The Honorable John T. Conway
Chairman
Defense Nuclear Facilities Safety Board
Dear Mr. Chairman:
The purpose of this letter is to inform you
of our progress toward implementing a cost effective solution to existing
deficiencies with the Old HB-Line facility ventilation system. �The letter to you regarding this issue was
sent
The automatic dampers have been installed in
the ventilation supply system and will be placed into service following
operational testing during the next available outage in October 2003. �The ventilation exhaust system replacement
project is entering the preliminary design phase and is expected to be baselined in early calendar year 2004. �Final design is expected to be complete by the
end of CY04.� Also, the contents of the
justification for Continued Operations document have been incorporated into the
Documented Safety Analysis (DSA). �The
revised DSA was approved in May 2003.
If you have any questions, please call me at
(202) 586-0738.
Sincerely
Pau1 M. Golan
Chief Operating Officer
Office of Environmental Management
cc: �Mark
Whitaker, DR- 1