Idaho
No document links for 2009
|
- May 1, 2008, Board Letter regarding the seismic / structural design of the Integrated Waste Treatment Unit. [HTML] [PDF] [DOC]
|
- December 21, 2007, Department letter regarding the summary of actions taken and responses to the three remaining questions regarding the geotechnical and seismic investigations for the Integrated Waste Treatment Unit (IWTU) facility design. The scope and schedule to address these three questions was provided in reference 1. [HTML] [PDF] [DOC]
- June 6, 2007, Board letter congratulating Mr. Robert Seal of Idaho Operations Office for being honored as the 2006 DOE Facility Representative of the Year. [HTML] [PDF] [DOC]
- February 7, 2007, Department letter regarding implementation of DOE Order 425.1C, Startup and Restart of Nuclear Facilities. [HTML] [PDF] [DOC]
- January 24, 2007, Board letter regarding the Integrated Waste Treatment Unit (IWTU) at the Idaho National Laboratory. [HTML] [PDF] [DOC]
|
- September 27, 2006, Department letter transmitting two Environmental Management Pilot Facility evaluations for Deliverable 8.6.3 in the 2004-2 implementation plan, Active Confinement Systems. [HTML] [PDF] [DOC]
- June 13, 2006, Board letter congratulating Robert "Dary" Newbry of the Idaho Operations Office as the DOE Facility Representative of the Year for 2005. [HTML] [PDF] [DOC]
- May 26, 2006, Department letter reporting completion of all Commitments in the Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2000-2, Configuration Management - Vital Safety Systems and requesting closure of recommendation 2000-2. [HTML] [PDF] [DOC]
- March 28, 2006, Board letter regarding the plutonium production at the Idaho National Laboratory Advanced Test Reactor (ATR). [HTML] [PDF] [DOC]
|
- June 21, 2005, Board letter commending Messrs. Jeffrey Craven and Robert Knighten of the Y-12 Site Office and Idaho Operations Office, respectively, as the 2004 DOE Facility Representatives of the Year. [HTML] [PDF] [DOC]
|
- May 26, 2004, BNFL Inc. letter to Board Member Dr. Bruce Matthews regarding ventilation systems at the Advanced Mixed Waste Treatment Project at Idaho. [PDF]
|
- October 10, 2003, Department letter regarding Idaho Operations Center's response to Board letter regarding High Efficiency Particulate Air (HEPA) filter ventilation systems. [HTML] [PDF] [DOC]
- March 7, 2003, Board letter establishing a 30-day reporting requirement regarding Advanced Mixed Waste Treatment Project at the Idaho National Engineering and Environmental Laboratory. [HTML] [PDF] [DOC]
|
No document links for 2002
|
- October 2, 2001, Board letter enclosing a staff issue report on the observations on the activities at the Idaho National Engineering and Environmental Laboratory.  [HTM] [WPD] [PDF]
- April 4, 2001, Board letter for Mr. Leroy M. Duenes of Idaho Engineering and Environmental Laboratory (INEEL), expressing appreciation for his attendance and participation in the public meeting on February 13, 2001.  [HTM] [WPD] [PDF]
- January 11, 2000, Board letter forwarding a staff issue report documenting observations concerning the Department's upgrade of the work planning process at INEEL per the Integrated System Management System.  [HTM] [WPD] [PDF]
No document links for 1999
- January 11, 2000, Board letter forwarding a staff issue
report documenting observations concerning the Department's upgrade of the work planning
process at INEEL per the Integrated System Management System. [HTML] [WP] [PDF]
- December 22, 1998, Board letter forwarding a staff
issue report on the Advanced Mixed Waste Treatment Project at INEEL. [HTML] [WP] [PDF]
- March 26, 1997, Review of Actions Taken to Verify Readiness to
Operate the High Level Liquid Waste Evaporator and the New Waste Calcimining Facility at
the Idaho National Engineering and Environmental Laboratory. [HTML]
- June 28, 1996, Advanced Test Reactor Design Review. [HTML]
- August 28, 1996, Handling of spent Nuclear Fuel, for August
19-23, 1996. [HTML]
- June 13, 1996, Department
letter responding to Board letter dated May 10, 1996 regarding the
Board's review on the Department's Operational Readiness Review of
the High-level Liquid Waste Evaporator at the Idaho Chemical
Processing Plant. [HTML]
[PDF] [WP]
- May 22, 1996, Review of Phase II of the DOE's Operational
Readiness Review of High-Level Liquid Waste Evaporator at the ICPP. [HTML]
- April 19, 1996, Review of the Department of Energy's Operational
Readiness Review of High-Level Liquid Waste Evaporator at the Idaho Chemical Processing
Plant, Idaho National Engineering Laboratory. [HTML]
- October 16, 1995, Report on INEL Emergency Response Exercise
"Varmit". [HTML]
- September 28, 1995, Review of Spent Nuclear Fuel
Activities. [HTML]
- August 29, 1995, Board staff trip report: INEL - Idaho
chemical processing plant - August 8-10, 1995. [HTML]
- September 19, 1995, Board staff trip report: Chemical
processing and safety basis at the new waste calcimining facility, INEL August 29-31,
1995. [HTML]
- July 25, 1995, Board staff trip report on tank farm
radiological protection at INEL (trip conducted on June 27-29, 1995). [PDF]
- May 2, 1995, Board staff trip report on fuel transfers
and the NWCF at ICPP (trip conducted on March 28-30, 1995). [PDF]
- March 10, 1995, Board staff trip report: Waste Management
and Environmental Restoration, INEL. [HTML]
- January 17, 1995, Board staff trip report: Radiological
Controls and Conduct of Operations, INEL, High Level Waste Tank Farm Replacement Project. [HTML]
- January 30, 1995, Board staff trip report on Backup Power Supply
Systems, INEL, Idaho Chemical Processing Plant. [HTML]
- October 12, 1994, Board staff trip report on electrical and fire
protection systems at INEL. [PDF]
- September 26, 1995, Review of Spent Nuclear Fuel Activities. [HTML]
- September 16, 1994, Board staff trip report on Tritium Testing
and Safety Analyses, INEL, Advanced Test Reactor. [HTML]
- September 15, 1995, Review of Site wide Training
and Qualification Review at the Idaho National Engineering Laboratory. [HTML]
- September 15, 1995, Review of Report on Review of Idaho National
Engineering Laboratory Facility Representatives Program. [HTML]
- August 22, 1994, Board staff trip report on structural and
seismic review of CPP-666 spent fuel storage basins at INEL. [PDF]
- August 22, 1994, Board staff trip report on structural and
seismic review of CPP-603 spent fuel storage basins at INEL. [PDF]
- April 28, 1994, Board staff trip report review of Idaho Chemical
Processing Plant High Level Waste Tank Farm Activities. [HTML]
- August 2, 1994, Board staff trip report on Fire Protection
Program and Features, INEL, Radioactive Waste Management Complex report. [HTML]
- July 29, 1994, Board staff trip report on the radiation
protection program at INEEL. [PDF]
- April 7, 1994, Board staff trip report on Recovery of SNAP Fuel
from Corroding Fuel Cans in the CPP-603 South Basin. [HTML]
- February 1, 1994, Board letter forwarding staff trip
report on Idaho chemical processing plant. [PDF]
- November 23, 1993, Board staff trip report on INEL Radioactive
Waste Management Complex, Facility Overview and Conduct of Operations Review. [HTML]
- November 23, 1993, Board staff trip report on Spent
Fuel Storage Basins at HAN, INL, and SRS. [PDF]
- September 10, 1993, Board Staff's review of conduct of
operations issues at ICPP. [PDF]
- May 19, 1993, Board staff trip report on Idaho Chemical
Processing Plant. [PDF]
- March 18, 1993, Board staff trip report on operator
recertification and requalification at SRS. [PDF]
- March 4, 1993, Board letter forwarding staff trip
report on fuel storage and NWCF at INEL (trip conducted January 11-15, 1993). [PDF]
|
|
|