Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
95 |
|
REDUCED FOR MFW PUMP SWAP
345 KV LINE AND BUS 9 OOS ON 3/4/07 |
* |
|
Braidwood 2 |
100 |
|
345 KV LINE AND BUS 9 OOS ON 3/4/07 |
* |
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
55 |
|
INCREASING POWER FOLLOWING MAINTENANCE ON EXTRACTION STEAM LEAK |
* |
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
0 |
02/04/2007 |
REFUELING OUTAGE |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
0 |
02/27/2007 |
REACTOR TRIP. SEE EN #43196. |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
0 |
02/25/2007 |
REFUELING OUTAGE |
|
|
Monticello |
100 |
|
|
|
|
Palisades |
0 |
02/26/2007 |
MAINTENANCE OUTAGE |
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Prairie Island 2 |
0 |
02/28/2007 |
MAINTENANCE OUTAGE - 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|