Home > Nuclear
Reactors > Operating
Reactors > Operational
Experience > Fire
Protection > Fire-Induced
Circuit Faults > Related Documents
Related Documents About Fire-Induced Circuit
Faults
On this page:
Some links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS), and others are to documents
in Adobe Portable Document Format (PDF). ADAMS documents are provided in either
PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying
these formats, see our Plugins, Viewers, and
Other Tools page. If you have questions about search techniques or problems
with viewing or printing documents from ADAMS, please contact the Public
Document Room staff.
Fire Protection Steering Committee Meetings
Date |
Description |
06/03/2008 |
Summary of June 3, 2008, Meeting of the NRC Fire Protection
Steering Committee |
12/05/2007 |
Summary of December 5, 2007, Meeting of the NRC Fire Protection
Steering Committee |
10/17/2007 |
Summary of October 17,2007, Meeting of the NRC Fire Protection
Steering Committee |
Circuit Analysis Voluntary Initiative
Date |
Description |
12/31/2007 |
Memo to the Chairman: "Status of Actions to Resolve Potential
Safety Concerns from Multiple Fire-Induced Spurious Equipment
Operations" |
12/21/2007 |
Draft NEI 00-01, Revision 2, "Guidance for Post-Fire Shutdown
Analysis" |
01/28/2005 |
NEI 00-01, Revision 1, "Guidance for Post-Fire Safe Shutdown
Analysis" |
03/19/2004 |
NEI 04-06, Draft G, "Guidance for Self-Assessment of Circuit
Failure Issues" |
01/31/2004 |
Draft NUREG-1778, "Knowledge Base for Post-Fire Safe-Shutdown
Analysis" |
09/11/2003 |
NRC letter to NEI regarding NEI 00-01 |
05/22/2003 |
NEI 00-01, Revision 0, "Guidance for Post-Fire Safe Shutdown
Analysis" |
12/2002 |
Draft NUREG/CR, "Guidance for Post Fire Safe Shutdown
Analysis" |
10/15/2002 |
Draft Revision D of NEI 00-01, "Guidance for Post-Fire Safe
Shutdown Analysis" |
05/2002 |
EPRI Issues Results of Expert Elicitation "Spurious Activation
of Electrical Circuits Due To Cable Fires" (Report 1006961) |
03/06/2002 |
NRC Comments on Draft C to NEI for Resolution |
10/18/2001 |
NEI 00-01 Draft C to NRC for Review |
12/20/2000 |
Summary of Meeting with the Nuclear energy Institute (NEI)
on the Status of the NEI Risk-Informed Post-Fire Safe Shutdown
Circuit Analysis (Fire-Induced Circuit Failures) Methodology
Development Effort |
11/03/2000 |
Expert Elicitation Process Draft G (for evaluation of fire
test results on fire-induced circuit failures) |
10/03/2000 |
Notice of Meeting Between the Nuclear Regulatory Commission
(NRC) Staff and the Nuclear Energy Institute (NEI) |
10/03/2000 |
Summary of Meeting Between the Nuclear Regulatory Commission
(NRC) Staff and the Nuclear Energy Institute (NEI) on Fire Test
Protocols |
09/15/2000 |
Draft Preliminary Staff Comments on the Proposed Fire Test
Protocols |
09/14/2000 |
EPRI NEI Test Plan for Evaluation of Fire Induced Circuit Failures
Revision D |
2000 |
Transmittal of Staff Comments on a Fire Testing Proposal from
the Nuclear Energy Institute |
![(To top of page)](https://webarchive.library.unt.edu/eot2008/20090119050234im_/http://www.nrc.gov/images/navigation/go-top.gif)
Public Meetings
Date |
Description |
05/07/2008 |
Summary of May 7, 2008, Category 2 Meeting on fire-induced
circuit failures |
03/27/2008 |
Summary of March 27, 2008, Category 2 Meeting on fire-induced
circuit failures |
09/06/2007 |
Summary of 09/06/07 public meeting to discuss fire-induced
multiple spurious circuit actuations |
06/29/2007 |
Summary of 06/29/07 public meeting to discuss fire-induced
multiple spurious circuit actuations |
04/24/2007 |
Summary of 04/24/07 public meeting to discuss fire-induced
multiple spurious circuit actuations |
04/24/2007 |
Public meeting with external stakeholders to discuss industry’s
response to questions contained in NRC letter dated March 23, 2007 |
02/16/2007 |
Public meeting with external stakeholders to solicit input
for the development of high-level plan for closure of the multiple
spurious circuit actuations issue |
05/31/2006 |
ACRS Full Committee Meeting on Draft Generic Letter Concerning
Post-Fire Circuits Analysis; Meeting Transcript |
03/01/2006 |
Summary of March 1, 2006, Public Meeting Regarding Post-Fire
Safe-Shutdown Circuit Analysis Actuations Generic Letter and
Regulatory Expectations Pertaining to the Withdrawal of the Operator
Manual Actions Rule |
03/31/2005 |
Engineering, Planning and Management, Inc. (EPM) Meeting on
Risk-Informed Approach to SSD Circuit Inspections |
11/24/2004 |
Public Meeting in Atlanta on October 13-14, 2004 |
07/28/2004 |
July 2004 Public Meeting with NEI to discuss NEI 00-01 |
06/22/2004 |
Meeting Summary with Nuclear Energy Institute to Discuss Fire
Protection Issues |
02/19/2003 |
NRC Facilitated Workshop On Associated Circuits (NRC contact
- Eric Weiss, 301-415-3264)
Official Transcript of Proceedings, Nuclear Regulatory Commission,
"Risk-Informing
Post-Fire Shutdown Circuit Analysis Inspection" dated Wednesday,
February 19, 2003 |
08/29/2002 |
NEI Fire Protection Information Forum
- Seattle Washington
(Contact NEI - Fred Emerson 202-739-8086)
|
06/04/2002 |
ACRS Fire Protection Subcommittee;
(NRC contact- Eric Weiss, 301-415-3264 NEI contact - Fred Emerson
202-739-8086) |
10/22/2001 - 10/25/2001 |
NEI Circuit Analysis workshop - NEI Fire Protection Information
Forum
- Sheraton Sand Key Clearwater Beach, Florida (Contact
Fred Emerson 202-739-8086)
|
03/26/2001 - 03/28/2001 |
Reactor Oversight Process External Lessons Learned Workshop
- Gaithersburg, MD
- NEI 00-01 Status
- Schedule
- Final
Slides (Fire Protection slides begin at slide 11)
|
03/14/2001 |
NRC Regulatory Information Conference - Fire Protection Breakout
Session March 14, 2001, Washington, DC |
02/04/2000- 02/07/2000 |
NEI Fire Protection Information Forum
- San Diego, CA
- NEI 00-01 Status
- Schedule
- May 2001 - Expert Panel Completes Work
- August 2001 - Submit to NRC
- October 2001 - Address NRC Questions
- EPRI Fire Test Preliminary Results
|
12/20/2000 |
Meeting with the Nuclear Energy Institute (NEI) on the Status
of the NEI Risk-Informed Post-Fire Safe Shutdown Circuit Analysis
(Fire-Induced Circuit Failures) Methodology Development Effort |
11/03/2000 |
Expert Elicitation Process Draft G (for evaluation of fire
test results on fire-induced circuit failures) |
09/15/2000 |
Draft Preliminary Staff Comments on the Proposed Fire Test
Protocols |
09/14/2000 |
EPRI NEI Tet Plan for Evaluation of Fire Induced Circuit Failures
Revision D |
10/03/2000 |
Meeting Between the Nuclear Regulatory Commission (NRC) Staff
and the Nuclear Energy Institute (NEI) on Fire Test Protocols |
05/22/2000 |
Transmittal of Staff Comments on a Fire Testing Proposal from
the Nuclear energy Institute |
![(To top of page)](https://webarchive.library.unt.edu/eot2008/20090119050234im_/http://www.nrc.gov/images/navigation/go-top.gif)
Correspondence
Date |
Description |
06/30/2008 |
SECY-08-0093- Resolution of issues related to fire-induced circuit failures |
12/31/2007 |
Status of actions to resolve potential safety concerns from
multiple fire-induced spurious equipment operations |
12/15/2007 |
SECY-06-0196- Issuance of generic letter 2006-XX "Post
Fire Safe Shutdown Circuit Analysis Spurious Actuations" |
06/27/2007 |
Letter from J. Grobe NRC to A. Marion, NEI, regarding methodology
to address fire-induced multiple spurious circuit actuations |
05/15/2007 |
Letter from J. Grobe NRC to A. Marion, NEI, regarding methodology
to address fire-induced multiple spurious circuit actuations |
03/23/2007 |
Letter from J. Grobe NRC to A. Marion, NEI, regarding methodology
to address fire-induced multiple spurious circuit actuations |
05/16/2002 |
Letter from J. N. Hannon, Chief, Plant Systems Branch, NRR,
to A. Marion, Director, Engineering, NEI |
05/2002 |
EPRI Report, “Spurious Actuation of Electrical Circuits
Due to Cable Fires: Results of an Expert Elicitation” (Report No. 1006961) (Not available in ADAMS) |
07/21/1999 |
Letter from Samuel J. Collins, Director, NRR, to Joseph Colvin,
President and CEO, NEI |
11/12/1998 |
Memorandum from Ledyard B. Marsh, Chief, Plant Systems Branch,
NRR, to Gary M. Holahan, Director, Division of Systems Safety
and Analysis, NRR, re "Summary of NRC Workshop on Post-Fire
Safe Shutdown Circuit Analysis Held on July 23, 1998" |
03/11/1997 |
Letter from Samuel J. Collins, Director, NRR, to Ralph E. Beedle,
Senior Vice President and Chief Nuclear Officer, NEI |
![(To top of page)](https://webarchive.library.unt.edu/eot2008/20090119050234im_/http://www.nrc.gov/images/navigation/go-top.gif)
Generic Communications
Document Number |
Description |
GL 2006-XX
(Draft) |
"Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations" |
RIS
2005-030 |
"Clarification of Post-Fire Safe-Shutdown Circuit Regulatory
Requirements" |
RIS
2004-03,
Rev. 1 |
"Risk-Informed Approach for Post-Fire Safe-Shutdown Associated
Circuit Inspections," dated December 30, 2004 |
RIS
2004-03 |
"Risk-Informed Approach for Post-Fire Safe-Shutdown Associated
Circuit Inspections," dated March 2, 2004 |
GL
81-12 |
"Fire Protection Rule," dated February 20, 1981 |
IN
99-17 |
"Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses," dated
June 3, 1999 |
IN
92-18 |
"Potential For Loss of Remote Shutdown Capability During a
Control Room Fire," dated February 28, 1992 |
![(To top of page)](https://webarchive.library.unt.edu/eot2008/20090119050234im_/http://www.nrc.gov/images/navigation/go-top.gif)
Enforcement Guidance
Date |
Description |
02/16/2000 |
Enforcement Guidance Memorandum, 98-002, Revision 2, "Disposition of Violations of Appendix R, Sections III.G and III.L Regarding Circuit Failures" |
![(To top of page)](https://webarchive.library.unt.edu/eot2008/20090119050234im_/http://www.nrc.gov/images/navigation/go-top.gif)
White Papers
Date |
Description |
11/29/2000 |
Rationale for Temporarily Halting Certain Associated Circuits
Inspection Lines of Inquiry During Fire Protection Baseline Triennial
Inspections |
![(To top of page)](https://webarchive.library.unt.edu/eot2008/20090119050234im_/http://www.nrc.gov/images/navigation/go-top.gif)
|