + +

THURSDAY, JUNE 14, 2001

+ + + + +

ROCKVILLE, MARYLAND

+ + + + +

		The Commissioners met in the Commission Hearing Room, at One
White Flint, Rockville, Maryland, at 1:30 p.m., Richard A. Meserve, Chairman,
presiding.
PRESENT:
	RICHARD A. MESERVE, Chairman
	GRETA J. DICUS, Commissioner
	EDWARD McGAFFIGAN, JR., Commissioner
	JEFFREY S. MERRIFIELD, Commissioner
	KAREN D. CYR, General Counsel
	ANDY BATES, Acting Secretary
	CHRIS GRIMES, Chief, License Renewal &
	  Standardization Branch, NRR
	JON JOHNSON, Deputy Director, NRR

PRESENT:  (cont'd)
	WILLIAM KANE, Deputy Executive Director
	  of Operations
	SAM LEE, Senior Materials Engineer, NRR
	DAVID SOLORIO, Safety Project Manager,
	  NRR
	MICHAEL TUCKMAN, Executive Vice President,
	  Nuclear Generation, Duke Power Company


	C-O-N-T-E-N-T-S
                  AGENDA ITEM                  	PAGE
Staff Presentation				8
Industry Presentation
  Michael S. Tuckman, Duke Power Company	52
Adjourn						82


	P-R-O-C-E-E-D-I-N-G-S
	(1:32 p.m.)
		CHAIRMAN MESERVE:  This afternoon's briefing deals with the
license renewal program.  And I think as everyone in the room is aware this is
a very, very significant program.  We received our first application in 1998, I
believe, for Calvert Cliffs.  
		We since then have processed now two of them.  With ANO Unit I,
I think it's imminent that having gotten through the Commission with just now
the license -- the formality of the license to be issued.  A large number of
other applications are now pending.
		We are aware that there are more coming.  In fact, people in the
industry inform us that we ought to expect that virtually all of the entire
fleet of 103 nuclear powerplants will eventually apply applications, submit
applications for license renewal.
		This is an enormously important activity for the NRC and for our
licensees.  In that connection, the staff has been developing generic guidance
documents of various kinds in order to facilitate the relicensing process and
to enable efficiencies.  We've done remarkably well so far, and I think all of
us join in complimenting the staff for their capacity to live well within the
deadlines that we have set.  
		We hope that we'll be able to continue on that course.  And one
of the ways in which we believe that may be facilitated is through these
guidance documents.
		So we have a briefing this afternoon in which we're going to
hear first from the staff.  Let me turn to my colleagues and see if they have
any opening comments.
		COMMISSIONER MERRIFIELD:  Yes.  Mr. Chairman, I would say I'd
like to join you in your comments about the staff.  I think the most difficult
thing that we have as Commissioners right now, when we have meetings on license
renewal, is trying to figure out new adjectives to use for our pleasure, which
the staff has proceeded in this regard.
		It has been an exceedingly good effort in every single way, one
that has brought a lot of distinction to the Commission, and certainly a lot of
plaudits from the folks up in Congress who ultimately give us our money.  
		So I would -- I did want to add my congratulations, and an
excellent job, and hopefully even further improvements can be gained down the
road.  And I think we are very impressed in that respect.
		COMMISSIONER McGAFFIGAN:  Mr. Chairman, I might just add, I
think as of this moment we have six applications for 12 units, assuming
Arkansas Nuclear I is behind us -- before us.  Is that right?  Didn't we
receive the Catawba McGuire today?
		CHAIRMAN MESERVE:  Yes.
		COMMISSIONER MERRIFIELD:  So we've got 12 units on the deck, and
I think sometime in the not-too-distant future we may have up to 20 units
simultaneously, or more simultaneously under review.  So we've got to
compliment them, but they've got to -- the hard part is dealing with the bow
wave that's about to hit them.
		CHAIRMAN MESERVE:  Why don't we get underway?  Dr. Kane?
		MR. KANE:  Thank you, Mr. Chairman, and Commissioners. 
Appreciate those remarks.  I'll cover part of the same ground here that you
have.
		We do believe that the license renewal program has achieved some
really important accomplishments to date.  The renewed licenses for Calvert
Cliffs and Oconee, as you noted, were issued in 2000.  Next week we expect to
issue the renewed license for the ANO I.
		The reviews for Hatch and Turkey Point continue to meet the
established milestones.  We received an application for Surry and North Anna
units on May 29th of this year.  And as you noted, we received an application
from Duke Energy for their Catawba and McGuire plants today.
		On April 26th of this year, the staff submitted SECY-01-0074 to
the Commission, which presented improved guidance for the implementation of the
license renewal program for Commission approval.  Improved guidance was
developed from NRC research and operational experience on aging, as well as
from experience gained during the initial license renewal reviews.
		The improved renewal guidance consists of a generic aging
lessons learned report, a standard review plan for license renewal, and a
regulatory guide.  The Commission separately requested annual briefings on the
status of the license renewal program.  The briefing today will cover the
status of the license renewal program, including highlights of the program
accomplishments, our planning to accommodate the future renewal workload.
		Jon Johnson, Deputy Director of NRR, is going to describe the
purpose of the briefing in more detail and introduce the staff speakers.  Jon?
		MR. JOHNSON:  Thank you, Bill.
		Chairman, Commissioners, good afternoon.  We're here to discuss
aspects of the license renewal program, and the briefing is really twofold;
first, to provide a status report on license renewal, the schedule and resource
planning, and, secondly, to discuss the improved guidance documents.
		We'd like to provide the basis for our request that the
Commission approved publishing these guidance documents as we requested in our
memo of April 26th.  As part of background, in 1999, the Commission directed
the staff to focus its review where existing programs should be augmented and
also to provide credit for existing programs.  We believe we've done that, and
we'll explain how.
		I'd like to make several points.  The effort here has been a
team effort.  It has involved NRR, Research, OGC, as well as the regions. 
These documents, these generic documents, we believe are living documents.  We
do intend to keep them updated as we learn lessons.
		We've prepared and initiated a demonstration project with the
industry to actually test to see how we could use these documents.  And also,
the last point I'd like to make is that, as Commissioner McGaffigan indicated,
we have a number of license renewal applications that we've just received.  We
have the most that we have ever received.  
		And in order to meet the efficiencies that we've assumed, our
staff has been meeting with industry to coordinate the milestone schedule.  We
still are sticking to the Commission policy with 30 months and 25 months, 25
months without a hearing.  
		But within that constraint we feel that in order to become more
efficient and effective that we have to adjust the milestones within that
schedule, because we have so many that we'll be dealing with at one time.
		If there are no questions, I'd like to turn it over to Mr. Chris
Grimes.  He's the Chief of the License Renewal and Standardization Branch.  We
have to get a new title for him, because we have -- in light of the future
licensing applications and interest, we have split, as you know, the future
licensing organization away from Chris to allow him to focus on license
renewal.
		Chris?
		MR. GRIMES:  Thank you, Jon.
		If I could have slide 3, please.  
		It's my great pleasure to introduce the staff's presentation
this afternoon by providing an overview of the program and reflecting a little
bit about how we got where we are today and where we're going for the future.
		Back in 1998, as Chairman Meserve noted, we received the license
renewal applications for Calvert Cliffs and Oconee, and we set off on an
adventure to take Part 54 and Part 51 and implement process and procedures to
achieve an aggressive but realistic review schedule for those first two
applications.
		We developed specific procedures in Office Letter 805 to
establish the conduct of the review process, to assign roles and
responsibilities to explain how the license renewal process would work.  But
those procedures were drawn largely from the processes that were used for
original licensing, which now seems like it was an eon ago, because we
discovered in implementing those procedures that this is a new world, this is a
new working environment, but the procedures provided us with an effective
framework.
		When we presented the proposal to the Commission in 1999,
developed Generic Aging Lessons Learned, even at that point our original
procedures had provided a system for collecting lessons learned, for gathering
the experience, and for adjusting the process as we went along to continually
improve it as we were achieving the milestones and working towards our
preparations that would position us for the future license renewal reviews.
		We also had Office Letter 906, which established the review
process for the environmental reviews, and it was largely more tested than
Office Letter 805 was, but it also had the challenge of implementing the
changes to Part 51 that accounted for a generic environmental impact statement
for license renewal.
		In addition, we created a brand-new inspection program and
Inspection Manual Chapter 2516 to establish an appropriate scope of inspection
that would verify important aspects of a license renewal application and the
staff's safety evaluation report.
		And with the cooperation of the regions, we successfully
implemented that with an inspection -- specific inspection procedure for that
manual chapter.
		As part of the process, we also had the benefit of some basic
process steps.  We have weekly staff meetings where the license renewal team
gathers and shares the status of the projects, the lessons learned, and
reflections on how the process can be more efficiently implemented.  And as a
result of that ongoing dialogue, we have established style guides that provide
aids to the staff in the conduct of the license renewal reviews and an adjunct
to the standard review plan.
		In addition, we have had the support of the bimonthly management
meetings, and the interaction between the license renewal steering committee
that was established by the staff, and the former support of the Executive
Council who set out management oversight expectations and support for the
program.
		In addition, we've provided a system of reporting and monitoring
that is now being developed in ways that we can improve overall processes, not
just license renewal, but ways to more effectively monitor programs throughout
the reactor licensing.
		Finally, I want to mention that we've taken to heart the desire
to offer ample opportunities for public involvement.  During the development of
the Generic Aging Lessons Learned Report and the standard review plan, we held
two public workshops.  We engaged public interest groups, industry
representatives, codes and standards in the research community, in order to
provide the broadest possible input to the development of the improved
guidance.
		We also set out to develop a communication plan to make sure
that we were taking advantage of the best-available experience in terms of
communicating with all of our stakeholders.  Throughout my description of the
program, I've referred to what we have done.  
		And when I say "we," I mean more than just the staff at the NRC
who work full-time on license renewal -- the majority of the NRR staff who
contributed in a variety of ways to the staff's review; the regions, who have
supported us through their inspection activities and the development of the
inspection program; the Office of Research, who have brought their aging
management expertise and talent and a background from the national -- from the
aging research program.  
		NMSS has even shared experience with us  because they are
developing license renewal for cast designs.  The General Counsel's office, who
supported us in the renewal review process, even the Commission, who have
supported the program, but also the applicants, the industry, and their aging
expertise, the international community who have shared technologies with us,
and, finally, the public interest groups who have shared with us their views,
their information concerning what they felt were important aging issues, and
offered us suggestions on how we can communicate more clearly to our public
stakeholders.  Do all of those people deserve recognition for what they have
contributed to this program.  
		And with that, I'd like to turn the presentation over first to
Dave Solorio, who is a Senior Reactor Systems Engineer in the License Renewal
Branch.  And he's going to provide an overview of the status and how we're
positioned now to take advantage of the process improvements for the future
workload.  And then Sam Lee is going to describe how we developed the improved
renewal guidance and the basis upon which we bring it to you for approval.
		Dave?
		MR. SOLORIO:  Good afternoon, Commissioners.
		Since this is the first annual briefing, I'm going to quickly
summarize a few of the past program accomplishments and quickly move to more
recent accomplishments and future activities.
		The first two renewal applications completed, as you've heard,
were Calvert Cliffs and Oconee.  Calvert was completed on March 23, 2000, and
Oconee on May 23, 2000.
		The staff's review of the Arkansas application, which was
received in February 2000, was completed ahead of schedule.  Last month we
provided the Commission our recommendation regarding renewal.  As a result,
we're looking at completing the review seven months ahead of schedule.  The
efficiencies with Arkansas's review can be attributed to similarities in design
with Oconee and experience gained by the applicant and the staff from the
Oconee review.
		We would expect the GALL report to provide similar efficiencies
to those observed with the Arkansas review, in that when applicants can refer
to an aging management program that the staff has previously found acceptable
both the staff and the applicant can save resources.
		Another success of the program this year has been the
development of the improved license renewal guidance discussed in SECY-0174,
and that will be covered in more detail following my remarks by Sam Lee.
		Next slide, please.
		The next slide provides an update on the current and future
activities.  Hatch was received in March 2000 and is progressing on schedule. 
All milestones have been met, and the review is on schedule to be completed by
March 2002.
		Turkey Point was received in September 2000 and is progressing
on schedule.  All milestones have been met, and the review is on schedule to be
completed by March 23rd.  Excuse me, March 2003.
		On May 29th, we received the sixth and seventh license renewal
applications for the North Anna and Surry power stations.  The review is
ongoing.  Today we received, as has been mentioned, the seventh and eighth
applications from Catawba and McGuire, operated by Duke Energy.
		We expect to receive one more application this year, next month,
from Peach Bottom.  Project managers have been assigned.
		Finally, I want to just mention the remaining bullets on the
slide are meant to illustrate that over the next few years we expect to be kept
very busy, and it's a prelude to my next slide where I'll discuss our review
planning process.
		On November 14, 2000, the staff issued a regulatory information
summary that identified the importance of future applicants providing the NRC
with advance notice of their plans.  Specifically, the regulatory information
summary requested future applicants to provide the NRC with their intention to
submit and provide an anticipated schedule as early as possible to improve the
accuracy and forecasting of our resources and our budget planning.
		Using schedule information from future applicants, and cost
experience from previous reviews, and expected efficiencies of the use of GALL
and the standard review plan, we have conformed our budgets for the next few
years to provide sufficient resources to accommodate this workload.  Also, to
aid us with this high number of applications, we're enlisting the assistance of
contractors.
		Based on the experience with initial reviews, and because we
expect more applications in-house than we've had in the past, we've developed
an anticipated resource model to help us manage overlapping reviews.  We have
also solicited feedback on this model from applicants submitting this year to
help with adjusting interim milestones, where practicable, to better balance
our resource loading.
		And, finally, we've established several measures for monitoring
our performance, such as total application review time, environmental impact
statement and safety evaluation report preparation time, review cost and
quality of requests for additional information and safety evaluation report
inputs.
		Our expectation is by monitoring these measures we can continue
to improve our program, ensure that our program continues to be effective,
ensure our planning assumptions remain valid, and be able to make adjustments
due to unforeseen events early enough to make necessary corrections.
		And that concludes my remarks and our briefing on the status of
the program.  Now I'll turn this over to Sam Lee, who will speak on the
improved renewal guidance.
		MR. LEE:  Thank you, Dave.
		Can I have slide number 7, please?
		During the review of the initial license review applications,
the staff and industry found that many existing programs are adequate to manage
aging license renewal.  Thus, NEI raised a question on how to credit existing
programs in a license renewal review.
		The staff prepared SECY paper 99-148 providing options and a
recommendation to the Commission to address NEI's question and to improve the
license renewal process.  
		In an SRM, the Commission endorsed the staff's recommendation
and directed the staff to prepare guidance documents to focus the staff review
in areas where existing programs should be amended.  The staff has completed
the improved license renewal guidance document in accordance with the SRM.  
		We have submitted those documents for Commission approval in
SECY-01-0074.  We believe this guidance document provides a stable and
predictable regulatory framework and improves the efficiency of the license
renewal process.
		Can I have the next slide, please?
		This has been a significant agency team effort, as you have
heard before.  It involved the NRR staff, including staff members who are
actually doing the -- conducting the license renewal application review, and it
also includes the Office of Research staff, who has significant knowledge of
aging studies.  
		Today we are here represented by Mike Mayfield and Jit Vora from
Office of Research, and also the General Counsel, OGC, and experts from two
national laboratories -- Argonne and Brookhaven.
		We also benefitted from public interactions.  Like you have
heard before, we held the first public workshop back in December of 1999, and
that was to get the stakeholders engaged early in the process, and then we also
made early drafts of the documents properly available, and we issued a draft
document for formal public comment in August of 2000.  
		And we followed that with a public workshop in September, and we
also held a -- we also had a Commission meeting in December to discuss public
comment, and we had many public meetings at NEI to discuss industry comments
and technical issues, including comments they raised at a Commission briefing.
		And the public also participated in the workshops, and they also
provided written comments.  And the Union of Concerned Scientists participated
in the Commission briefings, and they also provided technical reports for staff
to look at.
		Can I have the next slide, please?
		The improved license renewal guidance documents consist of the
Generic Lessons Learned, the GALL report, like you've heard before.  This is
basically a catalog of aging management evaluations.  It builds on previous
extensive Office of Research aging studies.  It reveals aging effects,
identifies the aging management programs, and it evaluates the adequacy of the
programs to manage the aging effects.
		If a program is found to be adequate, then the GALL report --
you indicate no further staff evaluation is needed for license renewal. 
Otherwise, you will indicate that the program should be amended for license
renewal and it be part of the review. 
		The standard review plan provides guidance to the staff on how
to review a license renewal application.  It refers the GALL report as the
technical basis to focus the staff review in areas where the existing programs
should be augmented.  And it also provides explicit instructions to the staff
on the appropriate use of the GALL report in conducting the review.
		We also have the Regulatory Guide for license renewal, which
proposes to endorse NEI Document 95-10, Revision 3, that provides guidance to
an applicant in preparing the license renewal application.  NEI 95-10 also
provides the standard format of a license renewal application and, thus, you
standardize future applications.
		The improved license renewal guidance is a consistent set of
documents, and the staff is well positioned to meet the challenging workload,
to review multiple applications, like what you have seen in the previous
slides.
		Can I have the next slide, please?
		The staff prepared a report, NUREG-1739, that documents the
staff evaluation of the public comments received on the draft documents.  It
includes the comments we received at a public workshop, and that was attended
by over 100 people.  And it also includes written comments submitted by about
130 commenters.  That includes individuals, public interest groups, NEI, and
industry, and it also addresses the five technical reports provided by the
Union of Concerned Scientists and comments by ACRS and their consultants.
		Together the staff evaluated over a thousand public comments,
and the stakeholder involvement has resulted in improving the quality of the
reports.  And throughout this process we have been monitored by the NRC
Steering Committee.
		Can I have the next slide, please?
		The staff is recommending Commission approval of the improved
license renewal guidance document; that is, the GALL report, the SRP, and the
Reg. Guide proposing to endorse NEI 95-10.  For the future activities, in the
SRM associated with 99-148, the Commission also directed the staff to provide a
recommendation on whether the license renewal rules should be revised to
address technical issues such as credit for existing programs.
		We are in the process of developing the staff's recommendation. 
We are also evaluating a rulemaking petition submitted by the Union of
Concerned Scientists proposing to add the rad waste system in the scope of
license renewal.
		At this time, based on the experience of reviewing license
renewal applications, the staff has not identified a need to revise the rule in
the near term.  We are planning a public meeting at the end of the month to
gather public comments, and we will provide our recommendation to the
Commission by the end of August.
		On the demonstration project, NEI is using the GALL report to
demonstrate the preparation of future license renewal applications.  NEI has
submitted sample application sections for staff review.  We plan on completing
the demonstration project by the middle of October in order to support next
year's applicants who are planning to use the new guidance documents.
		Like Jon has said before, we perceive the improved license
renewal guidance documents as living documents.  After the documents are
issued, the staff plans routine maintenance to refine them, to keep them
updated, to capture lessons we learned from the demonstration project, and the
review of future license renewal applications.
		And, in addition, NEI has identified five technical topics for
further staff dialogue, and then, by -- resulting in enhanced guidance in a
future update.  The update schedule would depend on the significance of changes
that we will identify.
		And this concludes the staff's formal presentation.
		CHAIRMAN MESERVE:  Good.  Thank you very much.  You covered a
lot of territory.
		Commissioner McGaffigan?
		COMMISSIONER McGAFFIGAN:  Thank you, Mr. Chairman. 
		I'm going to go back to slide 5.  My memory is fading, I think,
now that I've been here 25 years, or been in government 25 years.  But my
recollection is that these numbers on this chart -- we've got three
applications in 2000.  We're leaving our Arkansas Nuclear I because we're
already finished with it.
		We have five this fiscal year, and we have five, then six, then
five, then four.  Our recollection is we had a lot lower numbers in projecting
forward, say, a year ago.  So we have been surprised on the up side, have we
not?
		MR. GRIMES:  Actually, the total number over a longer timeframe
has been relatively constant.  We've seen schedules moving forward in most
cases.  But at one point I would say about a year ago, you may remember that we
had a -- we were talking about filling slots to try and achieve -- to work up
to a level of eight applications a year.  And so it's not as demanding as some
of the projections that we've had in the past.  
		COMMISSIONER McGAFFIGAN:  Most of his people have slid forward
and sort of smoothed things out at the moment, but if some of those other folks
slide forward you could be back up to eight in a peak year, depending on what
happens.
		Okay.  The resources -- we did not budget to have five
applications by June of this year when we were doing the FY2001 budget.  Did
we?
		MR. GRIMES:  I believe we did.
		COMMISSIONER McGAFFIGAN:  We had --
		MR. GRIMES:  I believe that when we went back and reviewed the
fiscal 2001 budget once the figures were approved that we accounted for these
applications -- Dominion, Duke, and Peach Bottom.
		COMMISSIONER McGAFFIGAN:  Arriving in the June timeframe and
getting appropriate attention in June, July, August, presumably whatever you do
the first three months of receiving an application.
		MR. GRIMES:  Yes.  I remember specifically when --
		COMMISSIONER McGAFFIGAN:  Because as I recall it, we were
expecting these in September.  And so you're saying, "We don't have to do much
in fiscal 2001.  They're just going to be here for a few days that year."  Now
they're here for three months.
		MR. GRIMES:  That's correct.  I specifically remember when we
formally changed the projection to account for the fact that Dominion had moved
up almost a full quarter into fiscal 2001.  And so my recollection is that the
2001 budget right now -- actually, the 2001 budget right now shows an
underspending in license renewal applications because it assumes the resources
are level.
		We expect that we're going to pick up at the back end of the
year and compensate for that, but I believe we have --
		COMMISSIONER McGAFFIGAN:  So you have the resources you need.
		MR. GRIMES:  -- enough resources budgeted.
		COMMISSIONER McGAFFIGAN:  Okay.  You talked about adjusting
milestones, or Mr. Johnson did.  You know, we had this for the first few
applicants.  Was it 571 or 581 days for the stuff that was in your control?  It
was one of those numbers.
		MR. GRIMES:  585 days.
		COMMISSIONER McGAFFIGAN:  585, okay.  585 days was what it --
when the SER and the EIS would come to fruition, including the ACRS -- I think
for the later ones that included the ACRS review period.  Or did it not?
		MR. GRIMES:  It did not.
		COMMISSIONER McGAFFIGAN:  It did not.  So the ACRS review period
was another 30 to 60 days on the 585.
		MR. GRIMES:  That's correct.
		COMMISSIONER McGAFFIGAN:  These adjustments that you're now
talking about with the applicants, what are the typical periods that you're
talking about for the stuff that's under your control?
		MR. GRIMES:  We're still maintaining the 585-day limit on the
production of the safety -- final safety evaluation report and the final
environmental impact statement.  We're looking at the front end of the process
more because of improvements in the handling of the application.  
		For example, we want to allow the staff to have more time to
actually begin preparing a safety evaluation before we finalize the request for
additional information.  That provides a better quality of information request. 
It also provides for more effective communication.
		Similarly, if we've got -- when we've got three applications
competing with staff attention at the same time, if we move milestones around
so that we don't have them competing with each other for attention in the
designation of open items or in the conduct of inspections, those details of
the schedules --
		COMMISSIONER McGAFFIGAN:  And you're able to do all of that and
still keep the 585 total?
		MR. GRIMES:  Yes, sir.
		COMMISSIONER McGAFFIGAN:  Okay.  I hope you're not using too
many mirrors, but that's fine.
		There is one item that came up recently that I had some concern
about I'll raise, and that's that part of this scheduling these new
applications -- I guess starting with Turkey Point -- you're -- the rule in
Part 51 says that it will provide for a minimum of 45 days for the comment
period on the draft environmental impact statement.
		But for the first four applications we -- through Hatch we
allowed for a 75-day public comment period, which is obviously above the
minimum of 45.  But the thought was that you all would want to go back to 45
days, starting with Turkey Point, on the grounds that this was helping
effectiveness and efficiency.
		If you're taking the full 585 to do this, and if the
environmental impact statement, as I understand it, wasn't the long pole in the
tent for Arkansas Nuclear I where we did it in even less time, why do we have
to shorten the comment period?
		MR. JOHNSON:  Well, Commissioner, one of the things we need to
understand is that the comment period is not the only period we rely on to get
public comments.
		COMMISSIONER McGAFFIGAN:  I know there's a scoping session
early.
		MR. JOHNSON:  We --
		COMMISSIONER McGAFFIGAN:  That's the first time the public sees
a document produced by us.
		MR. JOHNSON:  Well, we start off early when we get an
application and announce that we have the application, so that anybody who is
interested can have that information.  We put it on our website.  We provide
announcements in public newspapers about meetings.  We have meetings on the
scoping process.  We have meetings during the comment period.
		So we feel that it's the best thing for engaging the public is
to engage them early and not wait for the end of the period where this federal
notice period would take place.  So --
		COMMISSIONER McGAFFIGAN:  But the federal notice period usually
you will -- the notice will read, "The draft environmental impact statement is
now available, and you have 45 days to comment on it.  During this period we
will conduct public meetings in towns X and Y to discuss it."  And the public
is welcome to attend those meetings, which will be the subject of a separate
Federal Register notice.
		So that's what the notice reads.  The first time the public has
a chance that they -- they have a chance to come to the scoping meetings early
on and say, "I'd like to have X, Y, or Z addressed in the EIS."  But the first
time they see whether you have chosen to address those points is when they see
the staff -- what the staff has committed to paper.  And 45 days is -- it's the
minimum.  I think it's the statutory minimum.
		We have had -- you know, we've been using 75 here.  When we did
the PFS environmental impact statement I think we did 90, because that's what
some of the other federal agencies who were co-writers typically used in their
EIS process.
		So what -- the question:  what do you buy in terms of -- I'm
giving up some public confidence here.  What am I buying in terms of
effectiveness and efficiency?
		MR. JOHNSON:  Well, first of all, we don't think we are giving
up public confidence.  But what we do -- what we do believe is when we first
started off we didn't know how long it would take, whether we would need 45
days or need to grant exceptions or extensions.  And so we assumed the 75-day
period.
		But what we've learned after doing some of these applications is
we really didn't need it, we didn't need the 75 days.
		COMMISSIONER McGAFFIGAN:  All the comments came in within the
first 45?
		MR. JOHNSON:  I don't know that exactly, but it --
		MR. GRIMES:  The comments normally come in right before the end
of the comment period, and I --
		COMMISSIONER McGAFFIGAN:  How do you know they didn't need the
full 75, whoever submitted the comments?
		MR. GRIMES:  Because the measure of public confidence is not
just the time that's available for them to comment.  I want to emphasize the
interested -- all of the interested parties, anyone who participated in the
scoping meetings, actually sees the draft EIS earlier than the time that we
notice, that we've started the comment period.
		COMMISSIONER McGAFFIGAN:  Is that right?
		MR. GRIMES:  That's correct.
		COMMISSIONER McGAFFIGAN:  So you make the draft EIS available --
		MR. GRIMES:  It's available a week or two before the notice goes
out.  And another point is -- that I want to emphasize in terms of process, we
have this public meeting.  We also engage the commenters more directly in order
to understand what their concerns are and to make sure that we're being
responsive.
		And as Jon mentioned, what our experience has been is they don't
need the whole 75 days.  We don't need the whole 75 days.  And particularly
with the combined applications, the expertise that we're relying on is going to
be trying to do two sites at the same time.
		COMMISSIONER McGAFFIGAN:  Right.
		MR. GRIMES:  And so rather than have this extended public
comment period, we felt that we would use a scheduling change along with more
direct involvement with the interested public in order to make sure that we do
not lose public confidence in the process.
		COMMISSIONER McGAFFIGAN:  Well, the contractors -- it strikes me
if -- I don't know whether -- say we have the North Anna, the Surry, the Duke
and Catawba applications, you're going to have to schedule those some way.  But
if you have a 45- versus a 75-day comment period, you're going to be working on
Surry in January rather than December, North Anna in February rather than
January.  Everything just slips 30 days.  I don't see why the contractors, you
know --
		MR. JOHNSON:  We can provide a lot of the details, but I think
from a big picture standpoint there's a lot that has to be coordinated by the
teams.  We have several teams of contractors from several national
laboratories.
		COMMISSIONER McGAFFIGAN:  What if you get -- I mean, if you have
a 75-day comment period, obviously, we're more reluctant to give extensions. 
But you said in the note to us that you'd be willing to give 15-day extensions
and perhaps two of them, if necessary.
		You know, your contractors then face the possibility one place
they ended up with a true 45-day comment period, and another place they ended
up with 75, because we had to give extensions.  And they are suddenly working
on the same application -- I mean, theoretically, everything has come together
at the same time.  
		With the 75 days you may have more predictability as to when
people are actually going to have to be working as opposed to 45 days with
extensions.  I won't belabor it.  I just have concerns about the
recommendation.
		Last question I want to -- the ACRS made some recommendations to
you, and you wrote back to them.  One of the recommendations was that the staff
should encourage applicants to include the results of the scoping process in
their applications.  The availability of these results will facilitate the
review process significantly and make license renewal applications more
understandable.
		I won't read the whole response from the staff, but the staff
more or less says in this response that we -- it isn't required by rule, but we
agree that it -- you know, that this is useful.  The staff believes future
applicants understand the importance of voluntarily providing scoping
information to improve the public credibility and efficiency of the review
process.
		That's sort of a promise they're going to do it without a rule. 
Nevertheless, the staff will continue to work with industry representatives to
develop improvements to the guidance, and the staff will note this
recommendation response to the Commission's request for the staff to evaluate
the need for any renewal rule changes.
		I think you've gotten four applications in the last week, and
you haven't read them all yet.  But have they all included the results of the
scoping process, so we don't really need a rule because we're already getting
it?
		MR. GRIMES:  Your first observation is the most germane, and
that is we just got -- we haven't even had Dominion for a week.  But I can tell
you that as we've met with the industry and talked about standardizing the
contents of the applications, and improving the presentations and material, the
industry has agreed that there is a need to present the information in a
context so that the public can understand the application.
		And so when we talk about voluntarily providing information,
we're really talking about presenting the results of the scoping, as the rule
requires, in a context that makes it useful and meaningful information.
		We're going to pursue this question a little further, because it
-- we could resolve this issue by changing the rule requirements to be more
explicit about information that's presented in the application.  But our
experience with the applications thus far suggests that the ACRS's interest in
seeing more of the scoping information could be resolved simply by providing
more style, guidance to the future applicants.  This is one of the features
that we can test during a demonstration project.
		COMMISSIONER McGAFFIGAN:  My sense was that the ACRS -- that
this was, you know, based on their experience reviewing what you all were
doing, and that they felt -- I mean, it was, you know, a recommendation that
they felt reasonably strongly about, that you all needed this information in
order to put this -- put everything in context, and that it helped facilitate
-- I mean, from the industry's perspective, if it is helping to facilitate
your, and, more importantly, ACRS's review at the end of the process, then I
would think that that's a useful thing.  NEI -- I assume NEI 95, whatever, Rev.
3, does not include what the ACRS recommends.
		MR. LEE:  Yes.  I'd just like to add -- the Regulatory Guide
endorses 95-10 and also the SRP.  They have language in there that provides
guidance to the staff and the applicant to encourage this confirmation.  Okay?
		And what we did was -- I guess that got the ACRS's attention was
through the public comment period, okay, the public comments -- this is not
required by the rule.  So what we did was we've gone through the document and
explicitly stated --
		COMMISSIONER McGAFFIGAN:  Well, this is done as part of their --
		MR. LEE:  Okay.  But they are -- you know, like "should," we
use, you know, should provide, may provide.  They are still in there.
		COMMISSIONER McGAFFIGAN:  Okay.
		MR. LEE:  Okay?  But we actually acknowledge that this is not
required by the rule.  That was the only change.
		MR. GRIMES:  I'd also -- I'd like to add there is a mutual gain
here, because, as you pointed out, if it takes more effort for the staff to
understand the scoping results, and they may have to pry with more questions,
the applicants, in the end, end up expending an equal amount of energy.  If
they put the information at the front end and can avoid questions about
scoping, then we're both motivated toward the same desired outcome.
		COMMISSIONER McGAFFIGAN:  This is one of these -- I asked the
question a week or two ago in some other context as to whether this was really
a rule or it wasn't a rule, and I'll -- it sounds to me that this is sort of a
quasi-rule that had best be honored or else applicants may have longer review
processes, which they don't want to have.
		And if it is in that sort of limbo state, there's something to
be said for amending our rules to be compatible with the de facto situation. 
But we'll see what you all have to say in a month or two.
		CHAIRMAN MESERVE:  Commissioner Merrifield?
		COMMISSIONER MERRIFIELD:  Thank you, Mr. Chairman.
		I would -- Commissioner McGaffigan talked a little bit about the
75 days versus the 45 days.  And I would comment more than anything else sort
of a conflict that I think all of us share around here.  On the one hand,
there's a desire to really provide sufficient opportunity for the public to
comment on these matters.
		And when there's some balance here, you say, well, you know, we
want to make sure that we provide a full and vibrant opportunity for the public
to do that.  On the other hand, there's a notion of, well, our rule says 45
days.
		COMMISSIONER McGAFFIGAN:  A minimum of 45 days.
		COMMISSIONER MERRIFIELD:  Minimum of 45 days.  You know, human
nature being what it is, with a lot of cases while you might work on something
for the entire period, it's really the last two weeks that you're working on
it, relative to whether it's 45 days or 75 days.
		So, you know, you can go back and forth either way.  I think it
is something that the staff needs to reflect on some more.  Is it a matter that
our public has taken that full amount of time?  Do they need that amount of
time?  Would 15-day waivers account for it?  
		I'm not certain, but I think it's -- I think, like Commissioner
McGaffigan, I struggle with making sure that we are balancing it appropriately. 
And I certainly urge the staff to take a second look at that in that respect.
		On page 5 of SECY-01-0074, the staff writes the following. 
"When applicants state that their aging management programs are bounded by the
GALL programs, the staff's review will shift from reviewing each program in
detail to verifying the applicant's assertion."
		Could you give me a little bit more meat on that and what --
from an implementation perspective what that really means?
		MR. GRIMES:  In practice, this whole concept of credit for
existing programs was one -- an ability to refer to an accepted practice for
managing aging effects in such a way that the -- instead of spending
substantial effort in reviewing how that is done, just simply go out and verify
through inspection that that's the practice that's being used.
		And so GALL, as the Commission I think eloquently stated, GALL
focuses on those things for which the staff needs to concentrate its energies
in establishing the effectiveness of the aging management practice, separate
from all of those typical aging management practices that we would find and we
would rely on to develop a safety evaluation conclusion.  And so this is
intended to explain that distinction.
		COMMISSIONER MERRIFIELD:  Okay.  As was pointed out on page 3 of
the same SECY, when we had our December 2000 Commission meeting NEI indicated
there were several areas that it believed the GALL report was establishing
unjustified requirements for aging management programs.
		Would you comment a little further on what you've done to
address these issues since we had that Commission meeting?
		MR. GRIMES:  I'll ask Sam to describe that in more detail.
		MR. LEE:  Yes.  In the GALL report, what we did was we go
through the -- the GALL report evaluation basically is a license renewal
review.  We go through the license renewal requirements to ensure the intended
function will be maintained for license renewal, you know, for aging
management.
		Okay?  So that's why we didn't go.  Okay?  So we explained to
NEI, we are not purposely going beyond the rule requirement.  Okay.  We are
trying to enforce Part 54.  And in that case we look at the component of the
aging effect, look at the program to see if the program is adequate or not. 
Okay?  Once you've done that, then NEI starts pointing out places where they
think we are requiring too much in terms of aging management.
		And then for those, we talk about them individually, you know,
like program by program.  Okay.  And then we resolve them on a program basis. 
Okay.  And there are a few that are still pending, we haven't quite resolved,
and those are the five remaining, you know, public -- you know, topics.
		MR. GRIMES:  Commissioner Merrifield, I'd like to add to that by
saying this -- the perceptions about what might be unjustified requirements, in
practice what we found was the staff had attempted to try and describe all of
the attributes of an effective aging management program.
		And in looking across the industry, there may be some programs
that do more prevention and less mitigation or more mitigation and less
prevention in terms of the aging effects.  And so we ended up actually having
-- we bounded it in a way that really exceeded what was needed for the purpose.
		And so the exercise that Sam described in terms of going through
the specific comments, we were able to separate out what are the specific
requirements necessary for an aging management program from optional ways to
achieve an effective aging management program.  And I believe that that's what
was fundamental to the question about whether or not there were unjustified
expectations.
		COMMISSIONER MERRIFIELD:  So you would characterize it the gap
in the perception of that has narrowed between ourselves and NEI?
		MR. GRIMES:  Yes.  As a matter of fact, I think in the sheer
numbers I would say that we -- we addressed this -- over a thousand specific
questions concerning aging management programs, and we're left with five topics
where we need further dialogue.  So I would say that we achieved a substantial
alignment between the industry and the staff on what the standard of
acceptability is.
		COMMISSIONER MERRIFIELD:  One of the issues that I think you're
going to have to deal with from a management perspective -- and I wanted to get
your comments on this -- we've gone from a point at which we had a relatively
smaller number of plants under review to, obviously, we've got a lot on our
plate now with all of those that have come in recently.
		Issues such as the GALL report and the standard review plan
become more critical as you have presumably a larger number of staff who are
part of this review process.  And how -- are you comfortable with the program
that you have underway to make sure that we've consistent, that we -- in
dealing with all of these different reviews, that we're not, because of that
wider number of staff and the possibilities for greater variance, that we're
not -- that variance isn't going to creep into the program in our reviews?
		MR. GRIMES:  Yes.  I'm very confident, because, as I mentioned,
we have weekly team meetings where all of the participants, those that are well
versed in license renewal and have been involved for a long time, down to the
new folks just out of the orientation session, are all sharing experience.  
		And so the teambuilding that we've gone through I think provides
a process for making sure that everyone is working essentially to the same
expectations.  I also mentioned before that we've developed these style guides
in order to try and minimize innovation and creativity and trying to do it
different.  That has maintained a focus on what the desired outcome of the
review is, and it has provided us with measures that we can use to monitor the
effectiveness of the program.
		MR. JOHNSON:  I'd like to add that we also -- the Steering
Committee continues to meet, and we meet with not only our own staff
internally, but we have meetings with the industry representatives.  And they
are not shy about bringing up questions or concerns about consistency, and
we've dealt with a number of those.
		We also have teams of contractors that we use, and, as an
example, the environmental reviews that these teams have -- we've taken from
different laboratories, so that there is a mix of people.  They're not just one
isolated group off doing some, and they don't talk.  They actually get the
experiences from each other, so we get management overview of that, too, to
make sure that those reviews are being done consistently.
		COMMISSIONER MERRIFIELD:  One quick last question.  In the SECY,
you talk about the staff evaluating the resource needs associated with the
demonstration program.  And I'm wondering if you completed your analysis of
what that staff requirement is, and describe it briefly in terms of where you
think you're going on that.
		MR. GRIMES:  Yes.  We completed it.  As a matter of fact, we've
briefed the leadership team in their PBPM process, in terms of we've overspent
in infrastructure, budget area, because the original 2001 budget did not
provide for the level of activity.  
		We had assumed that after we presented the Commission paper that
we would drop down to a maintenance level, and we now see that it's -- you
know, it's going to tail off into next year, but so far as we can tell we'll be
done in September, so we're not going to impact the next fiscal year's budget.
		But we have sufficient resources.  We have people who are
working on that aspect of the project right now, and so we don't view those
resource demands as limiting us in any way.
		COMMISSIONER MERRIFIELD:  Thank you, Mr. Chairman.
		CHAIRMAN MESERVE:  Thank you.
		Let me follow up on the resource needs issue.  It occurs to me
that a large number of these applications that you have pending are ones that
are in Region II.  And you're going to be calling on inspection resources
there, or you have.  Are they going to be in a crunch?
		MR. GRIMES:  I talked to Luis Reyes.  The vast majority of
license renewal is in Region II.  And as we've budgeted, Luis has recognized
that -- you know, that he has a larger burden to carry.  But at the same time,
he has an advantage.  
		The other regions that are looking at spotty license renewal
activity in the future years have a difficult time trying to maintain a cadre
of experience.  Luis has a steady workload, and so the --
		CHAIRMAN MESERVE:  They can be happy.  He has all the --
		MR. GRIMES:  Right.
		CHAIRMAN MESERVE:  I see.  Okay.
		MR. JOHNSON:  Also, Chairman, the inspections we've done to date
have used staff from different regions, so they could learn.  So if there is
someone available in Region I or Region IV that has already conducted an
inspection, we would expect possibly to use those resources to assist in Region
II also.
		CHAIRMAN MESERVE:  Okay.  Flexibility.
		I have just one other question.  Dr. Lee, at the end you had
indicated that there are these five technical issues that are still
outstanding.  Could you say something about where we are on the path to the
resolution of those issues, how significant they are, and if they fail to be
resolved in a generic basis, and whether they're going to slow us down.
		MR. LEE:  For those, the staff already identified programs as
adequate to manage aging.  Okay?  And in this case -- and, yes, I want to
continue to exchange more information in terms of, you know, trying to
understand why the staff want that level of program.
		And we had, you know, several meetings with NEI on those topics
already.  And now I guess just about two weeks ago or so we sent NEI a letter
on what we believe, okay, NEI's concerns with those issues are.  And then we
are going to work on a schedule and attempt to address them and get it into a
future update.
		MR. GRIMES:  Yes.  I'd like to emphasize I sent a letter to NEI
outlining not only our understanding of the issue, but also in the letter we
specified the schedule that we wanted to work to.  And the way that we
characterized those issues, we do not see any that would hold up continued
progress on license renewal reviews.  These are clarifications and
opportunities for further efficiencies.
		CHAIRMAN MESERVE:  I presume you haven't had a chance to have a
response to that letter yet?
		MR. GRIMES:  No, we have not.
		CHAIRMAN MESERVE:  Okay.  Commissioner Dicus?
		COMMISSIONER DICUS:  I have a resource question as well.  It has
to do with the fact that I think you're aware we have a large number of staff
across the NRC eligible for retirement.  Are you vulnerable to some retirements
in your resource situation?  And would that create a problem with gearing back
up, if you were to lose people?
		MR. JOHNSON:  Well, I think one of the things the leadership
team does is they meet periodically, they're meeting right now, to look at our
approach for future reactor licensing if that were to come true, and how we
would staff that up.
		The resources that are used in license renewal, in Chris'
branch, are primarily from a project standpoint.  But the majority of the NRC
resources are in the technical staff.  And so they are spread out in the
Division of Engineering, and so forth.  
		And so it's not all in one -- all our resources and expertise in
license renewal are not concentrated into one specific group, but we are
looking in general, not only just for license renewal, but across the board at
our aging staff.  And that's why I think you see in some of this room here a
number of our summer interns and people that we're looking forward to bringing
in for the future.
		COMMISSIONER DICUS:  Okay.
		MR. KANE:  The issue is a general one and not unique to this
area.  I did want to say one thing in follow up to Commissioner Merrifield's
point.  Don't take the comments we've made as dismissive of the point.  I think
it is a major management challenge to make sure that we have programs in place
to make sure that we do get consistency from -- as we take on more work.  
		And there have been some -- some areas, as Jon has mentioned,
where we've found that.  But where we need to apply additional controls as time
goes on we will.  That's a good point.
		COMMISSIONER DICUS:  Okay.  So I'm taking your answer to say,
no, you don't feel you're vulnerable to retirements.
		MR. JOHNSON:  Well, I don't think we are vulnerable right now,
and specifically for license renewal, but in general that we are -- the agency
is --
		COMMISSIONER DICUS:  Sure.  We're aware --
		MR. JOHNSON:  -- looking at this across the board.
		COMMISSIONER DICUS:  Some of the high visibility reactor
activities -- for example, I'm referring to the cracking of Oconee -- would
this impact the priority -- your priorities that you have for the license
renewal program?  Does this change anything, is what I'm saying?
		MR. JOHNSON:  Well, I -- we've discussed this, and this is an
issue that we see right now that we need to deal with for the current operating
plants.  It's not a license renewal issue per se.
		COMMISSIONER DICUS:  Okay.  So it doesn't change priorities.
		MR. JOHNSON:  It has not, no.
		MR. GRIMES:  As a matter of fact, I would like to add, I thought
that the ACRS did a very good job of characterizing how it was appropriate to
rely on the existing programs that revealed this particular problem, and at the
same time recognize that the lessons that will be learned from the CRDM
cracking are -- will be folded into future program changes.  
		And that's consistent with the Commission's philosophy in
license renewal that relies on processes that are self-correcting and learning
processes.
		COMMISSIONER DICUS:  Okay.  Research's role -- what -- give me
some idea of what Research is doing, particularly now that the guidance
documents are essentially finished, some of the things that they're involved
in.
		MR. GRIMES:  The Office of Research is still undertaking -- for
example, there are ongoing research activities related to structural aging
issues.  They recently completed a report in that area, and we're -- and a
group of experts is looking at how to build on those results.
		There is research on materials issues, materials reliability
program that the industry is sponsoring.  The Office of Research is interfacing
with the American Society of Mechanical Engineers and the IEEE on process
improvements that will benefit the aging management programs that we rely on.
		COMMISSIONER DICUS:  Okay.
		MR. GRIMES:  That's the best I can do off the cuff.
		COMMISSIONER DICUS:  Okay.  Thank you.
		CHAIRMAN MESERVE:  Good.  I'd like to thank the staff.  You're
doing great work.  Keep it up.
		We're now going to have a chance to speak with Michael Tuckman,
who is the Executive Vice President, Nuclear Generation, for Duke Power
Company, and has had the privilege of being engaged in our license renewal
process.
		Let me --
		MR. TUCKMAN:  I've been wedded to the process.
		(Laughter.)
		CHAIRMAN MESERVE:  Let me say before we get started -- and I
should have announced this before the staff briefing -- is that Commissioner
Diaz had something come up that required him not to be here, and he did express
his regrets that he couldn't join us this afternoon, that an emergency arose.
		Please, why don't you proceed.
		MR. TUCKMAN:  Mr. Chairman, Commissioners, it's a pleasure to be
with you.  My name is Mike Tuckman, Executive Vice President for Duke Energy.  
		I have three hats that I think I wear in this particular
industry.  One, I've been leading the NEI working group on license renewal and
have had numerous opportunities to engage with each of you since 1993 as we
have been working toward license renewal.
		I'm a past customer of the Commission and having received the
renewed license for Oconee in May of last year.  And I was a satisfied
customer, and I'm coming back again.  And that's the reason --
		(Laughter.)
		-- I'm here and still interested in this process.  You received
our application for McGuire and Catawba this morning, all 296,000 words, at
roughly $12 per word as I calculated our cost.
		(Laughter.)
		1,340 pages, 11 volumes.  It has been a massive learning process
for us, and I'll talk some about what we've learned in efficiency, if you will,
in the process of going through it again.
		Can I have the first slide?
		I'll cover four areas today -- the industry perspective on
renewal as a program, license renewal guidance documents, I'd like to address
the class of 2001 -- we tend to talk in terms of class of 2001, class of 2002
-- and then kind of forecast the future for you just a little bit.
		Next slide.
		From the beginning, the industry has felt inherently that our
plants were safe and they could operate beyond 40 years of time.  Our analysis
through the license renewal process to us has confirmed that.  The unknowns in
the process, quite frankly, were, how would the NRC be able to document and
reach a conclusion that the plants were safe and demonstrate that not only to
yourselves but to the public?
		We were also obviously concerned relative to where the review
could go, that it might meander for a long time in areas that were not specific
to license renewal.  The schedule would be unkept.  The cost would be not
predictable, and the outcome was not very predictable. So those were concerns
that I had as an executive as we put our Oconee program forward.
		I'm happy to report to you today that those concerns have been
resolved.  We believe the program is running smooth, and it's a well-managed
program.  As you pointed out, five reactors have been completed.  The sixth one
is on the doorstep.  You have a number of applications in front of you, and 10
applications or 10 reactors, three licensees, are submitting their applications
within basically a two-month period of time.
		I would like to tell you that -- I will tell you, all scheduled
dates have been met by the NRC and the applicant.  I view this process -- the
585-day schedule that you just talked about -- as being, in essence, sort of an
unwritten contract sort of a contract.
		It was not just the end date that was specified.  Every
milestone along the way, whether it be when the first round of RAIs would be
out, when the sufficiency review would be out, when the applicant had to get
their RAIs back in, when the supplemental environmental impact statement would
be out.  Every single date for the -- both the industry and the Commission has
been met or exceeded.  I think that has done an awful lot for us.
		You've been lucky -- not lucky, that's the wrong term -- we've
taken advantage in the ANO case of the moons kind of aligning and the schedule
being able to be accelerated.  I think that was great that the staff was able
to do that, and potentially at times that same -- the moons will align
similarly, and that will work.
		We've worked very -- the three applicants for the class of 2001
are working very closely with the NRC staff to see if we can't lay out the
dates for the concurrent review of these three utilities, five sites, to make
sure that it can be done in an efficient way.
		So some of the milestones will be moved one way or the other,
the end date is the same, and, again, once the -- once we've agreed to the
milestone dates, we'll both achieve them.  
		But that's necessary for the efficiency.  You can't do five
environmental scoping meetings simultaneously.  It just would be chaos.  So we
very much appreciate the staff's openness to work with us and actually ask our
input and advice on the process.  So that has been very good.
		The NRC staff work is thorough.  I think all you have to do is
read an SER or read the request for additional information and you'll see this
is not a slam dunk.  It is not something that is given.  There are questions
asked.  There are hard technical questions to answer, and it has worked very
well.
		The process is reasonably stable and predictable.  I say
reasonably stable and predictable -- when I've talked to you before, one of the
concerns was regulatory accretion.  Will each application get harder, because
everybody has to ask the next 50 questions, more depth?
		By and large, the industry has learned from each applicant.  We
have worked together.  We review each other's applications.  We learn from the
preceding guy what's on the test, so to speak.
		The NRC continues to find new areas to delve.  Sometimes it's an
industry event.  You referred to the Oconee reactor vessel head cracking.  That
was, to me, a sterling example of success.  We had committed to a program of
aging management.  We implemented the program, and it found something in
corrective actions.
		So as issues continue to evolve in the industry, we believe
there will still be accretion, and it's probably justified to some level.  But
we have checks and balances in the process to make sure that we stay within the
guardrails of license renewal.
		Next slide, please.
		There's a structured appeal and resolution process.  It's not
used very frequently, but the staff is amenable to when we raise an issue
saying, "This has gone further than we think it should," or "We think it's not
justifiable."  They'll sit down and have a formalized process for mediating,
and it also gives us an opportunity, if we feel uncomfortable, to go to the
Steering Committee, the next level.  
		We've not had to bring anything to the Steering Committee.  Most
things are getting resolved at the staff level, at Chris Grimes' level, and I
would say it's working quite well.
		This process has had senior NRC management and utility senior
management involvement, and I think that has been key to the success of the
process.  
		It's been very open to the public.  Jon Johnson described the
many opportunities the public has had to comment on license renewal in one
shape or another, and we believe it has been a very open and transparent
process.
		The program is viewed very positively by the plant owners.  Why? 
Because the technical scope is bounded, the schedules are being adhered to.  It
is predictable.  That doesn't mean you can predict that you'll be successful,
but the process is predictable and that's what's important.
		Can further enhancements be possible?  Obviously, the answer is,
yes, further enhancements are possible.  My own learning is from going from
Oconee to McGuire to Catawba.  The cost of doing the two applications for
McGuire and Catawba were less than half the cost of doing the Oconee
application.
		The amount of time -- calendar time and work hours was less than
half that we've put together.  Clearly, the staff is learning -- you saw
through the ANO application -- as they become more familiar with the various
plant vendors and more familiar with the process, there are improvements that
can be made.
		I will make a comment that I know that staff is due to bring
back to you a recommendation relative to the rule change.  The industry has
learned how to use this rule.  The NRC staff has learned how to use this rule. 
There are efficiencies that can be gained in a risk-informed matter.  
		The predictability of what we have learned is the most important
thing to us today, so we would not urge changes to the -- excuse me -- we would
urge that there not be changes to the rule as we presently are using it to go
forward with license renewal at this time.
		That doesn't mean sometime in the future you couldn't do
something else, but we've just got the GALL process and everything laid out. 
Let's learn how to use that process in it and pick up the efficiencies that
way.  We believe the rule does provide for a safe license renewal process.
		Next slide, please.
		Let me talk about the generic documents.  Obviously, it was
discussed -- the genesis for SECY-99-148 was the issue of credit for existing
programs.  I sat in this chair in 1999 and asked you to take a real hard look
at existing programs, because we felt that the license renewal rule basically
said if you are doing something under the existing regime, that's acceptable,
and you should just go on.
		In your wisdom, you said, well, new programs or additions to
programs really ought to be looked at.  That's the focus.  And, obviously, the
guidance that is out there needs to be clear, understandable, to both sides, so
that there is some efficiency.  And you told the staff and us to involve
stakeholder participation, and that was what was done.
		Next slide.
		The Generic Aging Lessons Learned report is now created. 
Interestingly enough, I laid my application, just the text part of the
application and the text part of GALL, and they're about equal thickness.  So
we have about as much guidance as we have application thickness.
		The documents -- the GALL report does document the industry
compendium, if you will, of acceptable programs.  In some cases, and I think
I've had some discussion with some of you in the past, the GALL goes a little
further than any one utilities program in an area might go.  And that was a
concern that the industry had, so we've had lots of dialogue with the NRC staff
on this issue.
		I expect there are still some areas that go further than any one
utility will go.  And through the process of license renewal applicants, the
class of 2001 and '02, that will be identified, and we'll have opportunities to
adjust.  But we believe that, by and large, the compendium of documents and
justification that's been put together will be very useful to both the NRC
staff and to the utilities.
		Next slide, please.
		Generic Aging Lessons Learned report is a learning document. 
Much like when it was put out in August of last year there were 14 mechanical
programs; now there are 34 mechanical programs that are documented.  We will
continue to learn through the GALL process, as various utilities or applicants
are reviewed, and we -- we very much want the staff to quickly put out any
revisions to the guidance in a way that is easy for the next guy to pick up and
use.
		My comment -- the documentation/disposition process in this case
was probably the most thorough that I've seen on any NRC document that has gone
out for comments.  Comments were laid out clear, who wrote the comment, what
the comment was, the basis, and their resolution for it.  And it was very easy
to track the comments you sent in or other people sent in to see how they were
done.  So I just wanted to commend the staff for that.
		We talked about the industry project on the use of GALL.  And on
the next page, the class of 2002 basically got together and said, "Okay.  GALL
is out here.  Now, how are we going to use it?  How are we going to use the
SRP?"  And that process was started a few months ago and was submitted about
two weeks ago, to try and lay out several sections of the application, how you
would either reference or take exception or -- or write your own program.  
		We would like -- the staff indicated by the October or November
timeframe -- that they would give us feedback on it.  That will be a good way
to see how effective the GALL program could be used in the future.
		Everything we ever do settles on what's the level of detail
required.  So that will be a good test for us.
		The next page?
		Between the GALL, the SRP, NEI 95-10, which was approved by --
or referenced by Reg. Guide 1.188, we believe there's a pretty good set of
documents out there that ought to provide even more stability to the process
than we've had thus far.  So we feel pretty good.
		Next page?
		Our conclusions.  From the industry's perspective, the documents
should be issued for use.  And, again, it's imperative that the update -- that
they be updated periodically to incorporate the lessons learned as we go
forward and use these documents.
		Next page.
		The class of 2001, very briefly, three applicants, five
stations, 10 units.  As I review my own application for two units, I believe
you will see significant efficiency on the multiple applications.  They are
virtually identical and just point out differences.
		And I believe instead of -- at a level of effort of two for the
plant, I think you should probably expect an effort of 1.4 or something like
that.  Environmental is still different.  So I think that will help the
resource issue also.
		The generic documents were not extensively used by the three
applicants that are just coming in.  They were not available, not ready to use
at that time.  We had to do our application the latter part of last year and
the first part of this year.  We used what we could, but we -- you will not
find anybody referencing aging management program and GALL in these documents.
		We did, obviously, if it's there we took advantage of it, we
took advantage of ANO and Hatch and Turkey Point as they've gone through the
process also.  We used previous applications and questions.
		We expect technical questions and feedback on the GALL.  In
other words, if we didn't address something that's in GALL, we expect that the
reviewer will probably ask us the question.  We've tried to anticipate that in
our application, but the -- the GALL test, I guess, how effective the whole
process is, will probably start with the class of 2002.
		Lastly, forecasting the future.  We believe that most, if not
all, nuclear units will extend their operating licenses.  We expect review
times and work hours to reduce.  I say "review times."  I was really referring
to the work hours that go into license renewal by the staff.  Originally, on
Oconee, it was 22 person-years of effort by the staff.  We see that decreasing
to 15 and potentially 12 or -- or whatever.  But we expect that the total hours
to be spent reviewing to be reduced as a result of the generic documents that
are being used.
		Obviously, if the moon is aligned and you can get it done in six
months or eight months, or a year and a half, that's appreciated by the plant
owner, because that's plant staff that we don't have to have "standing by ready
to answer questions."  But we understand the juggling act of trying to look at
many applications simultaneously.
		The process requires continued NRC and senior utility management
oversight.  We feel good about where we are, and it's a large credit to the
folks that work in the trenches, both in the NRC and the utilities.  But I
think, assuming the program is in automatic and/or cruise control is probably
not a good assumption.
		And certainly until we get the GALL and everything moving, and
we see how well it works, we intend to stay involved.
		Thank you for the opportunity to make comments.
		CHAIRMAN MESERVE:  Thank you very much.
		Commissioner Merrifield?
		COMMISSIONER MERRIFIELD:  Thank you, Mr. Chairman.
		I started off in the first panel commenting about the staff and
the terrific job that they've done in the review process.  And it would be
inappropriate not to recognize the fact that I think in some ways our staff's
review has been easier as a result of the lessons the industry has learned. 
Obviously --
		MR. TUCKMAN:  We've been trying to make it that way.
		COMMISSIONER MERRIFIELD:  Yes.  I mean, I think, obviously,
there's credit on both sides of the house, which is certainly the message I
would want to leave.
		I don't want to let you off the hook.  On slide 3, you talked
about reasonably stable and predictable.  Obviously, we strive for excellence
around here.  What are those areas which aren't quite as stable and predictable
from the standpoint of either Duke or NEI?
		MR. TUCKMAN:  About the only thing that I would say is not
"stable and predictable" is the new wrinkle that comes up when a system is
looked at by a new reviewer.  Occasionally, you'll get some questions that were
accepted on a previous application, and either something new has been learned
or the reviewer looks at it a little bit differently, and you'll wind up with a
question on that particular area.
		That goes a little further than what you're used to seeing.  And
that's what I meant by the "stable and predictable."  We understand; we don't
expect the same questions every time.
		COMMISSIONER MERRIFIELD:  Right.
		MR. TUCKMAN:  But that's probably the only area that I see.
		COMMISSIONER MERRIFIELD:  Well, you know, like everything else,
we strive for balance around here.  Obviously, you know, our staff needs to ask
the questions that are necessary to answer the issues.
		MR. TUCKMAN:  The five issues that Chris mentioned, several of
those have taken longer to resolve than I think either side would like.  Things
like environmentally-assisted fatigue is an area that we have been struggling
with as an industry, inspection of small bore piping, and that sort of thing. 
Those are the sorts of things that I guess I would say add a little instability
to the process.  We need to get them resolved.
		COMMISSIONER MERRIFIELD:  Are they resolvable, from your
standpoint?
		MR. TUCKMAN:  Yes.
		COMMISSIONER MERRIFIELD:  Okay.  What was the -- just help me
understand, what was the motivation for deciding you need to have a
demonstration project on the use of the GALL?
		MR. TUCKMAN:  When we started with the GALL -- and, again, prior
to seeing what finally got issued here in April -- it was unclear how the NRC
staff would use GALL.  And when I say that, the first draft of GALL, as I
indicated, any one -- not any one program -- several of the programs had the
best features of all of the programs from the various applicants that had
applied.
		And we didn't think that was the appropriate yardstick to hold
up against any single applicant.  Maybe it should have been this or this or
this rather than this and this and this.
		So we said it did not look to us that the GALL would be used a
lot, and specifically referencing program reports exactly.  So we thought it
would be useful to set up a pilot program to try and see how we would use the
guidance, and how we would reference it, and what the staff would find
acceptable.  That was the reason, the genesis for it.
		COMMISSIONER MERRIFIELD:  It strikes me -- and that's fair, and
I think there is a recognition about that being the goal of the GALL report. 
One of the things that we always are concerned about, and I think this is
jointly between the Commission and the NEI members, is the issue of insularity,
and that utilities or individual plants are so ingrained on a way of doing
things that perhaps they're not opening themselves up to other opportunities.
		Do you think that going through the GALL process and seeing how
other utilities are doing their programs is providing a sideline of having some
introspection on the part of individual utilities to see maybe there's a better
way of doing things in our programs?
		MR. TUCKMAN:  Yes.  Clearly, if you have not thought about
license renewal, and you're coming into it for the first time, you might say,
"Gee, how do you guys do buried pipe inspections?" or that sort of thing.  So
you talk to your -- the guy who went before you, or you look in GALL, and
here's -- if you don't happen to have a program, this is a good way of kind of
sharing that experience.
		Or if you have a program, you might learn something from it and
alter your program for the period of extended operation.  So I'd say it was --
it is what it was set out to be -- a compendium of good practices on how to
manage aging.
		COMMISSIONER MERRIFIELD:  Thank you, Mr. Chairman.
		CHAIRMAN MESERVE:  Thank you.
		I'd like to pursue a little bit on your slide 4, where you --
make sure I pin you down on -- make sure we understand all that you intended to
say when you said "further enhancements are possible."
		I understood you to say that rulemaking is not something you
would encourage right now, that we ought to be updating all of the documents,
including the GALL, as we go forward.  So that's an enhancement.  Perhaps we
ought to have some -- nudge it along in the direction of stability in the
reviews.
		Is there anything else?
		MR. TUCKMAN:  Well, the -- could the license renewal be
risk-informed and, hence, eliminate a lot of things that are presently being
looked at in license renewal?  I would say, yes, it could.  The rule could
further limit the things that are looked at in license renewal.
		I will tell you, the way we do our scoping review and
everything, it does not eliminate that much work for us.  But it could -- it
could.  So what I'm saying, further enhancements in the rule is an example. 
That's one example of how you could achieve -- get more efficiency.
		CHAIRMAN MESERVE:  But I understood you to say that was not
something you were encouraging us to do right now.
		MR. TUCKMAN:  I am not encouraging you to change the license
renewal rule.  
		Another example -- the back end of the license renewal -- you
know, after you have received your license, and the way you incorporate all the
requirements for license renewal into the ongoing process, that was something
that was not looked at very hard because nobody had any experience with it.
		As several plants start getting experience with making sure that
we implement all our programs in an auditable fashion, etcetera, that might be
something in the future that we might want to gather some experience.
		The environmental area is another one.  You've now had a number
of cases where we've done the environmental reviews.  Basically, the
environmental reviews have not shown that they were having a negative
environmental impact.  
		A number of the items that have to be examined today could go to
category 1 if you chose to do so, and just eliminate a little bit more work. 
So that's another opportunity that we have to make the process a little easier.
		CHAIRMAN MESERVE:  Thank you.  That's helpful.
		For the most part, you are delivering good news here.
		MR. TUCKMAN:  This is a happy talk.
		(Laughter.)
		CHAIRMAN MESERVE:  And so I don't have very many questions for
you.  Usually we are trying to probe into what things we're doing wrong.  We
appreciate your coming today and helping us.
		MR. TUCKMAN:  Yes, sir.
		CHAIRMAN MESERVE:  Commissioner Dicus?
		COMMISSIONER DICUS:  Thank you.
		The numbers that the staff showed us a little bit ago out to
2005 on what we might expect coming in, do you kind of agree with those, or
disagree with them, or --
		MR. TUCKMAN:  Yes.  Through the Executive Steering group, we
tried to gather information from various utilities and present them to the NRC
staff.  We got into a little bit of difficulty in that because NEI doesn't
really speak for licensee A, and licensee A might not want to have their name
out.
		So we shifted with working with Chris, and then the NRC now does
that survey.  But it jives very closely with what our understanding of the
industry is today.
		COMMISSIONER DICUS:  Okay.  That's good.
		MR. TUCKMAN:  I have not seen anybody slip their application
out.  They're all coming this way, though.
		COMMISSIONER DICUS:  Noticed that.
		The question that I put also to the staff about -- and you
brought it up yourself -- on the head cracking at Oconee.  Staff says that's an
operating plant issue.  It's not a license renewal issue.  And I appreciated
that answer.
		But has that activity or that situation changed anything that
the industry is doing with regard to license renewal, taking another look at
something or anything along those lines? 
		MR. TUCKMAN:  Well, the industry has, though the materials
reliability program, of which I'm also co-chair, we've worked with the NRC and
brought all of the information we have relative to the Oconee head cracking and
the implications to the rest of the industry.  There is also an Inconel 600
working group that is trying to formulate plans to do various inspections much
earlier on some of the plants than would have been done otherwise.
		So, yes, I would say we have learned the direct impact on
license renewal is not there.  But it is on current plants.
		COMMISSIONER DICUS:  Okay.  And then, finally, what would you
list as the one or two or the main reason that there has been this apparent
turnaround that licensees -- perhaps most, if not all -- will come in for
license renewal?  What's the environment that has created that?
		MR. TUCKMAN:  Several things.  The economics, the performance of
the plants has dramatically improved -- dramatically improved.  The economics,
therefore, have improved on the plants that we presently have.
		Quite frankly, without trying to sound self-serving, the
stability of the Commission and the way the NRC is dealing with the industry
goes a long way to providing faith for the operation of the plants.  That
doesn't mean that you won't act when you need to act, and I don't want to
allude to that fact.  
		But what I am saying is the stability this Commission has put on
things like license renewal and the way the oversight process -- all those
things have made nuclear much more viable than it has been in the past.
		The success of license renewal -- there were very few folks --
we used to have license renewal meetings in the industry, and you'd have six
people attend.  We have a lot of people attend those meetings today.  It's the
happy club.  So those are some of the factors.
		COMMISSIONER DICUS:  Okay.  This is a good news day, I guess. 
Okay.  
		Thank you, Mr. Chairman.
		CHAIRMAN MESERVE:  Commissioner McGaffigan?
		COMMISSIONER McGAFFIGAN:  I'm not going to linger on this
control drive mechanism issue either, except you all are planning to replace
the heads, aren't you, at Oconee?  Is that the case?
		MR. TUCKMAN:  Yes, sir.  I'll replace them in 2003 and '04.
		COMMISSIONER McGAFFIGAN:  Does the fact that you have a 20-year
additional period to amortize whatever cost, is that something that makes it
easier to make that sort of decision?  Or would you have done it even if you
had --
		MR. TUCKMAN:  Let me comment in general about capital
expenditures.  Because I have license renewal at our Oconee plant, I am
replacing steam generators and spending an additional $500 million on the plant
in capital improvements to assure its reliability for the long term.
		If I -- reactor vessel heads, I have probably spent more money
in the repair of reactor vessel heads than I would have spent had I already had
new ones.  I just didn't have them in the warehouse.  But it does make all
capital decisions on a plant much easier, when you know you have another 33
years to go.
		COMMISSIONER McGAFFIGAN:  Going back to the question I asked the
staff, maybe you're comfortable with this situation.  We have this de facto --
in the NEI 95-10, Rev. 3, in our Reg. Guide, we now say, while it's not
required by the rule, people should think about submitting the results of their
scoping process when they submit their application.
		And ACRS had written a letter saying we should think about
requiring it, which apparently we once did in the license renewal rule, circa
the early '90s.  Then, we take it out of the rule, and we put it back in
guidance, and everybody is following it.  If everybody is comfortable with
that, I'm comfortable I guess.
		But is the de facto situation, as you understand it, somebody
who has just submitted two applications today, that you had best include the
results of the scoping analysis in order to -- 
		MR. TUCKMAN:  It's something you have --
		COMMISSIONER McGAFFIGAN:  -- facilitate the staff review?
		MR. TUCKMAN:  It's something you have to do.  It's unreasonable
to expect that the staff would not ask questions about scoping.  So you just go
ahead and put it in there, and it doesn't cost anything.
		COMMISSIONER McGAFFIGAN:  Okay.  I guess it's one of these
unwritten rules, and I should just let it be.  Having heard this discussion
today, if everybody is satisfied with the situation as it is, and it's
functioning, maybe I'll just let it go.
		MR. TUCKMAN:  Nobody has complained about doing it.
		COMMISSIONER McGAFFIGAN:  Nobody has complained about doing it. 
So ACRS will be happy, the staff will be happy, you all -- okay.  I quit.
		(Laughter.)
		Thank you.  I join Commissioner Merrifield and the other
Commissioners in commending the industry for the work that it has done to meet
us more than halfway in getting all of this process in place.  And now the
proof will be in the classes of 2001, 2002, 2003, and '04, whether we can get
it all done.
		MR. TUCKMAN:  I can hardly wait to renew Oconee's license again.
		(Laughter.)
		CHAIRMAN MESERVE:  Mr. Tuckman, thank you for joining us.  Very
much appreciate it.
		MR. TUCKMAN:  Thank you.
		CHAIRMAN MESERVE:  This is an impressive achievement by both the
staff and the industry.  It's a good day.  
		With that, we're adjourned.
		(Whereupon, at 3:06 p.m., the proceedings in the foregoing
matter went off the record.)