General Decision Number: WY080004 12/05/2008 WY4 Superseded General Decision Number: WY20070004 State: Wyoming Construction Type: Heavy Counties: Albany, Big Horn, Campbell, Carbon, Converse, Crook, Fremont, Goshen, Hot Springs, Johnson, Lincoln, Niobrara, Park, Platte, Sheridan, Sublette, Sweetwater, Teton, Uinta, Washakie and Weston Counties in Wyoming. HEAVY CONSTRUCTION PROJECTS (Including Water and Sewer Lines and Water Wells and Excluding Industrial and Processing Plants and Refineries). Modification Number Publication Date 0 02/08/2008 1 05/02/2008 2 07/04/2008 3 12/05/2008 ELEC0322-001 03/01/2007 Line Construction Rates Fringes CABLE SPLICER....................$ 37.57 11.79 Groundman........................$ 20.17 8.92 Line Equipment Operator..........$ 28.32 10.88 Linemen..........................$ 34.04 11.48 ---------------------------------------------------------------- ELEC0322-006 06/01/2006 Big Horn, Carbon, Converse, Fremont, Hot Springs, Johnson, Lincoln, Park,Sheridan, Sublette, Sweetwater, Teton, Unita and Washakie Counties Rates Fringes ELECTRICIAN Projects $50,000 and Under..$ 16.55 6.33 ---------------------------------------------------------------- * ELEC0322-007 12/01/2008 Carbon, Converse and Fremont Counties Rates Fringes ELECTRICIAN Projects Over $50,000.......$ 24.25 8.72 ---------------------------------------------------------------- * ELEC0322-009 12/01/2008 Big Horn, Hot Springs, Johnson, Lincoln, Park, Sheridan, Sublette, Sweetwater, Teton, Unita and Washakie Counties Rates Fringes ELECTRICIAN Projects Over $50,000.......$ 24.25 8.72 ---------------------------------------------------------------- ELEC0415-004 03/02/2008 Albany, Goshen, and Platte Counties Rates Fringes ELECTRICIAN......................$ 25.43 5%+9.35 ---------------------------------------------------------------- ELEC0415-005 04/02/2007 Campbell, Crook, Niobrara, and Weston Counties Rates Fringes ELECTRICIAN......................$ 25.40 5%+7.85 ---------------------------------------------------------------- SUWY2004-006 06/03/2003 Rates Fringes CARPENTER (Including Formbuilding and Formsetting)....$ 14.20 2.41 LABORER Common......................$ 9.60 Fence Erector...............$ 7.88 Flagger.....................$ 10.00 Pipelayer...................$ 10.22 OPERATOR: Power Equipment Backhoe.....................$ 12.90 Blade/Grader................$ 13.53 1.56 Excavator...................$ 13.91 Front End Loader............$ 12.77 1.73 Mechanic....................$ 14.07 1.28 Roller......................$ 10.00 .91 Scraper.....................$ 13.53 1.56 TRUCK DRIVER Dump........................$ 10.96 .87 Water.......................$ 9.75 .05 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION