Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
0 |
11/05/2007 |
FEED PUMP MAINTENANCE |
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
0 |
10/13/2007 |
REFUELING OUTAGE |
|
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
SWITCH YARD WORK - HIGH REACTOR TRIP RISK |
* |
|
Millstone 3 |
100 |
|
SWITCH YARD WORK - HIGH REACTOR TRIP RISK |
* |
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
0 |
11/03/2007 |
MAINTENANCE OUTAGE, DRYWELL HEAD OFF |
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
STARTUP SOURCE 343 OOS FOR TEST |
|
|
Peach Bottom 3 |
100 |
|
STARTUP SOURCE 343 OOS FOR TEST |
|
|
Pilgrim 1 |
100 |
|
LINE 342 AT PARTIAL CAPACITY - IF OTHER 345KV LINE IS LOST ISO WILL REQUEST REDUCTION TO 500 MWE |
* |
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY |
|
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Three Mile Island 1 |
0 |
10/21/2007 |
REFUELING OUTAGE |
|
|
Vermont Yankee |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
95 |
|
HOLDING POWER FOR FUEL PRE-CONDITIONING |
* |
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
83 |
|
INCREASING POWER |
* |
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
0 |
10/28/2007 |
REFUELING OUTAGE |
|
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
0 |
09/29/2007 |
REFUELING OUTAGE |
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
94 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
75 |
|
DOWNPOWER MANEUVER IN PROGRESS TO APPROX 65% FOR POWER SUPPRESSION TESTING |
* |
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
* |
|
Prairie Island 1 |
100 |
|
345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK |
|
|
Prairie Island 2 |
100 |
|
345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK |
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|