General Decision Number: OH080037 01/02/2009 OH37 Superseded General Decision Number: OH20070037 State: Ohio Construction Type: Building Counties: Defiance and Henry Counties in Ohio. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 04/04/2008 2 05/02/2008 3 06/06/2008 4 07/04/2008 5 08/01/2008 6 10/03/2008 7 01/02/2009 CARP1393-009 07/01/2008 Rates Fringes MILLWRIGHT.......................$ 27.30 16.05 ---------------------------------------------------------------- CARP1581-001 07/01/2008 Rates Fringes CARPENTER Including Drywall Hanging & Forms.....................$ 23.71 13.28 ---------------------------------------------------------------- * ELEC0008-010 05/26/2008 Rates Fringes CABLE SPLICER....................$ 34.68 15.80 ELECTRICIAN......................$ 33.03 15.73 ---------------------------------------------------------------- ENGI0018-006 05/01/2008 Rates Fringes OPERATOR: Power Equipment Crane.......................$ 28.54 10.81 ---------------------------------------------------------------- IRON0055-008 07/01/2008 DEFIANCE (South of a line drawn from where Route #66 meets the northern line through Independence to the eastern county border) & HENRY Rates Fringes IRONWORKER, STRUCTURAL...........$ 28.00 14.45 ---------------------------------------------------------------- IRON0147-006 06/01/2008 DEFIANCE (Northern part, excluding south of a line drawn from where Route #66 meets the northern line through Independence to the eastern county border) Rates Fringes IRONWORKER, STRUCTURAL...........$ 23.32 16.52 ---------------------------------------------------------------- LABO0500-003 07/01/2008 Rates Fringes Laborer, General.................$ 22.67 9.29 ---------------------------------------------------------------- PLUM0050-005 09/29/2008 Rates Fringes PLUMBER/PIPEFITTER Plumbers include HVAC work. Pipefitters exclude HVAC work........................$ 33.45 17.64 ---------------------------------------------------------------- * SFOH0669-003 01/01/2009 Rates Fringes SPRINKLER FITTER.................$ 31.85 15.80 ---------------------------------------------------------------- * SHEE0033-031 01/01/2009 Rates Fringes Sheet metal worker Including HVAC Work.........$ 30.22 17.29 ---------------------------------------------------------------- SUOH2001-007 05/02/2001 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 19.63 6.47 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION