Reed College - Docket
No. 050-288
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-08-339
Reed College (Non-Power Reactor)
|
NOV
(SL III) |
12/19/2008 |
On December 19, 2008, a Notice of Violation was issued for a Severity Level III violation. Specifically, the facility was operated at a power level in excess of the licensed full power limit of 250 kW for approximately 70 minutes, which is in violation of their Technical Specifications. This event was caused by a disagreement between the indicated and calculated power due to the installation of a new fuel element into the core. |
River Bend 1 - Docket
No. 050-00458
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-03-077
River Bend 1 |
NOV
(White) |
12/29/2003 |
On December 29, 2003, a Notice of Violation was issued for a violation
associated with a White SDP finding involving a loss of feedwater
flow to the reactor. The violation cited the licensee’s failure
to lock open the Condensate Prefilter Vessel Bypass Flow Control
Valve as required by their Technical Specifications. |
EA-02-036
River Bend 1 |
NOV
(White) |
07/31/2002 |
On July 31, 2002, a Notice of Violation was issue for a violation
associated with a white SDP finding involving emergency planning standards.
The violation cited that the licensee's emergency plan was not adequate
to assure that information was made available to members of the public
using River Bend Station's owner controlled area regarding how members
of the public would be notified of an evacuation order and what their
initial actions should be in an emergency. |
EA-99-158
River Bend 1 |
NOV
(SL III) |
10/05/1999 |
Inadequate work instructions for the emergency diesel generator
fuel booster pump that rendered the generator inoperable. |
EA-98-478
River Bend 1 |
NOVCP
(SL III)
$ 55,000 |
02/01/1999 |
Violations relate to a design deficiency in the Division I and II
emergency diesel generators (EDGs) at the River Bend Station. |
EA-98-132
River Bend 1 |
NOVCP
(SL III)
$ 55,000 |
01/05/1999 |
Deliberately provided an NRC inspector with information that was
incomplete and inaccurate. |
EA-97-497
River Bend 1 |
NOVCP
(SL III)
$ 55,000 |
12/23/1997 |
Inadvertent mode change. |
EA-96-329
River Bend 1 |
NOV
(SL III) |
11/07/1996 |
Six violations of Technical Specification surveillance requirements. |
Robinson 2 - Docket No.
050-00261
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-04-028
Robinson 2 |
NOVCP
(SL II)
$88,000 |
04/07/2004 |
On April 7, 2004, a Notice of Violation and Proposed Imposition
of Civil Penalty in the amount of $88,000 was issued for a Severity
Level II violation for discriminating against the former Corporate
Superintendent of Site Access Authorization for Carolina Power & Light
for raising safety concerns |
EA-98-050
Robinson 2 |
NOV
(SL III) |
03/04/1998 |
Safety injection pumps outside design basis due to NPSH deficiencies. |
EA-97-490
Robinson 2 |
NOVCP
(SL III)
$ 55,000 |
12/12/1997 |
EDG inoperability |
EA-96-120
Robinson 2 |
NOV
(SL III) |
05/16/1996 |
Failure to secure safeguards information. |
|