|
|
|
The purposes of the survey are to collect information and produce periodic reports about the operational status of U.S. natural gas processing plants to improve public understanding of their production capacities and operating levels as well as to monitor constraints resulting from natural gas supply emergencies. The survey consists of Schedule A ??Baseline Report,?? a census which will be used to collect baseline operational information on all U.S. natural gas processing plants. Schedule A will collect as frequently as every three years and the information will be used for periodic reports on the plants as well as to develop the survey frame for Schedule B ??Emergency Status Report??. In the event of a natural gas supply emergency, Schedule B will collect information about operating levels, damage and recovery of operations. |
Form #:
EIA- 757
Agency:
Department of Energy
Bureau:
Energy Information Administration
Common Name:
Natural Gas Processing Plant Survey
|
|
|
TYPE |
PAGES |
SIZE (KB) |
CAPABILITY |
WHAT'S NEEDED |
|
Form Only
|
|
71
|
[4] Fillable + Fileable
|
Adobe Reader
Download
|
|
|
|
If you do not find the form you need in the E-Forms Catalog we suggest:
|
Search through the
Agency Forms links.
Search
USA.gov, a connection to the U.S. Government's information and services.
Search GSA (GS),
Standard (SF) and
Optional (OF) Forms, the General
Services Administration's library for GSA internal forms and government-wide Standard and Optional Forms.
|
|