skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Fire-Induced Circuit Faults
Quick Facts
Overview
Frequently Asked Questions

Related Documents

Related Documents About Fire-Induced Circuit Faults

On this page:

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Fire Protection Steering Committee Meetings

    Date Description
    06/03/2008 Summary of June 3, 2008, Meeting of the NRC Fire Protection Steering Committee
    12/05/2007 Summary of December 5, 2007, Meeting of the NRC Fire Protection Steering Committee
    10/17/2007 Summary of October 17,2007, Meeting of the NRC Fire Protection Steering Committee

To top of page

Circuit Analysis Voluntary Initiative

    Date Description
    12/31/2007 Memo to the Chairman: "Status of Actions to Resolve Potential Safety Concerns from Multiple Fire-Induced Spurious Equipment Operations"
    12/21/2007 Draft NEI 00-01, Revision 2, "Guidance for Post-Fire Shutdown Analysis"
    01/28/2005 NEI 00-01, Revision 1, "Guidance for Post-Fire Safe Shutdown Analysis"
    03/19/2004 NEI 04-06, Draft G, "Guidance for Self-Assessment of Circuit Failure Issues"
    01/31/2004 Draft NUREG-1778, "Knowledge Base for Post-Fire Safe-Shutdown Analysis"
    09/11/2003 NRC letter to NEI regarding NEI 00-01
    05/22/2003 NEI 00-01, Revision 0, "Guidance for Post-Fire Safe Shutdown Analysis"
    12/2002 Draft NUREG/CR, "Guidance for Post Fire Safe Shutdown Analysis"
    10/15/2002 Draft Revision D of NEI 00-01, "Guidance for Post-Fire Safe Shutdown Analysis"
    05/2002 EPRI Issues Results of Expert Elicitation "Spurious Activation of Electrical Circuits Due To Cable Fires" (Report 1006961)
    03/06/2002 NRC Comments on Draft C to NEI for Resolution
    10/18/2001 NEI 00-01 Draft C to NRC for Review
    12/20/2000 Summary of Meeting with the Nuclear energy Institute (NEI) on the Status of the NEI Risk-Informed Post-Fire Safe Shutdown Circuit Analysis (Fire-Induced Circuit Failures) Methodology Development Effort
    11/03/2000 Expert Elicitation Process Draft G (for evaluation of fire test results on fire-induced circuit failures)
    10/03/2000 Notice of Meeting Between the Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute (NEI)
    10/03/2000 Summary of Meeting Between the Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute (NEI) on Fire Test Protocols
    09/15/2000 Draft Preliminary Staff Comments on the Proposed Fire Test Protocols
    09/14/2000 EPRI NEI Test Plan for Evaluation of Fire Induced Circuit Failures Revision D
    2000 Transmittal of Staff Comments on a Fire Testing Proposal from the Nuclear Energy Institute

(To top of page)

Public Meetings

    Date Description
    05/07/2008 Summary of May 7, 2008, Category 2 Meeting on fire-induced circuit failures
    03/27/2008 Summary of March 27, 2008, Category 2 Meeting on fire-induced circuit failures
    09/06/2007 Summary of 09/06/07 public meeting to discuss fire-induced multiple spurious circuit actuations
    06/29/2007 Summary of 06/29/07 public meeting to discuss fire-induced multiple spurious circuit actuations
    04/24/2007 Summary of 04/24/07 public meeting to discuss fire-induced multiple spurious circuit actuations
    04/24/2007 Public meeting with external stakeholders to discuss industry’s response to questions contained in NRC letter dated March 23, 2007
    02/16/2007 Public meeting with external stakeholders to solicit input for the development of high-level plan for closure of the multiple spurious circuit actuations issue
    05/31/2006 ACRS Full Committee Meeting on Draft Generic Letter Concerning Post-Fire Circuits Analysis; Meeting Transcript
    03/01/2006 Summary of March 1, 2006, Public Meeting Regarding Post-Fire Safe-Shutdown Circuit Analysis Actuations Generic Letter and Regulatory Expectations Pertaining to the Withdrawal of the Operator Manual Actions Rule
    03/31/2005 Engineering, Planning and Management, Inc. (EPM) Meeting on Risk-Informed Approach to SSD Circuit Inspections
    11/24/2004 Public Meeting in Atlanta on October 13-14, 2004
    07/28/2004 July 2004 Public Meeting with NEI to discuss NEI 00-01
    06/22/2004 Meeting Summary with Nuclear Energy Institute to Discuss Fire Protection Issues
    02/19/2003 NRC Facilitated Workshop On Associated Circuits (NRC contact - Eric Weiss, 301-415-3264)
    Official Transcript of Proceedings, Nuclear Regulatory Commission, "Risk-Informing Post-Fire Shutdown Circuit Analysis Inspection" dated Wednesday, February 19, 2003
    08/29/2002 NEI Fire Protection Information Forum
    • Seattle Washington
      (Contact NEI - Fred Emerson 202-739-8086)
    06/04/2002 ACRS Fire Protection Subcommittee;
    (NRC contact- Eric Weiss, 301-415-3264 NEI contact - Fred Emerson 202-739-8086)
    10/22/2001 - 10/25/2001 NEI Circuit Analysis workshop - NEI Fire Protection Information Forum
    • Sheraton Sand Key Clearwater Beach, Florida (Contact Fred Emerson 202-739-8086)
    03/26/2001 - 03/28/2001 Reactor Oversight Process External Lessons Learned Workshop
    • Gaithersburg, MD
    • NEI 00-01 Status
    • Schedule
    • Final Slides (Fire Protection slides begin at slide 11)
    03/14/2001 NRC Regulatory Information Conference - Fire Protection Breakout Session March 14, 2001, Washington, DC
    02/04/2000- 02/07/2000 NEI Fire Protection Information Forum
    • San Diego, CA
    • NEI 00-01 Status
    • Schedule
      • May 2001 - Expert Panel Completes Work
      • August 2001 - Submit to NRC
      • October 2001 - Address NRC Questions
    • EPRI Fire Test Preliminary Results
    12/20/2000 Meeting with the Nuclear Energy Institute (NEI) on the Status of the NEI Risk-Informed Post-Fire Safe Shutdown Circuit Analysis (Fire-Induced Circuit Failures) Methodology Development Effort
    11/03/2000 Expert Elicitation Process Draft G (for evaluation of fire test results on fire-induced circuit failures)
    09/15/2000 Draft Preliminary Staff Comments on the Proposed Fire Test Protocols
    09/14/2000 EPRI NEI Tet Plan for Evaluation of Fire Induced Circuit Failures Revision D
    10/03/2000 Meeting Between the Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute (NEI) on Fire Test Protocols
    05/22/2000 Transmittal of Staff Comments on a Fire Testing Proposal from the Nuclear energy Institute

(To top of page)

Correspondence

    Date Description
    06/30/2008 SECY-08-0093- Resolution of issues related to fire-induced circuit failures
    12/31/2007 Status of actions to resolve potential safety concerns from multiple fire-induced spurious equipment operations
    12/15/2007 SECY-06-0196- Issuance of generic letter 2006-XX "Post Fire Safe Shutdown Circuit Analysis Spurious Actuations"
    06/27/2007 Letter from J. Grobe NRC to A. Marion, NEI, regarding methodology to address fire-induced multiple spurious circuit actuations
    05/15/2007 Letter from J. Grobe NRC to A. Marion, NEI, regarding methodology to address fire-induced multiple spurious circuit actuations
    03/23/2007 Letter from J. Grobe NRC to A. Marion, NEI, regarding methodology to address fire-induced multiple spurious circuit actuations
    05/16/2002 Letter from J. N. Hannon, Chief, Plant Systems Branch, NRR, to A. Marion, Director, Engineering, NEI
    05/2002 EPRI Report, “Spurious Actuation of Electrical Circuits Due to Cable Fires: Results of an Expert Elicitation” (Report No. 1006961)  (Not available in ADAMS)
    07/21/1999 Letter from Samuel J. Collins, Director, NRR, to Joseph Colvin, President and CEO, NEI
    11/12/1998 Memorandum from Ledyard B. Marsh, Chief, Plant Systems Branch, NRR, to Gary M. Holahan, Director, Division of Systems Safety and Analysis, NRR, re "Summary of NRC Workshop on Post-Fire Safe Shutdown Circuit Analysis Held on July 23, 1998"
    03/11/1997 Letter from Samuel J. Collins, Director, NRR, to Ralph E. Beedle, Senior Vice President and Chief Nuclear Officer, NEI

(To top of page)

Generic Communications

    Document Number Description
    GL 2006-XX
    (Draft)
    "Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations"
    RIS 2005-030 "Clarification of Post-Fire Safe-Shutdown Circuit Regulatory Requirements"
    RIS 2004-03,
    Rev. 1
    "Risk-Informed Approach for Post-Fire Safe-Shutdown Associated Circuit Inspections," dated December 30, 2004
    RIS 2004-03 "Risk-Informed Approach for Post-Fire Safe-Shutdown Associated Circuit Inspections," dated March 2, 2004
    GL 81-12 "Fire Protection Rule," dated February 20, 1981
    IN 99-17 "Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses," dated June 3, 1999
    IN 92-18 "Potential For Loss of Remote Shutdown Capability During a Control Room Fire," dated February 28, 1992

(To top of page)

Enforcement Guidance

    Date Description
    02/16/2000 Enforcement Guidance Memorandum, 98-002, Revision 2, "Disposition of Violations of Appendix R, Sections III.G and III.L Regarding Circuit Failures"

(To top of page)

White Papers

    Date Description
    11/29/2000 Rationale for Temporarily Halting Certain Associated Circuits Inspection Lines of Inquiry During Fire Protection Baseline Triennial Inspections

(To top of page)



Privacy Policy | Site Disclaimer
Thursday, July 17, 2008