skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Drop Test Results for the Combustion Engineering Model No. ABB-2901 Fuel Pellet Shipping Package (NUREG/CR-6818)

On this page:

Download complete document

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.


Publication Information

Manuscript Completed: July 2002
Date Published: October 2003

Prepared by
R.S. Hafner, G.C. Mok, L.B. Hagler

Lawrence Livermore National Laboratory
7000 East Avenue
Livermore, CA 94550

R.W. Parkhill, NRC Project Manager

Prepared for
Spent Fuel Project Office
Office of Nuclear Material Safety and Safeguards
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001
NRC Job Code A0291

Availability Notice


Abstract

The U.S. Nuclear Regulatory Commission (USNRC) contracted with the Packaging Review Group (PRG) at Lawrence Livermore National Laboratory (LLNL) to conduct a single, 9-m (30-ft) shallow-angle drop test on the Combustion Engineering ABB-2901 drum-type shipping package. The purpose of the test was to determine if bolted-ring drum closures could fail during shallow-angle drops. The single test clearly demonstrated the vulnerability of the bolted-ring drum closure to shallow-angle drops—the test package’s drum closure was easily and totally separated from the drum package. This report illustrates test preparation, setup and test runs, and includes excerpts from the video record showing damage to the component parts. The summary and findings section offers significant findings of this test program. Appendix A is the complete test plan written prior to the test date.



Privacy Policy | Site Disclaimer
Friday, February 23, 2007