Search Options | ||||
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us |
[ Next | Top of file ]
Manuscript Completed: November 1997
Date Published:
November 1997
Reporting Period: April 1, 1997-September 30,
1997
Office of the Inspector General
U.S. Nuclear Regulatory Commission
Washington, DC 20555
[ Prev | Next | Top of file ]
I am pleased to submit the Office of Inspector General's (OIG's) Semiannual Report to the U.S. Congress, which covers significant OIG activities during the period of April 1, 1997, through September 30, 1997. This report complies with Section 5 of the Inspector General Act of 1978, as amended.
During this reporting period, our office completed five performance and financial audits, and two special evaluations addressing the Nuclear Regulatory Commission's (NRC's) programs. We also analyzed 21 contract audit reports issued by the Defense Contract Audit Agency. The contract audit work resulted in questioning $131,329 in costs and identifying an additional $32,513 as funds that could be put to better use. As a result of the audit work, we made 11 recommendations and suggestions to NRC management. During this period, 30 investigations and 4 event inquiries were completed.
In carrying out the OIG's oversight responsibilities, we appreciate the cooperation and consideration extended by you and NRC management at all levels. We look forward to continuing our work with you and the entire NRC staff as we address the opportunities and challenges facing the Agency.
Sincerely,
Hubert T. Bell
Inspector General
[ Prev | Next | Top of file ]
The Inspector General Act of 1978, as amended (1988), specifies reporting requirements for semiannual reports. The requirements are listed and indexed to their applicable pages.
Citation | Reporting Requirements |
---|---|
Section 4(a)(2) | Review of Legislation and Regulations |
Section 5(a)(1) | Significant Problems, Abuses, and Deficiencies |
Section 5(a)(2) | Significant Recommendations for Corrective Action |
Section 5(a)(3) | Prior Significant Recommendations Not Yet Completed |
Section 5(a)(4) | Matters Referred to Prosecutive Authorities |
Section 5(a)(5) | Information or Assistance Refused |
Section 5(a)(6) | Listing of Audit Reports |
Section 5(a)(7) | Summary of Significant Reports |
Section 5(a)(8) | Audit Reports - Questioned Costs |
Section 5(a)(9) | Audit Reports - Funds Put to Better Use |
Section 5(a)(10) | Audit Reports Issued Before Commencement of the Reporting Period for Which No Management Decision Has Been Made |
Section 5(a)(11) | Significant Revised Management Decisions |
Section 5(a)(12) | Significant Management Decisions With Which OIG Disagreed |
[ Prev | Next | Top of file ]
The following two sections highlight selected audits and investigations completed during this reporting period. More detailed summaries appear in subsequent sections of this report.
[ Prev | Next | Top of file ]
| The NRC initiated a number of actions to address regulatory weaknesses. The OIG found that some of these actions may not produce a safety benefit commensurate with their cost. The OIG also found that meanings of several important regulatory terms are unclear to many NRC and licensee staff. The OIG believes a comprehensive, integrated plan could help focus agency resources on those issues with the most safety significance, and that a focus on plant safety will enhance the NRC's credibility as an effective regulator. | |
| Because of its wide-ranging potential impact, the OIG has been tracking the Year 2000 issue for some time. The OIG found that success of the NRC's Year 2000 program can be enhanced by: | |
| issuing a policy directive | |
| establishing and communicating the NRC's responsibilities with respect to licensees' actions to address Year 2000 problems | |
| ensuring that managers consider the impact of Year 2000 problems when assessing program risk. | |
| In response to a memorandum from the NRC Chairman, the Acting Chief Financial Officer proposed an approach to developing an agency-wide, integrated financial management system. The OIG initiated an evaluation to identify and gain an understanding of the best practices for developing such a system, and found that successful projects typically include: | |
| ensuring top level commitment and involvement | |
| learning from the experiences of others | |
| minimizing software modifications | |
| establishing realistic milestones and cost estimates. | |
Because this system will have agency-wide financial management implications, the OIG will continue to monitor its development and implementation. | ||
| The NRC sponsors a Federally Funded Research and Development Center (FFRDC) called the Center for Nuclear Waste Regulatory Analyses, which provides the NRC with long-term technical assistance and research related to the High-Level Waste program. The Federal Acquisition Regulation (FAR) requires that, prior to extending the contract for an FFRDC, sponsors conduct a comprehensive review of their use and need. The OIG found that the draft renewal justification assesses some, but not all, of the FAR considerations. |
[ Prev | Next | Top of file ]
| The OIG obtained information that a number of NRC employees accepted a dinner that was paid for by several top companies in the nuclear industry. Upon investigating the incident, the OIG determined that several NRC employees attended social events during a conference sponsored by nuclear vendors, which violated Federal ethics regulations pertaining to the unauthorized acceptance of gifts. |
| The OIG investigated an NRC contractor for a potential organizational conflict of interest and determined that the contractor violated the "work for others" clause in its contract with the NRC by performing similar work for a corporation. The OIG also determined that an official of the contractor made a false statement when he signed the organizational conflict of interest certification in a proposal for a task order under the NRC contract. The matter was referred to the Department of Justice and prosecution was declined. |
| The OIG investigated a number of allegations related to an NRC-led Independent Safety Assessment (ISA) of the Maine Yankee Atomic Power Station. These allegations called into question certain actions taken by the Governor of Maine and NRC staff members regarding the handling of the ISA and their interactions with the public-at-large. The OIG found no evidence of individual wrongdoing or inappropriate actions by NRC officials. However, the OIG determined that the public was afforded insufficient time to review the ISA findings prior to a scheduled public meeting to discuss them. |
| The OIG received an allegation that an inspection of a security breach at the Millstone Nuclear Power Station conducted by the NRC's Region I office was inadequate. The OIG determined that Region I inspectors did not inquire into apparent problems with the Millstone security system, which may have contributed to an unauthorized access incident. The OIG also determined that an inspection report prepared by the NRC regarding the incident was misleading as to the work actually performed. |
| The OIG investigated an NRC employee for conducting a real estate business on government time. The OIG determined that the employee was a licensed broker whose business answering machine message referred callers to his NRC telephone number. The employee resigned from the government while administrative action by the NRC was pending. |
| The OIG investigated an NRC employee for possible misuse of an American Express government credit card. The OIG determined that the employee used the government credit card to make a number of unauthorized withdrawals from Automated Teller Machines (ATMs), including several from ATMs in Atlantic City, New Jersey. The employee was suspended without pay. |
| Based on an inquiry by Congressman Newt Gingrich, the OIG conducted an investigation of the use of frequent flyer benefits by a number of former and current NRC executives. The OIG had previously investigated a number of the former executives for alleged frequent flyer abuse and found that two of them had accumulated substantial frequent flyer miles due to official government travel. The OIG did not develop any evidence that a current employee named in the Congressional inquiry had abused frequent flyer miles. |
[ Prev | Next | Top of file ]
The U.S. Nuclear Regulatory Commission (NRC) was established as an independent Federal agency by the Energy Reorganization Act of 1974, as amended. This act, along with the Atomic Energy Act of 1954, as amended, provides the framework for regulating the Nation's commercial nuclear power industry and use of nuclear materials.
The NRC's mission is to regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. The NRC's scope of responsibility includes regulation of commercial nuclear power plants; research, test, and training reactors; fuel cycle facilities; medical, academic, and industrial uses of nuclear materials; and the transport, storage, and disposal of nuclear materials and waste.
The NRC adheres to the following Principles of Good Regulation:
| Independence - Nothing but the highest possible standards of ethical performance and professionalism should influence regulation. |
| Openness - Nuclear regulation is the public's business, and it must be transacted publicly and candidly. |
| Efficiency - The American taxpayer, the rate-paying consumer, and licensees are all entitled to the best possible management and administration of regulatory activities. |
| Clarity - Regulations should be coherent, logical, and practical. |
| Reliability - Regulations should be based on the best available knowledge from research and operational experience. |
The NRC's Fiscal Year 1997 (FY97) budget is approximately $476.8 million, which includes the OIG's budget of $5 million. The NRC is relatively unique among Federal agencies because it is required by the Omnibus Budget Reconciliation Act of 1990 to recover approximately 100 percent of its budget authority. Therefore, the agency must employ sound financial practices to fully comply with its legislative mandates. The OIG's financial audits help the agency to meet these objectives. In FY96, the NRC was appropriated approximately $473 million, of which $11 million was derived from the Nuclear Waste Fund. Of the remaining $462 million, the NRC collected 98% through fees and other charges.
[ Prev | Next | Top of file ]
The Inspector General Act of 1978 created independent and objective units in Federal agencies to:
| conduct and supervise audits and investigations relating to programs and operations | |
| provide leadership and coordination, and recommend policies for activities designed to: | |
| promote economy, efficiency, and effectiveness in the administration of programs and operations | |
| prevent and detect fraud and abuse in such programs and operations | |
| provide a means for keeping the head of the agency and Congress fully and currently informed about problems and deficiencies. | |
These units, called Offices of Inspector General (OIGs), are required to: | ||
| perform comprehensive audits of programs, operations, grantees, and contractors of the agency | |
| conduct criminal, civil, and administrative investigations of those individuals and entities that may have engaged in fraud or otherwise violated laws and regulations designed to ensure and protect the government's programs, beneficiaries, and taxpayers. |
The NRC OIG, established in 1988 by an amendment to the Inspector General Act, accomplishes its mission by performing audits, special evaluations, investigations, and event inquiries.
The OIG's audit staff conducts performance and financial audits, as well as special evaluations. Performance audits focus on NRC administrative and program operations. Financial audits review the NRC's internal control systems, transaction processing, and financial systems. The OIG conducts special evaluations to examine the implications of NRC programs that affect national issues.
The OIG's investigative staff conducts investigations and event inquiries. The staff investigates violations of law or misconduct by NRC employees and contractors, and allegations of fraud, waste, or abuse affecting NRC programs and operations. An event inquiry is an investigative report documenting the examination of events or agency actions that do not focus specifically on individual misconduct. These reports identify institutional weaknesses that led to or allowed a problem to occur.
The OIG's Counsel reviews existing and proposed legislation, regulations, and policies to provide the NRC with a regulatory commentary that documents an objective analysis of vulnerabilities created within agency programs and operations. The intent of these reviews is to prospectively identify and assist the agency in preventing problems.
The OIG shares in the NRC's responsibility to provide adequate assurance to the public for the protection of its health and safety in the commercial use of nuclear materials and in the operation of nuclear facilities. The OIG assists the agency by assessing and reporting on the NRC's efforts to ensure that its safety-related programs are operating effectively.
Of additional importance is the NRC's responsibility for ensuring that individuals who identify nuclear safety concerns regarding the use of nuclear materials do not suffer adverse job actions as a result of reporting these concerns. The OIG continually evaluates the NRC's efforts to combat this type of unlawful discrimination.
[ Prev | Next | Top of file ]
To help the agency improve its effectiveness, the OIG completed 5 performance and financial audits, 2 special evaluations, and analyzed 21 contract audit reports issued by the Defense Contract Audit Agency (DCAA). The audits and special evaluations resulted in 11 recommendations and suggestions to NRC managers.
[ Prev | Next | Top of file ]
In 1993, the NRC became aware of engineering practices by a licensee that were outside the design basis of the plant and a violation of its operating license. In response, the agency conducted inspections and reviews that identified numerous other issues of concern regarding licensed activities and regulatory compliance. In 1995, the NRC received allegations of improprieties at another nuclear plant while it was shut down for refueling. The OIG also found that the meaning of important regulatory terms are unclear to many NRC and licensee staff. Prompted by these events, issues identified in related OIG reports, and other internal reviews, the NRC initiated a number of actions to address regulatory weaknesses.
The NRC has taken a number of actions, and has plans for more, related to enforcing strict compliance with regulatory requirements that have large resource costs to both the agency and the industry. The OIG found that some of these actions may not produce a safety benefit commensurate with their cost to the agency to enforce, and to the industry to implement.
The OIG believes that the NRC needs to recognize that the cost to verify compliance with regulatory requirements may not produce commensurate safety benefits. The OIG issued an audit report that recommended that the agency establish a comprehensive, integrated plan to resolve regulatory issues which could be used to guide the agency in focusing resources on those issues with the most safety significance. The report also suggested that, as part of this plan, the NRC needs to clearly articulate how it will meet its goal of moving to a risk-informed, performance-based regulatory system while maintaining regulatory standards. The OIG believes that a focus on plant safety will enhance the NRC's credibility as an effective regulator.
The Year 2000 problem has gained enormous attention in the information systems world because it involves the method that dates are recorded and utilized in many computer systems and a variety of other devices such as security systems, elevators, and phone systems. Due to its wide-ranging potential impact and recent emphasis from other Federal agencies, the OIG has been tracking this issue for some time.
The OIG provided a briefing to the NRC Chief Information Officer and other senior managers on this topic and issued a Special Evaluation Report containing several suggestions for facilitating the agency's Year 2000 efforts. For example, the report stated that the NRC can provide greater assurance that its Year 2000 program will be successful by:
| issuing a policy directive in support of the program |
| establishing and communicating a position on the extent of the NRC's regulatory responsibilities with respect to licensees' actions to address Year 2000 problems |
| ensuring that managers consider the potential impact of Year 2000 problems when assessing program risk as part of their Federal Managers' Financial Integrity Act requirements, and account for Year 2000 issues in their management control plans and reasonable assurance statements. |
The Federal Managers' Financial Integrity Act (FMFIA) requires Federal managers to establish a continuous process for evaluating, improving, and reporting on the internal controls and accounting systems for which they are responsible. The FMFIA also requires submitting a report to the President and Congress on the status of the management controls and financial systems that protect the integrity of agency programs and administrative activities. To assist the NRC in evaluating its management control program, the OIG annually reviews the NRC's program.
Overall, the OIG found that the NRC has complied with the requirements of the FMFIA during FY96. Although the OIG's work did not identify any material weaknesses in FY96, the former Executive Director for Operations identified the adequacy of the NRC's program to ensure licensees' compliance with certain regulatory requirements as a potential material weakness. The NRC preliminarily determined that the concern was not a material weakness; however, the agency is evaluating the need for additional action. The OIG advised the NRC that it will continue monitoring the agency's actions on this issue.
Since October 1987, the NRC has sponsored a Federally Funded Research and Development Center (FFRDC), called the Center for Nuclear Waste Regulatory Analyses (the Center). The Center provides the NRC with long-term technical assistance and research related to the High-Level Waste (HLW) program under the Nuclear Waste Policy Act of 1982, as amended. The Federal Acquisition Regulation (FAR) requires that, prior to extending the contract for an FFRDC, sponsors conduct a comprehensive review of the use of and need for their FFRDCs.
NRC staff developed an interim plan for performing its FFRDC renewal justification, implemented that plan, and drafted a renewal justification. The OIG reviewed the NRC's draft renewal justification and found it did not provide the Commission with sufficient information on which to make its judgment because:
| assumptions used by the staff in drawing conclusions were not identified |
| an Office of the Controller cost comparison referenced by the staff did not reflect the current environment affecting the HLW program. |
The OIG made a recommendation in its report to address the issues identified.
The OIG previously reported on contract management problems regarding the M-Cubed Information Systems, Inc. contract, and identified lessons the agency could learn to more effectively develop systems and oversee contracts. Because of continuing concerns about the M-Cubed contract, the OIG initiated a further review of M-Cubed's work on the inspection planning module of the Reactor Program System (RPS).
The OIG found that the agency's best interests were not served in continuing work on the RPS using M-Cubed as a subcontractor to Applied Management Systems, Inc. (AMS). NRC managers expected that the agency would benefit from AMS' oversight; however, little, if any, benefit was gained. As a result, agency resources were not effectively managed, and the NRC incurred an additional cost in the form of the fee paid to AMS. To improve the NRC's management of contracts for developing agency systems and more effectively serve the agency's interests, the OIG report recommends that the various NRC offices reach better agreement and coordination in determining how to best serve NRC's interests.
In a February 1997 memorandum, the NRC Chairman directed the Acting Chief Financial Officer to develop a plan for establishing an agency-wide financial management system. The Chairman stated that the new system should:
| be operational within the next two years |
| be designed to integrate financial planning data with performance data |
| have the goal of eliminating the need for multiple financial tracking systems. |
In response, the Acting Chief Financial Officer proposed an approach to developing an integrated financial management system.
Due to the importance of this project and the NRC's past difficulties in developing management information systems, the OIG initiated an evaluation to gain an understanding of the best practices for developing such a system. The OIG provided a briefing to senior agency managers on the results of the evaluation, and issued a Special Evaluation Report that identified several factors that contribute to project success, including:
| ensuring top level commitment and involvement |
| learning from the experiences of others |
| minimizing software modifications |
| establishing realistic milestones and cost estimates. |
Because this system will have agency-wide financial management implications, the OIG will continue to monitor its development and implementation.
The Office of Management and Budget Circular A-50, "Audit Follow-up," requires each agency to establish systems to assure the prompt and proper resolution and implementation of audit recommendations. These systems should provide for a complete record of actions taken on all recommendations. The OIG reviewed the adequacy of the NRC's current directive for responding to OIG audit reports and for reaching resolution on recommendations.
Although the agency maintains a centralized tracking system, the OIG found that, due to recent organizational changes made by the Commission, Management Directive 6.1 needed updating. Accordingly, the OIG recommended that it be revised to identify the NRC officials responsible for reviewing and responding to OIG draft audit reports, and resolving disagreements on audit recommendations that arise between the OIG and agency officials.
[ Prev | Next | Top of file ]
In 1994, Congress directed the NRC and the Environmental Protection Agency to develop a plan to address the inconsistencies, gaps, and overlaps in current Federal radiation protection standards. The objective of this OIG survey is to determine the progress the two agencies have made in responding to congressional requests for agencies to establish consistent radiation standards for decommissioning activities.
The OIG initiated a Special Evaluation to assess the current safety culture and climate of the agency's work force. The OIG is currently working with an independent contractor experienced in measuring organizational cultures and climates to develop a methodology to complete this survey.
The NRC recently assumed regulatory responsibility for two gaseous diffusion plants located near Piketon, Ohio and Paducah, Kentucky. These facilities prepare uranium so that it can be used as fuel in nuclear power reactors.
The objective of an OIG survey of these plants is to gain an understanding of the NRC's processes and management controls for regulating the plants, and the agency's working relationships with other Federal agencies involved.
The Chief Financial Officers Act of 1990 requires that the NRC issue audited financial statements annually. The OIG's objective for this audit is to render an opinion on whether the FY97 financial statements fairly present the agency's financial position. The OIG also reports on NRC management's assertion about the effectiveness of internal controls, and NRC's compliance with applicable laws and regulations.
The Office of Nuclear Reactor Regulation (NRR) has established a project manager function to assist in licensing and monitoring nuclear power plants. This audit examines the processes and guidance that the NRR has developed regarding tasks assigned to or involving project managers.
The NRC performs a wide variety of administrative and information management activities in support of its mission. The objectives of this OIG survey are to determine the nature, reasons, and costs for the services and to identify areas for additional review.
[ Prev | Next | Top of file ]
The Nuclear Waste Policy Act of 1982 requires that the NRC approve or disapprove the construction of a high-level waste repository within three to four years of receiving a Department of Energy (DOE) construction license application. To meet this deadline, the NRC enacted a rule requiring the development of an electronic information management system (or the Licensing Support System) to reduce the time needed for discovery during the license hearing process. The rule requires that the DOE design and develop the system, and that the NRC operate and maintain it.
In March 1995, the OIG issued a report entitled, NRC Needs to Provide Strong Direction for the Licensing Support System (LSS), which stated that the program had stalled over the past five years. Many delays were attributed to an inadequate system definition and disagreement between the DOE and the NRC regarding the roles and responsibilities of each agency. As a result, the OIG recommended that the NRC obtain a formal commitment from the DOE in an interagency agreement or Memorandum of Understanding (MOU) on key aspects of the LSS. In response, the Executive Director for Operations (EDO) appointed a Senior Management Team (SMT) to reevaluate the purpose and need for the LSS and to address the issues raised by the OIG audit.
In status reports issued in 1996, the EDO advised the Commission that the SMT would develop an action plan addressing the issues affecting the LSS program. However, due to Congressional budget action related to the DOE's high-level nuclear waste program, there was no resumption of any LSS activities and the DOE's LSS-related activities remained stalled, including the finalization of an MOU with the NRC. The EDO also provided an SMT action plan to address outstanding LSS issues, which subsequently was revised to reevaluate the need for an LSS as originally envisioned.
This reevaluation has been ongoing since November 1996. The SMT recommended an option that it believes "provides the best solution for maintaining the basic functionality of the LSS conceptual design, while most flexibly accommodating current and future technological developments."
To bring about the SMT's recommended changes to the LSS, a revised rule is required. As such, in July 1997, the SMT provided a proposed revised rule to the Commission for approval. The proposed revised rule eliminates the current prescriptive requirement in the existing rule for a centralized LSS administered by the NRC. As such, it also eliminates the requirement for an LSS Administrator. The proposed rule also requires that all potential parties, including the NRC and the DOE, must make their documentary material available in electronic form to all other participants beginning in the pre-application phase.
In September 1997, the Commission approved the revised rule with comments and directed the SMT to incorporate the comments and submit the proposed rule for publication in the Federal Register and for public comment. If this rule is adopted, the OIG will close out this audit recommendation.
[ Prev | Next | Top of file ]
During this reporting period, the OIG received 247 allegations, initiated 49 investigations and 5 event inquiries, and closed 30 cases and 4 event inquiries. In addition, 52 referrals were made to NRC management.
[ Prev | Next | Top of file ]
The Hartford Courant ran a story in December 1996 indicating that a number of NRC employees attended a conference at a Florida beach resort sponsored by the American Nuclear Society (ANS). The newspaper article further indicated that several NRC employees at the Conference accepted a dinner that was paid for by several top companies in the nuclear industry.
The OIG investigation disclosed that an NRC executive accepted free conference registration in exchange for his speaking and participation in the conference. The acceptance of free conference registration was permissible under 5 C.F.R. ยง2635.204(g)(1) of the Federal ethics regulations as an item received incident to a speaking engagement. The executive's participation at the event could be viewed as a customary and necessary part of his performance as a senior NRC official, and his acceptance of free conference registration did not constitute a gift to him or to the agency.
The investigation further disclosed that three NRC employees, including the executive, attended one or more social events that were sponsored by nuclear industry vendors during the ANS conference. These gatherings were open to all ANS conference attendees and their guests. However, the NRC employees attended these events without seeking the requisite agency approval as set forth in NRC Management Directive (MD) 7.9, "Ethics, Approvals and Waivers."
The NRC employees told the OIG that they were unaware of the agency's approval requirements contained in MD 7.9. They further stated that their supervisory chains, up to and including their office director, were aware of their possible attendance at the social events and did not advise them to request agency approval in accordance with MD 7.9. Because the market value of several of these events exceeded $20, all three employees violated Federal ethics regulations pertaining to the unauthorized acceptance of gifts.
As a result of this investigation, the NRC's Office of the General Counsel has advised the OIG that ethics presentations to all employees will include scenarios such as those addressed in this case.
The OIG received information that an NRC contractor, under contract to perform testing on industrial radiography devices, was simultaneously performing similar work for a private corporation. The OIG determined that the contractor violated the "work for other" clause in its contract with the government by performing similar work for the corporation while the NRC contract was still in effect.
The OIG also found that an official of the contractor made a false statement when he signed the organizational conflict of interest certification in the contractor's proposal for a task order under the NRC contract. The OIG determined that, at the time the official signed the certification, the contractor had ongoing related contracts with the private corporation. Further, the official did not inquire about the existence of any contracts that his company had that could have affected the accuracy of his certification to the NRC. The OIG referred the matter to the Department of Justice and prosecution was declined.
The OIG received allegations that the Governor of Maine appointed State members to an NRC-led Independent Safety Assessment Team (ISAT) to inappropriately influence an assessment of the Maine Yankee Atomic Power Station (MYAPS) and to obtain inside information on the NRC's assessment activities for the licensee. It was further alleged that the Citizen's Review Team (CRT) appointed by the Governor lacked the expertise to analyze the NRC's assessment activities.
Additionally, it was alleged that the NRC failed to adequately inform the public of the NRC's assessment findings and conclusions during a public meeting held after completion of the ISA. The alleger also questioned the accuracy of numerous public statements made by the Governor of Maine relating to the ISA, and suggested that NRC staff may have failed to provide the State with accurate information.
The OIG found no evidence that the ISAT findings or conclusions were inappropriately influenced by State of Maine ISAT members. Further, there was no indication that State of Maine representatives involved with the ISAT provided MYAPS personnel with information on the NRC's planned assessment activities. Additionally, the OIG found no evidence that NRC personnel provided State of Maine officials with inaccurate or misleading information relating to the ISA.
Although the OIG determined that the Governor's CRT lacked the technical expertise to analyze NRC's assessment activities, it was also determined that the CRT was not intended to provide the Governor with technical guidance. The CRT was appointed to assist the Governor in interpreting the NRC's assessment activities from different perspectives and to act as the Governor's "eyes and ears." The OIG concluded that, while NRC staff made efforts to advise members of the public of the ISAT findings prior to the public meeting, the public was nonetheless afforded insufficient time to review the report prior to the public meeting.
The OIG received an allegation that an inspection of a security breach at the Millstone Nuclear Power Station conducted by the NRC's Region I office was inadequate. The alleger claimed that two workers at the plant were fired for gaining unauthorized site access through a security turnstile. According to the alleger, the NRC failed to adequately review the incident and to address several serious lapses in the Millstone security system.
The OIG determined that Region I inspectors did not inquire into apparent problems with the Millstone security system that may have contributed to the unauthorized access incident. The OIG also determined that an NRC inspection report regarding the incident was misleading as to the work actually performed. Specifically, while a reading of the report gives the impression that NRC inspection activities resulted in the facts cited in the report, the OIG determined that there was no NRC inspection into this incident. The NRC inspection effort consisted only of documenting a telephone notification of the incident from the licensee, with no verification by Region I staff.
An NRC employee was investigated by the OIG for conducting a real estate business on government time. The OIG investigation determined that the employee was a licensed real estate broker and the sole owner and operator of a real estate business. The OIG further determined that a message on the employee's business answering machine referred callers to the employee's NRC telephone number. The OIG referred the matter to NRC management for consideration of administrative action, and the employee resigned from the government.
The OIG received information that an NRC employee was using an American Express (AmEx) Government Credit Card to make unauthorized cash withdrawals from Automated Teller Machines (ATMs). The OIG investigation disclosed that the employee made a number of unauthorized cash withdrawals, including several from ATMs in Atlantic City, New Jersey.
The OIG further determined that the employee provided inconsistent explanations to OIG, AmEx, and the NRC travel office regarding confusion between the employee's personal credit cards and the AmEx Government Credit Card. The OIG referred the matter to NRC management for consideration of administrative action, which resulted in the employee being suspended without pay.
Based on an inquiry from Congressman Newt Gingrich, the OIG conducted an investigation of the abuse of frequent flyer benefits by a number of former and current NRC executives. The OIG investigation determined that several of the former employees named in the Congressional inquiry were the subjects of previous OIG investigations into the alleged abuse of frequent flyer miles.
In one of the previous investigations, the OIG found that an individual arranged official government trips to coincide with personal business and failed to account for promotional airline mileage credits gained through official travel. In another earlier investigation involving a former employee, it was determined that the individual accumulated a substantial number of frequent flyer miles as a result of official travel; however, the employee never converted the frequent flyer miles to personal use. The OIG subsequently contacted this employee, who agreed not to convert the frequent flyer miles to personal use in the future.
The current OIG investigation revealed that the employee who is still with the NRC and named in the Congressional inquiry had not accrued sufficient frequent flyer miles from official travel to take advantage of frequent flyer program benefits.
[ Prev | Next | Top of file ]
Anonymous | 20 |
NRC Employee | 25 |
NRC Management | 71 |
Other Government Agency | 3 |
Intervenor | 8 |
General Public | 89 |
Media | 1 |
OIG Investigation/Audit | 2 |
Contractor | 8 |
Regulated Industry | 20 |
Of the 247 total allegations, none were forwarded from the previous period, and 31 resulted from hotline calls.
Closed Administratively | 95 |
Referred for OIG Investigation | 92 |
Referred for OIG Audit | 4 |
Referred to NRC Management & Staff | 52 |
Referred to External Agency | 3 |
Pending Review or Action | 1 |
DOJ Referrals | 7 |
Pending DOJ Action | 1 |
DOJ Declinations | 6 |
Indictments and Arrests | 1 |
Convictions | 0 |
PFCRA Referrals | 1 |
PFCRA Recoveries | $14,100 |
Other Recoveries | 0 |
NRC Administrative Actions: | |
Termination s and Resignations | 1 |
Suspensions and Demotions | 4 |
Other Administrative Actions | 11 |
Classification of Investigations | Carryover | Opened | Closed | In Progress |
---|---|---|---|---|
Conflict of Interest | 7 | 3 | 4 | 6 |
Internal Fraud | 3 | 2 | 1 | 4 |
External Fraud | 5 | 3 | 4 | 4 |
False Statements | 1 | 5 | 1 | 5 |
Theft | 2 | 2 | 2 | 2 |
Misuse of Government Property | 2 | 4 | 4 | 2 |
Employee Misconduct | 8 | 13 | 8 | 13 |
Management Misconduct | 6 | 12 | 3 | 15 |
Technical Allegations -- Other | 7 | 3 | 3 | 7 |
Whistleblower Reprisal | 2 | 2 | 0 | 4 |
Total Investigations | 43 | 49 | 30 | 62 |
Total Event Inquiries | 4 | 5 | 4 | 5 |
[ Prev | Next | Top of file ]
[ Prev | Next | Top of file ]
The Inspector General Act, 5 U.S.C. Section 4(a)(3), directs the Inspector General (IG) to conduct, supervise, and coordinate activities to promote economy and efficiency, and to prevent fraud and abuse in agency programs and operations. To proactively pursue the elimination of fraud and abuse within the agency, Hubert T. Bell, the NRC IG, embarked on three major initiatives during the last year.
The three initiatives described above have served to enhance the effectiveness of the OIG in combating fraud and abuse by fostering an environment of openness and instilling confidence in the integrity of the OIG's people and processes.
[ Prev | Next | Top of file ]
[ Prev | Next | Top of file ]
The Inspector General Act, 5 U.S.C. App 3, Section 4(a)(2), requires the OIG to review existing and proposed legislation and regulations, and to make recommendations concerning the impact of such legislation or regulations on the economy and efficiency of programs and operations administered by the agency.
From April 1, 1997, through September 30, 1997, the OIG reviewed more than 200 agency documents, including approximately 80 documents issued by the Office of the Secretary (SECYs) and 150 Federal Register Notices, regulatory actions, and statutes.
Regulatory Commentaries were provided on fraud, waste, and abuse issues to focus agency managers on the importance of considering aspects of policy and procedures that can be related to fraud, waste, and abuse prevention. The OIG initiated dialogue with the agency on several policy concerns, and collegial efforts resulted in improved guidance to the agency staff in other areas. Commentaries raising the most significant issues are summarized below.
Two of the commentaries discussed issues related to the protection and distribution of OIG documents. The first addressed document distribution under draft Management Directive 3.4, "Release of Information to the Public." The comments on this document provided a background and conclusion to an ongoing discussion with regard to treatment of OIG documents within the agency. In response to questions raised by the agency staff, the Assistant for Operations for the Executive Director for Operations issued a memorandum describing the protection to be afforded OIG documents. Subsequently, issues regarding proper disposal of OIG documents residing in agency program files were raised and resolved. Finally, in response to the OIG request in the commentary, the agency agreed to provide periodic announcements to safeguard OIG documents.
The second commentary related to OIG documents involving the draft Proposed Rule Amending 10 Code of Federal Regulations Part 9, Subpart A, the Freedom of Information Act (FOIA). In addition to addressing concerns regarding compliance with the Electronic Freedom of Information Act Amendments of 1996, the comments clarified the OIG's internal FOIA processing procedures and denial authority. In both instances, revisions were made to the draft documents after collegial discussion and agreement.
The OIG comments on a proposed NRC Inspection Manual chapter, called "Communication Protocol for Assessing Offsite Emergency Preparedness Following a Natural Disaster," expressed concern that the directions pertaining to restart authority needed clarification.
Another comment, regarding NUREG-0544, Rev. 4, "NRC's Collection of Abbreviations," emphasized the need for clarity. The OIG noted that there could be potential safety significance to having several identical abbreviations stand for very different meanings. The OIG included a suggestion that numbers could be added to the abbreviation letter symbols to avoid confusion.
[ Prev | Next | Top of file ]
On September 10, 1997, the sixth Annual OIG Information and Planning Conference was held at NRC Headquarters in Rockville, Maryland. The purpose of the conference was to assist the OIG in developing its work plan for FY98. The conference theme was "New Directions in Regulatory Effectiveness." The keynote speaker, Commissioner Nils J. Diaz, and the NRC's newly formed Executive Council addressed how the OIG could be of greater assistance to the agency.
The balance of the agenda included several speakers and panels from the NRC, industry, and other agencies. Topics addressed included:
| Issues and Initiatives --The Congressional Scene |
| Status and Issues -- Proposed Regulation of DOE Activities |
| Deregulation of the Energy Industry |
| Best Practices to Increase the Effectiveness and Efficiency of IGs. |
Following each presentation, the speakers entertained questions from the audience.
[ Prev | Next | Top of file ]
[ Prev | Next | Top of file ]
Date | Title | Number |
---|---|---|
03/31/97 | Review of NRC's Implementation of the Federal Managers' Financial Integrity Act for Fiscal Year 1996 |
OIG/96A-17 |
04/23/97 | Review of M-Cubed's Work on the Reactor Program System | OIG/97A-02 |
06/09/97 | Evaluation of Best Practices for Developing and Implementing Integrated Financial Management System |
OIG/97E-10 |
06/26/97 | Special Evaluation: NRC's Progress on the Year 2000 Issue | OIG/97E-13 |
07/11/97 | Review of NRC's Draft Renewal Justification to Continue the Federally Funded Research and Development Center |
OIG/97A-07 |
08/21/97 | NRC Needs Comprehensive Plan to Resolve Regulatory Issues |
OIG/97A-01 |
09/05/97 | Review of NRC's Management Directive 6.1 | OIG/97A-20 |
OIG Issue Date | Contractor/Contract Number | Questioned Costs | Funds Put to Better Use |
4/1/97 | Fauske and Associates, Inc. RS-RES-96-071 |
0 | 0 |
4/10/97 | Parameter, Inc. NRC-03-93-026 |
0 | 0 |
4/14/97 | Purdue Research Foundation/Scientech RS-RES-96-071 |
0 | $8,163 |
5/20/97 | University of Maryland/Scientech RS-RES-96-071 |
0 | 0 |
6/5/97 | Materials Engineering Associates, Inc. NRC-04-88-072 |
0 | 0 |
6/5/97 | Materials Engineering Associates, Inc. NRC-04-88-072 |
0 | 0 |
6/5/97 | Scientech, Inc. RS-RES-96-071 |
0 | $24,350 |
6/9/97 | Westinghouse Electric Corporation NRC-04-90-085 |
0 | 0 |
6/19/97 | Automation Management Consultants, Inc. NRC-39-88-230 |
$13,319 | 0 |
6/26/97 | Science and Engineering Associates, Inc. NRC-04-87-400 NRC-04-89-051 |
0 | 0 |
7/8/97 | Science Applications International Corp NRC-02-87-004 |
0 | 0 |
7/24/97 | Westinghouse Electric Corporation NRC-04-90-085 NRC-04-91-049 NRC-04-91-071 |
0 | 0 |
8/4/97 | Westinghouse Electric Corporation NRC-04-85-103 NRC-04-90-085 NRC-04-91-049 |
0 | 0 |
8/6/97 | I-NET, Incorporated NRC-33-91-219 NRC-33-92-340 |
0 | 0 |
9/17/97 | Advanced Systems Technology, Inc. NRC-04-91-047 |
0 | 0 |
9/22/97 | Maxima/Technassociates, Inc. NRC-33-86-266 |
$118,010 | 0 |
9/24/97 | The Pennsylvania State University RS-RES-96-071 |
0 | 0 |
9/29/97 | Comex Corporation NRC-03-93-026 NRC-03-93-036 NRC-26-93-290 |
0 | 0 |
9/30/97 | I-NET, Incorporated NRC-33-91-186 NRC-33-91-219 |
0 | 0 |
9/30/97 | Ruland Associates, Inc. NRC-33-95-173 NRC-33-95-184 |
0 | 0 |
9/30/97 | Science Applications International Corp. NRC-02-87-004 |
0 | 0 |
TOTALS | $131,329 | $32,513 |
[ Prev | Next | Top of file ]
During this reporting period, the OIG analyzed 21 contract audit reports issued by the DCAA. The following tables depict the cost savings from this work.
OIG Reports Containing Questioned Costs April 1, 1997 - September 30, 1997 | ||||
Reports | # of Reports | Questioned Costs ($) | Unsupported Costs ($) | |
---|---|---|---|---|
A. | For which no management decision has been made by the commencement of the reporting period | 0 | 0 | 0 |
B. | Which were issued during the reporting period | 2 | $131,329 | 0 |
Subtotal (A + B) | 2 | $131,329 | 0 | |
C. | For which a management decision was made during the reporting period: | |||
(i) dollar value of disallowed costs | 1 | $13,319 | 0 | |
(ii) dollar value of costs not disallowed | 0 | 0 | 0 | |
D. | For which no management decision had been made by the end of the reporting period | 1 | $118,010 | 0 |
E. | For which no management decision was made within 6 months of issuance | 0 | 0 | 0 |
OIG Reports Issued with Recommendations That Funds Be Put to Better Use April 1, 1997 - September 30, 1997 | |||
Reports | # of Reports | Dollar Value | |
---|---|---|---|
A. | For which no management decision has been made by the commencement of the reporting period | 0 | 0 |
B. | Which were issued during the reporting period | 5* | $32,513 |
Subtotal (A + B) | 5 | $32,513 | |
C. | For which a management decision was made during the reporting period: | ||
(i) dollar value of recommendations that were agreed to by management | 5 | $32,513 | |
(ii) dollar value of recommendations that were not agreed to by management | 0 | 0 | |
D. | For which no management decision had been made by the end of the reporting period | 0 | 0 |
E. | For which no management decision was made within 6 months of issuance | 0 | 0 |
* Three pre-award reports reported that zero funds were available for better use.
[ Prev | Next | Top of file ]
AIGA | Assistant Inspector General for Audits |
AIGI | Assistant Inspector General for Investigations |
AmEx | American Express |
AMS | Applied Management Systems, Inc. |
ANS | American Nuclear Society |
ATM | Automated Teller Machine |
CFR | Code of Federal Regulations |
CRT | Citizen's Review Team |
DCAA | U.S. Defense Contract Audit Agency |
DOE | U.S. Department of Energy |
DOJ | U.S. Department of Justice |
EDO | Executive Director for Operations |
EPA | Environmental Protection Agency |
FAR | Federal Acquisition Regulation |
FFRDC | Federally Funded Research and Development Center |
FMFIA | Federal Managers' Financial Integrity Act |
FOIA | Freedom of Information Act |
FY | Fiscal Year |
HLW | High-Level Waste |
IG | Inspector General |
ISA | Independent Safety Assessment |
ISAT | Independent Safety Assessment Team |
LSS | Licensing Support System |
MD | Management Directive |
Millstone | Millstone Nuclear Generating Station, Unit 1, New London County, CT |
MOU | Memorandum of Understanding |
MYAPS | Maine Yankee Atomic Power Station |
NRC | U.S. Nuclear Regulatory Commission |
NRR | Office of Nuclear Reactor Regulation |
OIG | NRC's Office of the Inspector General |
PFCRA | Program Fraud Civil Remedies Act |
RPS | Reactor Program System |
SECY | Office of the Secretary |
SMT | Senior Management Team |
USC | United States Code |
[ Prev | Next | Top of file ]
Event Inquiry
An event inquiry is an investigative product documenting the examination of events or agency actions that do not focus specifically on individual misconduct. These reports identify institutional weaknesses that led to or allowed a problem to occur. This type of investigative effort was previously referred to as an inspection.
Executive Council
As part of a management restructuring, the Commission formed an Executive Council to ensure integration of agency planning, budgeting, financial and human resource management, information technology, and programmatic decisions. The Executive Council is chaired by the Executive Director for Operations, and includes the Chief Information Officer and Chief Financial Officer.
Financial Audit
A financial audit assesses the effectiveness of internal control systems, transaction processing, financial systems, and contracts.
Funds Put to Better Use
Funds identified in audit recommendations that could be used more efficiently by avoiding unnecessary expenses.
Hotline
A toll-free telephone number (1-800-233-3497) for reporting incidents of possible fraud, waste, and abuse to the NRC Office of the Inspector General.
Management Decision
A final decision based on management's response to audit recommendations and findings.
Material Weakness
A specific instance of noncompliance with the FMFIA of sufficient importance to be reported to the President and the Congress. A weakness that would significantly impair the fulfillment of an agency component's mission; deprive the public of needed services; violate statutory or regulatory requirements; significantly weaken safeguards against waste, loss, unauthorized use, or misappropriation of funds, property, or other assets; or result in a conflict of interest.
Special Evaluation Report
An OIG audit report that examines the implications of NRC programs that affect national issues, such as high-level radioactive waste disposal, nuclear power plant decommissioning, or the use of radiation by the medical community in treating disease. Agency tracking of recommendations is not required.
Questioned Cost
A cost questioned as a result of an alleged violation of law, regulation, contract, or agreement governing the expenditure of funds (costs unsupported by adequate documentation or funds for a particular purpose that are unnecessary or unreasonable.)
[ Prev | Top of file ]
The OIG established a toll-free number (1-800-233-3497) to provide NRC employees, contractors, and others with direct access to OIG's Hotline Program. Hotline procedures and guidelines were carefully developed to ensure the confidentiality (unless totally unavoidable) of NRC employees wishing to report incidents of possible fraud, waste, and abuse within the NRC. Trained OIG staff are available to answer calls Monday through Friday, between 10:00 a.m. and 4:00 p.m. (eastern standard time).
Individuals may also provide information to hotline personnel by writing to the address below.
U.S. Nuclear Regulatory Commission
Office of the Inspector General
Hotline Program
Mail Stop T-5 D28
Washington, DC 20555-0001
HOTLINE NUMBER:
1-800-233-3497
[ Top of file ]
Privacy Policy |
Site Disclaimer |