General Decision Number: OH080002 01/02/2009 OH2 Superseded General Decision Number: OH20070002 State: Ohio Construction Types: Heavy and Highway Counties: Ohio Statewide. Heavy and Highway Construction Projects Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 04/04/2008 4 05/02/2008 5 06/06/2008 6 07/04/2008 7 08/01/2008 8 08/15/2008 9 09/05/2008 10 10/03/2008 11 11/07/2008 12 12/05/2008 13 01/02/2009 BRKY0007-003 06/01/2008 LAWRENCE Rates Fringes Bricklayer, Stonemason...........$ 25.80 14.88 ---------------------------------------------------------------- BROH0001-001 07/01/2008 DEFIANCE, FULTON (Excluding Fulton, Amboy & Swan Creek Townships), HENRY (Excluding Monroe, Bartlow, Liberty, Washington, Richfield, Marion, Damascus & Townships & that part of Harrison Township outside corporate limits of city of Napoleon), PAULDING, PUTNAM & WILLIAMS Rates Fringes Bricklayer, Stonemason...........$ 30.39 8.43 ---------------------------------------------------------------- BROH0001-004 06/01/2008 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 25.75 8.60 ---------------------------------------------------------------- BROH0003-002 07/01/2008 FULTON (Townships of Amboy, Swan Creek & Fulton), HENRY (Townships of Washington, Damascus, Richfield, Bartlow, Liberty, Harrison, Monroe, & Marion), LUCAS & WOOD (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids) Rates Fringes Bricklayer, Stonemason...........$ 28.65 12.40 ---------------------------------------------------------------- BROH0005-003 05/01/2008 CUYAHOGA, LORAIN & MEDINA (Hinckley, Granger, Brunswick, Liverpool, Montville, York, Homer, Harrisville, Chatham, Litchfield & Spencer Townships and the city of Medina) Rates Fringes BRICKLAYER BRICKLAYERS; CAULKERS; CLEANERS; POINTERS; & STONEMASONS.................$ 29.47 10.50 SANDBLASTERS................$ 29.72 10.50 SEWER BRICKLAYERS; STACK BUILDERS; & SWING SCAFFOLDS.$ 29.97 10.50 ---------------------------------------------------------------- BROH0006-005 05/01/2008 CARROLL, COLUMBIANA (Knox, Butler, West & Hanover Townships), STARK & TUSCARAWAS Rates Fringes Bricklayer, Stonemason...........$ 25.58 10.15 ---------------------------------------------------------------- BROH0007-005 06/01/2008 PORTAGE & SUMMIT Rates Fringes BRICKLAYER.......................$ 28.00 10.50 ---------------------------------------------------------------- BROH0007-010 06/01/2008 PORTAGE & SUMMIT Rates Fringes MASON - STONE....................$ 27.47 7.55 ---------------------------------------------------------------- BROH0008-001 06/01/2008 COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton, & Unity Townships and the city of New Waterford), MAHONING & TRUMBULL Rates Fringes BRICKLAYER.......................$ 24.55 13.23 ---------------------------------------------------------------- BROH0009-002 07/01/2008 BELMONT, JEFFERSON (Warren & Mt. Pleasant Townships & the Village of Dillonvale) & MONROE Rates Fringes Bricklayer, Stonemason...........$ 23.00 13.75 Refractory.......................$ 27.22 13.75 ---------------------------------------------------------------- BROH0010-002 07/01/2008 COLUMBIANA (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships) & JEFFERSON (Brush Creek & Saline Townships) Rates Fringes Bricklayer, Stonemason...........$ 24.20 12.11 ---------------------------------------------------------------- BROH0014-002 07/01/2005 HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale) Rates Fringes Bricklayer, Stonemason...........$ 24.01 8.85 ---------------------------------------------------------------- BROH0016-002 10/01/2008 ASHTABULA, GEAUGA & LAKE Rates Fringes Bricklayer, Stonemason...........$ 29.11 10.88 ---------------------------------------------------------------- BROH0018-002 06/01/2008 BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN COUNTIES: Rates Fringes Bricklayer, Stonemason...........$ 26.11 9.49 ---------------------------------------------------------------- BROH0022-004 07/01/2007 CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN, MIAMI, MONTGOMERY, PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) & SHELBY Rates Fringes Bricklayer, Stonemason...........$ 25.20 9.24 ---------------------------------------------------------------- BROH0032-001 06/01/2008 GALLIA & MEIGS Rates Fringes Bricklayer, Stonemason...........$ 27.71 11.00 ---------------------------------------------------------------- BROH0035-002 07/01/2008 ALLEN, AUGLAIZE, MERCER & VAN WERT Rates Fringes Bricklayer, Stonemason...........$ 24.46 9.84 ---------------------------------------------------------------- BROH0039-002 06/01/2008 ADAMS & SCIOTO Rates Fringes Bricklayer, Stonemason...........$ 25.62 13.85 ---------------------------------------------------------------- BROH0040-003 06/01/2008 ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND, WAYNE & WYANDOT (Except Crawford, Ridge, Richland & Tymochtee Townships) Rates Fringes Bricklayer, Stonemason...........$ 25.42 13.70 Layout Man and Sawman rate: $1.00 per hour above journeyman rate. Free standing stack work ground level to top of stack; Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate. "Hot" work: $2.50 above journeyman rate. ---------------------------------------------------------------- BROH0044-002 06/01/2008 Rates Fringes Bricklayer, Stonemason COSHOCTON, FAIRFIELD, GUERNSEY, HOCKING, KNOX, KICKING, MORGAN, MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships) & PERRY COUNTIES:...................$ 24.70 9.65 ---------------------------------------------------------------- BROH0045-002 06/01/2008 FAYETTE, JACKSON, PIKE, ROSS & VINTON Rates Fringes Bricklayer, Stonemason...........$ 27.22 9.85 ---------------------------------------------------------------- BROH0046-002 06/01/2008 ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) & WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships), & the islands of Lake Erie north of Sandusky. Rates Fringes Bricklayer, Stonemason...........$ 26.13 13.50 Layout Man and Sawman rate: $1.00 per hour above journeyman rate. Free standing stack work ground level to top of stack; Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate. "Hot" work: $2.50 above journeyman rate. ---------------------------------------------------------------- BROH0052-001 06/01/2008 ATHENS Rates Fringes Bricklayer, Stonemason...........$ 25.30 10.50 ---------------------------------------------------------------- BROH0052-003 06/01/2008 NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) & WASHINGTON Rates Fringes Bricklayer, Stonemason...........$ 24.93 10.50 ---------------------------------------------------------------- BROH0055-003 06/01/2008 DELAWARE, FRANKLIN, MADISON, PICKAWAY & UNION Rates Fringes Bricklayer, Stonemason...........$ 26.30 10.90 ---------------------------------------------------------------- CARP0003-004 05/01/2008 MAHONING & TRUMBULL Rates Fringes CARPENTER........................$ 23.61 11.96 ---------------------------------------------------------------- CARP0069-003 05/01/2008 CARROLL, STARK, TUSCARAWAS & WAYNE Rates Fringes CARPENTER........................$ 23.78 10.53 ---------------------------------------------------------------- CARP0069-006 05/01/2008 COSHOCTON, HOLMES, KNOX & MORROW Rates Fringes CARPENTER........................$ 22.44 9.91 ---------------------------------------------------------------- CARP0171-002 05/01/2008 BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE Rates Fringes CARPENTER........................$ 23.19 12.20 ---------------------------------------------------------------- CARP0248-005 07/01/2008 LUCAS & WOOD Rates Fringes CARPENTER........................$ 27.27 14.58 ---------------------------------------------------------------- CARP0248-008 07/01/2008 Rates Fringes CARPENTER DEFIANCE, FULTON, HANCOCK, HENRY, PAULDING & WILLIAMS COUNTIES....................$ 23.71 13.28 ---------------------------------------------------------------- CARP0254-002 05/01/2008 ASHTABULA, CUYAHOGA, GEAUGA & LAKE Rates Fringes CARPENTER........................$ 29.50 11.17 ---------------------------------------------------------------- CARP0372-002 07/01/2008 ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT Rates Fringes CARPENTER........................$ 23.18 13.28 ---------------------------------------------------------------- CARP0639-003 05/01/2008 MEDINA, PORTAGE & SUMMIT Rates Fringes CARPENTER........................$ 27.41 11.50 ---------------------------------------------------------------- CARP0735-002 05/01/2008 ASHLAND, ERIE, HURON, LORAIN & RICHLAND Rates Fringes CARPENTER........................$ 23.07 10.15 ---------------------------------------------------------------- CARP1311-001 05/01/2008 BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE, GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN Rates Fringes Carpenter & Piledrivermen........$ 25.80 9.69 Diver............................$ 38.70 9.69 ---------------------------------------------------------------- CARP1393-002 07/01/2008 CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD Rates Fringes Piledrivermen & Diver's Tender...$ 27.30 16.05 DIVERS - $250.00 per day ---------------------------------------------------------------- CARP1393-003 07/01/2008 ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT Rates Fringes Piledrivermen & Diver's Tender...$ 25.15 15.92 DIVERS - $250.00 per day ---------------------------------------------------------------- CARP1871-006 05/01/2008 BELMONT, HARRISON, & MONROE Rates Fringes Diver, Wet.......................$ 42.08 11.95 Piledrivermen; Diver, Dry........$ 28.05 11.95 ---------------------------------------------------------------- CARP1871-008 05/01/2008 ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE, LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT Rates Fringes Diver, Wet.......................$ 42.00 12.67 Piledrivermen; Diver, Dry........$ 28.00 12.67 ---------------------------------------------------------------- CARP1871-014 05/01/2008 CARROLL, STARK, TUSCARAWAS & WAYNE Rates Fringes Diver, Wet.......................$ 34.88 11.54 Piledrivermen; Diver, Dry........$ 23.25 11.54 ---------------------------------------------------------------- CARP1871-015 05/01/2008 COSHOCTON, HOLMES, KNOX & MORROW Rates Fringes Diver, Wet.......................$ 33.53 10.69 Piledrivermen; Diver, Dry........$ 22.35 10.69 ---------------------------------------------------------------- CARP1871-017 05/01/2008 MAHONING & TRUMBULL Rates Fringes Diver, Wet.......................$ 36.54 12.19 Piledrivermen; Diver, Dry........$ 24.36 12.19 ---------------------------------------------------------------- CARP2239-001 07/01/2008 CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT Rates Fringes CARPENTER........................$ 23.71 13.28 ---------------------------------------------------------------- CARP2264-004 01/01/2002 COLUMBIANA & JEFFERSON Rates Fringes PILEDRIVERMAN....................$ 23.82 8.48 ---------------------------------------------------------------- CARP9904-001 05/01/2000 ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA, GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING, MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON & WASHINGTON Rates Fringes Carpenter & Piledrivermen........$ 21.86 5.27 Diver............................$ 32.79 5.27 ---------------------------------------------------------------- * ELEC0008-002 05/26/2008 DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD Rates Fringes CABLE SPLICER....................$ 34.68 15.80 ELECTRICIAN......................$ 33.03 15.73 ---------------------------------------------------------------- ELEC0032-003 06/01/2008 ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships) Rates Fringes ELECTRICIAN......................$ 27.05 11.91 ---------------------------------------------------------------- ELEC0032-004 06/01/1998 ALLEN, HARDIN, VAN WERT & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships) Rates Fringes Line Construction Equipment Operator..........$ 20.27 4.12+a Groundman Truck Driver......$ 14.43 3.63+a Lineman.....................$ 22.52 4.31+a FOOTNOTE: a. Half day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day ---------------------------------------------------------------- ELEC0038-002 05/05/2008 CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township) Rates Fringes ELECTRICIAN Excluding Sound & Communications Work.........$ 33.78 15.63 ---------------------------------------------------------------- ELEC0038-008 05/01/2006 CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township) Rates Fringes Sound & Communication Technician Communications Technician...$ 21.20 8.12+a+b Installer Technician........$ 20.45 8.04+a+b FOOTNOTES; a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th; Labor Day; Thanksgiving Day; & Christmas Day b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service ---------------------------------------------------------------- ELEC0064-003 12/03/2007 COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships), & TRUMBULL (Hubbard & Liberty Townships) Rates Fringes ELECTRICIAN......................$ 28.25 11.92` ---------------------------------------------------------------- ELEC0071-001 05/29/2006 ASHLAND, CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING, JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MARION, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), UNION, VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships) & WASHINGTON Rates Fringes Line Construction Equipment Operators.........$ 25.47 9.78 Groundmen...................$ 18.40 8.38 Linemen; Cable Splicers.....$ 28.30 10.34 ---------------------------------------------------------------- ELEC0071-004 05/29/2006 AUGLAIZE, CLINTON, DARKE, GREENE, LOGAN, MERCER, MIAMI, MONTGOMERY, PREBLE & SHELBY Rates Fringes Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34 ---------------------------------------------------------------- ELEC0071-005 06/05/2006 ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN Rates Fringes Line Construction Cable Splicer; Lineman......$ 35.30 12.07 Equipment Operator..........$ 31.77 11.34 Groundman...................$ 24.71 9.88 ---------------------------------------------------------------- ELEC0071-008 05/29/2006 COLUMBIANA, MAHONING & TRUMBULL Rates Fringes Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34 ---------------------------------------------------------------- ELEC0071-010 05/29/2006 BELMONT, CARROLL, HARRISON, HOLMES, JEFFERSON, MEDINA, PORTAGE, STARK, SUMMIT & WAYNE Rates Fringes Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34 ---------------------------------------------------------------- ELEC0071-013 05/29/2006 BROWN, BUTLER, CLERMONT, HAMILTON & WARREN Rates Fringes Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34 ---------------------------------------------------------------- ELEC0082-002 06/02/2008 CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships) Rates Fringes ELECTRICIAN......................$ 29.45 10.94 ---------------------------------------------------------------- ELEC0082-006 05/24/2004 CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships) Rates Fringes Sound & Communication Technician Cable Puller................$ 9.14 4.91 Installer/Technician........$ 18.28 6.32 ---------------------------------------------------------------- ELEC0129-003 03/01/2001 LORAIN (Except Columbia Township) & MEDINA (Litchfield & Liverpool Townships) Rates Fringes ELECTRICIAN......................$ 27.25 6.85 ---------------------------------------------------------------- ELEC0129-004 09/01/2001 ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships) Rates Fringes ELECTRICIAN......................$ 27.25 6.85 ---------------------------------------------------------------- * ELEC0141-003 09/01/2008 BELMONT Rates Fringes CABLE SPLICER....................$ 27.91 18.88 ELECTRICIAN......................$ 27.66 18.88 ---------------------------------------------------------------- * ELEC0212-003 01/01/2006 BROWN, CLERMONT & HAMILTON Rates Fringes Sound & Communication Technician.......................$ 20.45 6.95 ---------------------------------------------------------------- ELEC0212-005 06/02/2008 BROWN, CLERMONT & HAMILTON Rates Fringes ELECTRICIAN......................$ 26.11 11.62 ---------------------------------------------------------------- ELEC0245-003 08/28/2006 DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD Rates Fringes Line Construction Cable Splicer...............$ 35.85 20.25%+4.80+a Groundman/Truck Driver......$ 18.64 20.25%+4.80+a Heli-arc Welding............$ 31.47 20.25%+4.80+a Lineman.....................$ 31.17 20.25%+4.80+a Operator - Class 1..........$ 24.94 20.25%+4.80+a Operator - Class 2..........$ 21.82 20.25%+4.80+a Traffic Signal & Lighting Technician..................$ 28.05 20.25%+4.80+a FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday. ---------------------------------------------------------------- ELEC0246-006 10/29/2007 CARROLL (South of Fox, Harrison, Rose & Washington Townships), COLUMBIANA (South of Butler, Fairfield, Knox, Salem & Unity Townships), HARRISON & JEFFERSON Rates Fringes ELECTRICIAN......................$ 31.00 18.29+a FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday ---------------------------------------------------------------- ELEC0306-005 05/26/2008 MEDINA (Brunswick, Chatham, Granger, Guilford, Harrisville, Hinckley, Homer, Lafayette, Medina, Montville, Sharon, Spencer, Wadsworth, Westfield & York Townships), PORTAGE (Atwater, Aurora, Brimfield, Deerfield, Franklin, Mantua, Randolph, Ravenna, Rootstown, Shalersville, Streetsboro & Suffield Townships), SUMMIT & WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton, & Wayne Townships) Rates Fringes CABLE SPLICER....................$ 33.52 5%+11.76 ELECTRICIAN......................$ 31.04 5%+11.76 ---------------------------------------------------------------- ELEC0317-002 06/01/2008 GALLIA & LAWRENCE Rates Fringes CABLE SPLICER....................$ 30.79 17.97 ELECTRICIAN......................$ 29.32 17.93 ---------------------------------------------------------------- ELEC0317-008 06/01/1998 ADAMS, ATHENS, GALLIA, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), LAWRENCE, MEIGS, PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships) Rates Fringes Line Construction Cable Splicers..............$ 23.66 8.48 Equipment Operators.........$ 17.14 8.25 Groundmen...................$ 13.92 8.14 Linemen.....................$ 21.42 8.40 ---------------------------------------------------------------- ELEC0540-003 06/05/1997 TUSCARAWAS COUNTY (North of Auburn, Clay, Rush & York Townships) Rates Fringes Line Construction Groundman; & Truck Driver...$ 14.65 8.18 Line Equipment Operator.....$ 19.02 8.69 Lineman; & Cable Splicer....$ 21.86 9.01 ---------------------------------------------------------------- ELEC0540-005 05/28/2007 CARROLL (Northern half, including Fox, Harrison, Rose & Washington Townhships), COLUMBIANA (Knox Township), HOLMES, MAHONING (Smith Township), STARK, TUSCARAWAS (North of Auburn, Clay, Rush & York Townships), & WAYNE (South of Baughman, Chester, Green & Wayne Townships) Rates Fringes ELECTRICIAN......................$ 26.69 15.63 ---------------------------------------------------------------- ELEC0573-003 12/01/2008 ASHTABULA (Colebrook, Wayne, Williamsfield, Orwell & Windsor Townships), GEAUGA (Auburn, Middlefield, Parkman & Troy Townships), MAHONING (Milton Township), PORTAGE (Charlestown, Edinburg, Freedom, Hiram, Nelson, Palmyra, Paris & Windham Townships) & TRUMBULL (Except Liberty & Hubbard Townships) Rates Fringes ELECTRICIAN......................$ 30.00 12.40 ---------------------------------------------------------------- ELEC0575-001 12/01/2008 ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY (Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships) Rates Fringes ELECTRICIAN......................$ 29.84 11.81 ---------------------------------------------------------------- ELEC0648-001 09/04/2006 BUTLER & WARREN (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships) Rates Fringes CABLE SPLICER....................$ 25.30 8.80 ELECTRICIAN......................$ 24.80 8.80 ---------------------------------------------------------------- ELEC0673-004 06/02/2008 ASHTABULA (Excluding Orwell, Colebrook, Williamsfield, Wayne & Windsor Townships), GEAUGA (Burton, Chardon, Claridon, Hambden, Huntsburg, Montville, Munson, Newbury & Thompson Townships) & LAKE Rates Fringes CABLE SPLICER....................$ 30.15 15.00 ELECTRICIAN......................$ 29.90 15.00 ---------------------------------------------------------------- ELEC0683-002 06/02/2008 CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON, PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships) & UNION Rates Fringes CABLE SPLICER....................$ 28.60 12.43 ELECTRICIAN......................$ 28.00 12.41 ---------------------------------------------------------------- ELEC0688-003 12/03/2008 ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley & Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown & Jefferson Townships), MARION, MORROW, RICHLAND & WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships) Rates Fringes ELECTRICIAN......................$ 25.66 13.71 ---------------------------------------------------------------- ELEC0867-001 06/01/1998 ERIE Rates Fringes Line Construction Lineman; Cable Splicer; & Equipment Operator..........$ 20.75 4.09 Truck Driver (Winch) Groundman; & Groundman......$ 13.49 3.87 ---------------------------------------------------------------- ELEC0972-002 06/01/2008 ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships) & WASHINGTON Rates Fringes CABLE SPLICER....................$ 28.48 18.27 ELECTRICIAN......................$ 28.23 18.27 ---------------------------------------------------------------- ELEC1105-001 06/01/2008 COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College Townships), LICKING, MUSKINGUM, PERRY & TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry & Bucks Townships) Rates Fringes ELECTRICIAN......................$ 26.94 11.64 ---------------------------------------------------------------- ENGI0018-003 05/31/2008 ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE & SUMMIT Rates Fringes OPERATOR: Power Equipment GROUP 1.....................$ 30.03 10.81 GROUP 2.....................$ 29.93 10.81 GROUP 3.....................$ 28.89 10.81 GROUP 4.....................$ 27.67 10.81 GROUP 5.....................$ 22.38 10.81 GROUP 6.....................$ 30.28 10.81 GROUP 7.....................$ 30.53 10.81 OPERATING ENGINEER CLASSIFICATIONS GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump; Crane (All Types, Including Boom Truck, Cherry Picker); Crane-Compact, Track or Rubber over 4,000 lbs. capacity; Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Horizontal Directional Drill (over 500,000 ft. lbs. thrust); Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge); Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper; Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver; Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; & Wheel Excavator GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Hydro Milling Machine; Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24" wide & under); & Vermeer type Concrete Saw GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); & Welding Machines GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine; Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand; Farm-type Tractor with attachments (highway) except Masonry); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift (highway); Form Trencher; Hydro Hammer; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader; Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); & Vibratory Compactor with Integral Power GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt); Generator; Masonry Fork Lift; Inboard-Outboard Motor Boat Launch; Masonry Fork Lift; Oil Heater (asphalt plant); Oiler; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge); Signalperson; Tire Repairperson; & VAC/ALLS GROUP 6 - Master Mechanic & Boom from 150 to 180 GROUP 7 - Boom from 180 and over ---------------------------------------------------------------- ENGI0018-004 05/01/2008 ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PUTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD & WYANDOT Rates Fringes OPERATOR: Power Equipment GROUP 1.....................$ 28.54 10.81 GROUP 2.....................$ 28.42 10.81 GROUP 3.....................$ 27.38 10.81 GROUP 4.....................$ 26.20 10.81 GROUP 5.....................$ 20.74 10.81 GROUP 6.....................$ 28.79 10.81 GROUP 7.....................$ 29.04 10.81 OPERATING ENGINEER CLASSIFICATIONS GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump; Crane (All Types, Including Boom Truck, Cherry Picker); Crane-Compact, Track or Rubber over 4,000 lbs. capacity; Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Horizontal Directional Drill (over 500,000 ft. lbs. thrust); Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge); Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper; Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver; Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; & Wheel Excavator GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Hydro Milling Machine; Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24" wide & under); & Vermeer type Concrete Saw GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); & Welding Machines GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine; Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand; Farm-type Tractor with attachments (highway) except Masonry); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift (highway); Form Trencher; Hydro Hammer; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader; Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); & Vibratory Compactor with Integral Power GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt); Generator; Masonry Fork Lift; Inboard-Outboard Motor Boat Launch; Masonry Fork Lift; Oil Heater (asphalt plant); Oiler; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge); Signalperson; Tire Repairperson; & VAC/ALLS GROUP 6 - Master Mechanic & Boom from 150 to 180 GROUP 7 - Boom from 180 and over ---------------------------------------------------------------- ENGI0066-023 06/01/2008 COLUMBIANA, MAHONING & TRUMBULL COUNTIES Rates Fringes OPERATOR: Power Equipment ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - A & B.............$ 34.11 13.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - A & B.............$ 33.86 13.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - A & B.............$ 30.92 13.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - A & B.............$ 27.43 13.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - A & B.............$ 24.12 13.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - C & D.............$ 31.30 13.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - C & D.............$ 31.09 13.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - C & D.............$ 28.35 13.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - C & D.............$ 25.15 13.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - C & D.............$ 22.11 13.66 ALL OTHER WORK GROUP 1.....................$ 28.49 13.66 ALL OTHER WORK GROUP 2.....................$ 28.22 13.66 ALL OTHER WORK GROUP 3.....................$ 25.77 13.66 ALL OTHER WORK GROUP 4.....................$ 22.86 13.66 ALL OTHER WORK GROUP 5.....................$ 20.10 13.66 GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug; Boring Machine Attached to Tractor; Bullclam; Bulldozer; C.M.I. Road Builder & Similar Type; Cable Placer & Layer; Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom; Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead; Crane-Rough Terrain; Crane-Side Boom; Crane-Truck; Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge; Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile; Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail; Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum; Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer; Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine; Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar); Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine; Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing; Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper; Tractor-Double Boom; Tractor with Attachments; Truck-Boom; Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type) GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer; Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine; Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden); Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor; Curb Builder, self-propelled; Drill Wagon; Fork lift & Lulls; Generator Set; Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller; Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter; Tractor; Trencher Form; Water Blaster; Steam Jenny; Syphon; Vibrator-Gasoline; & Welding Machine GROUP 5 - Brakeperson; Fireperson; & Oiler ---------------------------------------------------------------- IRON0017-002 08/01/2008 ASHTABULA (North of Route 6, starting at the Geauga County Line, proceeding east to State Route 45), CUYAHOGA, ERIE (Eastern 2/3), GEAUGA, HURON (East of a line drawn from the north border through Monroeville & Willard), LAKE, LORAIN, MEDINA (North of Old Rte. #224), PORTAGE (West of a line from Middlefield to Shalersville to Deerfield) & SUMMIT (North of Old Rte. #224, including city limits of Barberton) Rates Fringes IRONWORKER Ornamental; Reinforcing & Structural..................$ 28.35 17.83 ---------------------------------------------------------------- IRON0044-002 06/01/2008 CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line) Rates Fringes IRONWORKER Fence Erector...............$ 22.70 16.42 Ornamental; Structural......$ 25.22 16.42 ---------------------------------------------------------------- IRON0055-003 07/01/2008 CRAWFORD (Area Between lines drawn from where Hwy #598 & #30 meet through N. Liberty to the northern border & from said Hwy junction point due west to the border), DEFIANCE (S. of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), ERIE (Western 1/3), FULTON, HANCOCK, HARDIN (North of a line drawn from Maysville to a point 4 miles south of the northern line on the eastern line), HENRY, HURON (West of a line drawn from the northern border through Monroeville & Willard), LUCAS, OTTAWA, PUTNAM (East of a line drawn from the northern border down through Miller City to where #696 meets the southern border), SANDUSKY, SENECA, WILLIAMS (East of a line drawn from Pioneer through Stryker to the southern border), WOOD & WYANDOT (North of Rte. #30) Rates Fringes IRONWORKER Fence Erector...............$ 19.75 14.45 Flat Road Mesh..............$ 20.75 14.45 Tunnels & Caissons Under Pressure....................$ 28.50 14.45 All Other Work..............$ 28.00 14.45 ---------------------------------------------------------------- IRON0147-002 06/01/2008 ALLEN (Northern half), DEFIANCE (Northern part, excluding south of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), MERCER (Northern half), PAULDING, PUTNAM (Western part, excluding east of a line drawn from the northern border down through Miller City to where #696 meets the southern border), VAN WERT & WILLIAMS (Western part, excluding east of a line drawn from Pioneer through Stryker to the southern border) Rates Fringes IRONWORKER.......................$ 23.32 16.52 ---------------------------------------------------------------- IRON0172-002 06/01/2008 CHAMPAIGN (Eastern one-third), CLARK (Eastern one-fourth), COSHOCTON (West of a line beginning at the northwestern county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN (Excluding a line drawn from Roundhead to Maysville), HIGHLAND (Eastern one-fifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, LOGAN (Eastern one-third), MADISON, MARION, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE (Northern half), ROSS, UNION, VINTON & WYANDOT (South of Rte. #30) Rates Fringes IRONWORKER.......................$ 25.57 15.45 ---------------------------------------------------------------- IRON0207-004 06/01/2008 ASHTABULA (Southern part starting at the Geauga County line), COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224), PORTAGE (E. of a line from Middlefield to Shalersville to Deerfield) & TRUMBULL Rates Fringes IRONWORKER Layout; Sheeter.............$ 27.31 16.03 Ornamental; Reinforcing; Structural..................$ 26.31 16.03 ---------------------------------------------------------------- IRON0290-002 06/01/2008 ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CHAMPAIGN (Excluding east of a line drawn from Catawla to the point where #68 intersects the northern county line), CLARK (Western two-thirds), CLINTON (Excluding south of a line drawn from Blanchester to Lynchburg), DARKE, GREENE, HIGHLAND (Inside lines drawn from Marshall to Lynchburg & from the northern county line through East Monroe to Marshall), LOGAN (West of a line drawn from West Liberty to where the northern county line meets the western county line of Hardin), MERCER (Southern half), MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN (Excluding south of a line drawn from Blanchester through Morrow to the western county line) Rates Fringes IRONWORKER Beyond 25 mile radius of L.U. #290 Office, Dayton....$ 24.68 16.85 Within 25 mile radius of L.U. #290 Office, Dayton....$ 24.53 16.85 ---------------------------------------------------------------- IRON0348-005 08/01/2003 ASHTABULA (Eastern part from Lake Erie on the north to route #322 on the south to include Conneaut, Kingsville, Sheffield, Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont, Richmond, Andover & Williamsfield Townships) Rates Fringes IRONWORKER Structural, excluding metal building erection & Reinforcing.................$ 22.17 13.35 ---------------------------------------------------------------- IRON0372-002 06/01/2008 ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN(South of a line drawn from Blanchester through Morrow to the west county line) Rates Fringes IRONWORKER, REINFORCING Beyond 30-mile radius of Hamilton County Courthouse..$ 25.90 16.00 Up to & including 30-mile radius of Hamilton County Courthouse..................$ 25.65 16.00 ---------------------------------------------------------------- IRON0549-003 12/01/2008 BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM (Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border) Rates Fringes IRONWORKER.......................$ 28.75 15.69 ---------------------------------------------------------------- IRON0550-004 05/01/2008 ASHLAND, CARROLL, COLUMBIANA (W. of a line from Damascus to Highlandtown), COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Rte. #224), MAHONING (S. of Old Rte. #224), MEDINA (S. of Old Rte. #224), PORTAGE (S. of Old Rte. #224), RICHLAND, STARK, SUMMIT (S. of Old Rte. #224, Excluding city limits of Barberton), TUSCARAWAS, & WAYNE Rates Fringes Ironworkers:Structural, Ornamental and Reinforcing.......$ 23.88 16.07 ---------------------------------------------------------------- IRON0769-004 06/01/2008 ADAMS (Eastern Half), GALLIA, JACKSON (Southern Half), LAWRENCE & SCIOTO Rates Fringes IRONWORKER ZONE 1......................$ 27.12 17.07 ZONE 2......................$ 27.52 17.07 ZONE 3......................$ 29.12 17.07 ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave. ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave. ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., 1643 Greenup Ave. ---------------------------------------------------------------- IRON0787-003 06/01/2008 ATHENS, MEIGS, MORGAN, NOBLE & WASHINGTON Rates Fringes IRONWORKER.......................$ 27.77 16.25 ---------------------------------------------------------------- * LABO0265-008 05/01/2008 Rates Fringes LABORER ASHTABULA, ERIE, HURON, LORAIN, LUCAS, MAHONING, MEDINA, OTTAWA, PORTAGE, SANDUSKY, STARK, SUMMIT, TRUMBULL & WOOD COUNTIES GROUP 1....................$ 25.45 6.80 GROUP 2....................$ 25.62 6.80 GROUP 3....................$ 25.95 6.80 GROUP 4....................$ 26.40 6.80 CUYAHOGA AND GEAUGA COUNTIES ONLY: SEWAGE PLANTS, WASTE PLANTS, WATER TREATMENT FACILITIES, PUMPING STATIONS, & ETHANOL PLANTS CONSTRUCTION................$ 28.06 6.80 CUYAHOGA, GEAUGA & LAKE COUNTIES GROUP 1....................$ 26.68 6.80 GROUP 2....................$ 26.85 6.80 GROUP 3....................$ 27.18 6.80 GROUP 4....................$ 27.63 6.80 REMAINING COUNTIES OF OHIO GROUP 1....................$ 25.02 6.80 GROUP 2....................$ 25.19 6.80 GROUP 3....................$ 25.52 6.80 GROUP 4....................$ 25.97 6.80 LABORER CLASSIFICATIONS GROUP 1 - Asphalt Laborer; Carpenter Tender; Concrete Curing Applicator; Dump Man (Batch Truck); Guardrail and Fence Installer; Joint Setter; Laborer (Construction); Landscape Laborer; Highway Lighting Worker; Signalization Worker; Mesh Handlers & Placer; Right-of-way Laborer; Riprap Laborer & Grouter; Scaffold Erector; Seal Coating; Surface Treatment or Road Mix Laborer; Sign Installer; Slurry Seal; Utility Man; Bridge Man; Handyman; Waterproofing Laborer; Flagperson; Hazardous Waste (level D); Diver Tender; Zone Person & Traffic Control GROUP 2 - Skid Steer; Asphalt Raker; Concrete Puddler; Kettle Man Pipeline); Machine Driven Tools (Gas, Electric, Air); Mason Tender; Brick Paver; Mortar Mixer; Power Buggy or Power Wheelbarrow; Sheeting & Shoring Man; Surface Grinder Man; Plastic Fusing Machine Operator; Pug Mill Operator; & Vacuum Devices (wet or dry); Rodding Machine Operator; Diver; Screwman or Paver; Screed Person; Water Blast, Hand Held Wand; Pumps 4" & Under (Gas, Air or Electric) & Hazardous Waste (level C); Air Track and Wagon Drill; Bottom Person; Cofferdam (below 25 ft. deep); Concrete Saw Person; Cutting with Burning Torch; Form Setter; Hand Spiker (Railroad); Pipelayer; Tunnel Laborer (without air) & Caisson; Underground Person (working in Sewer and Waterline, Cleaning, Repairing & Reconditioning); Sandblaster Nozzle Person; & Hazardous Waste (level B) GROUP 3 - Blaster; Mucker; Powder Person; Top Lander; Wrencher (Mechanical Joints & Utility Pipeline); Yarner; Hazardous Waste (level A); Concrete Specialist; Concrete Crew in Tunnels (With Air-pressurized - $1.00 premium); Curb Setter & Cutter; Grade Checker; Utility Pipeline Tapper; Waterline; and Caulker GROUP 4 - Miner (With Air-pressurized - $1.00 premium); & Gunite Nozzle Person TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. ---------------------------------------------------------------- PAIN0006-002 05/01/2008 ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. of the East-West Turnpike) & SUMMIT (N. of the East-West Turnpike) Rates Fringes PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS GROUP 1....................$ 26.59 10.17 GROUP 2....................$ 26.99 10.17 GROUP 3....................$ 27.29 10.17 GROUP 4....................$ 28.29 10.17 COMMERCIAL REPAINT GROUP 1....................$ 25.09 10.17 GROUP 2....................$ 25.49 10.17 GROUP 3....................$ 25.79 10.17 PAINTER CLASSIFICATIONS - COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS GROUP 1 - Brush; & Roller GROUP 2 - Sandblasting & Buffing GROUP 3 - Spray Painting; Closed Steel Above 55 feet; Bridges & Open Structural Steel; Tanks - Water Towers; Bridge Painters; Bridge Riggers; Containment Builders GROUP 4 - Bridge Blaster PAINTER CLASSIFICATIONS - COMMERCIAL REPAINT GROUP 1 - Brush; & Roller GROUP 2 - Sandblasting & Buffing GROUP 3 - Spray Painting ---------------------------------------------------------------- PAIN0006-014 07/01/2007 FULTON, HENRY, LUCAS, OTTAWA (Excluding Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genova) & WOOD Rates Fringes PAINTER NEW COMMERCIAL WORK GROUP 1....................$ 24.76 10.69 GROUP 2....................$ 25.01 10.69 GROUP 3....................$ 25.26 10.69 GROUP 4....................$ 25.51 10.69 GROUP 5....................$ 25.46 10.69 GROUP 6....................$ 25.76 10.69 GROUP 7....................$ 26.06 10.69 REPAINT IS 90% OF JR PAINTER CLASSIFICATIONS GROUP 1 - Brush, Spray & Sandblasting Pot Tender GROUP 2 - Refinery & Refinery Tanks; Surfaces 30 ft. or over where material is applied to or labor performed on above ground level (exterior), floor level (interior) GROUP 3 - Swing Stage & Chair GROUP 4 - Solvent-Based Catalized Epoxy Materials of 2 or More Component Materials, to include Solvent-Based Conversion Varnish GROUP 5 - All Methods of Spray, Paint or Any Material applied with a Pressure Device GROUP 6 - Solvent Based Material; Sand and Abrasive Blasting GROUP 7 - Television & Radio Tower, Bridge, Horizontal Cable & Tank/Stack/Water Tank over 30 ft. (all include Scaffolding-Brush) ---------------------------------------------------------------- PAIN0006-021 07/01/2007 ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER, PAULDING, PUTNAM, SHELBY, VAN WERT & WILLIAMS Rates Fringes PAINTER Brush & Roller..............$ 22.60 8.20 Drywall Finishing & Taping..$ 21.50 8.20 Lead Abatement..............$ 24.35 8.20 Spray, Sandblasting, Pressure Cleaning & Refinery....................$ 23.35 8.20 Swing Stage, Chair, Spiders & Cherry Pickers....$ 22.85 8.20 Wallcoverings...............$ 21.30 8.20 All surfaces 40 ft. or over where material is applied to or labor performed on, above ground level (exterior), floor level (interior) - $.50 premium Applying Coal Tar Products - $1.00 premium ---------------------------------------------------------------- PAIN0012-008 06/14/2008 BUTLER Rates Fringes PAINTER GROUP 1.....................$ 20.49 6.83 GROUP 2.....................$ 23.10 6.83 GROUP 3.....................$ 23.60 6.83 GROUP 4.....................$ 23.85 6.83 GROUP 5.....................$ 24.10 6.83 PAINTER CLASSIFICATIONS GROUP 1: Bridge Equipment Tender; Bridge/Containment Builder GROUP 2: Brush & Roller GROUP 3: Spray GROUP 4: Sandblasting; & Waterblasting GROUP 5: Elevated Tanks; Steeplejack Work; Bridge; & Lead Abatement ---------------------------------------------------------------- PAIN0012-010 06/14/2008 BROWN, CLERMONT, CLINTON, HAMILTON & WARREN Rates Fringes PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING Bridge Equipment Tender and Containment Builder....$ 20.49 6.83 Bridges when highest point of clearance is 60 feet or more; & Lead Abatement Projects.........$ 24.10 6.83 Brush & Roller.............$ 23.10 6.83 Sandblasting & Hopper Tender; Water Blasting.....$ 23.85 6.83 Spray......................$ 23.60 6.83 ---------------------------------------------------------------- PAIN0012-014 11/01/2008 DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS & UNION Rates Fringes PAINTER Bridges.....................$ 32.58 8.49 Brush; Roller...............$ 23.10 8.49 Sandblasting; Steamcleaning; Waterblasting (3500 PSI or Over)& Hazardous Work.......$ 23.80 8.49 Spray.......................$ 23.60 8.49 Stacks; Tanks; & Towers.....$ 26.61 8.49 Structural Steel & Swing Stage.......................$ 23.40 8.49 ---------------------------------------------------------------- PAIN0093-001 12/01/2008 ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE & WASHINGTON Rates Fringes PAINTER Base Rate; Power Generating Facilities.......$ 24.87 10.00 Bridges; Locks; Dams; High Tension Towers; Energized Substations.................$ 27.87 10.00 ---------------------------------------------------------------- PAIN0249-002 05/01/2008 CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes PAINTER GROUP 1 - Brush & Roller....$ 22.29 7.48 GROUP 2 - Swing, Scaffold Bridges; Structural Steel; Open Acid Tank; High Tension Electrical Equipment; & Hot Pipes......$ 22.70 7.48 GROUP 3 - Spray; Sandblast; Steamclean; Lead Abatement..............$ 23.04 7.48 GROUP 4 - Steeplejack Work..$ 23.24 7.48 GROUP 5 - Coal Tar..........$ 23.79 7.48 GROUP 6 - Bridge Equipment Tender & or Containment Builder.....................$ 25.88 7.48 GROUP 7 - Tanks, Stacks & Towers......................$ 26.28 7.48 GROUP 8 - Bridge Blaster, Rigger......................$ 32.25 7.48 ---------------------------------------------------------------- * PAIN0356-002 07/01/2008 KNOX, LICKING, MUSKINGUM & PERRY Rates Fringes PAINTER Bridge Equipment Tenders & Containment Builders........$ 27.46 6.95 Bridges; Blasters & Riggers.$ 34.13 6.95 Brush & Roller..............$ 20.43 6.95 Sandblasting; Steam Cleaning; Waterblasting & Hazardous Work..............$ 25.35 6.95 Spray.......................$ 20.93 6.95 Structural Steel & Swing Stage.......................$ 24.95 6.95 Tanks; Stacks & Towers......$ 28.16 6.95 ---------------------------------------------------------------- PAIN0438-002 12/01/2008 BELMONT, HARRISON & JEFFERSON Rates Fringes PAINTER Base Rate; Power Generating Facilities.......$ 24.70 10.00 Bridges; Locks; Dams; High Tension Towers; Energized Substations.................$ 27.70 10.00 ---------------------------------------------------------------- PAIN0476-001 06/01/2008 COLUMBIANA, MAHONING & TRUMBULL Rates Fringes PAINTER GROUP 1.....................$ 22.95 9.40 GROUP 2.....................$ 23.15 9.40 GROUP 3.....................$ 23.16 9.40 GROUP 4.....................$ 23.45 9.40 GROUP 5.....................$ 23.60 9.40 GROUP 6.....................$ 23.85 9.40 GROUP 7.....................$ 24.03 9.40 PAINTER CLASSIFICATIONS GROUP 1: Brush & Roller GROUP 2: Bridges GROUP 3: Structural Steel GROUP 4: Spray, Except Bar Joist/Deck GROUP 5: Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above 50 Feet; Swingstages GROUP 6: Tanks; Sandblasting GROUP 7: Towers; Stacks ---------------------------------------------------------------- PAIN0555-002 06/01/2008 ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO Rates Fringes PAINTER GROUP 1.....................$ 24.48 11.47 GROUP 2.....................$ 25.57 11.47 GROUP 3.....................$ 26.67 11.47 GROUP 4.....................$ 28.83 11.47 PAINTER CLASSIFICATIONS GROUP 1 - Containment Builder GROUP 2 - Brush; Roller; Power Tools, Under 40 feet GROUP 3 - Sand Blasting; Spray; Steam Cleaning; Pressure Washing; Epoxy & Two Component Materials; Lead Abatement; Hazardous Waste; Toxic Materials; Bulk & Storage Tanks of 25,000 Gallon Capacity or More; Elevated Tanks GROUP 4 - Stacks; Bridges ---------------------------------------------------------------- PAIN0603-002 06/01/2008 CARROLL, COSHOCTON, HOLMES, STARK, TUSCARAWAS & WAYNE Rates Fringes PAINTER Bridges; Towers, Poles & Stacks; Sandblasting Steel; Structural Steel & Metalizing..................$ 21.26 8.65 Brush & Roller..............$ 20.55 8.65 Spray; Tank Interior & Exterior....................$ 21.08 8.65 ---------------------------------------------------------------- PAIN0639-001 05/01/2003 Rates Fringes Sign Painter & Erector...........$ 17.57 4.55+a+b+c FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day; July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1 Floating Day b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service - 20 days' paid vacation c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral ---------------------------------------------------------------- PAIN0788-002 06/01/2008 ASHLAND, CRAWFORD, ERIE, HANCOCK, HURON, MARION, MORROW, OTTAWA (Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genoa), RICHLAND, SANDUSKY, SENECA & WYANDOT Rates Fringes PAINTER Brush & Roller..............$ 21.80 8.71 Structural Steel............$ 23.40 8.71 WINTER REPAINT: Between December 1 to March 31 - 90%JR $.50 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: While working swingstage, boatswain chair, needle beam and horizontal cable. While operating sprayguns, sandblasting, cobblasting and high pressure waterblasting (4000psi). $1.00 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: For the application of catalized epoxy, including latex epoxy that is deemed hazardous, lead abatement, or for work or material where special precautions beyond normal work duties must be taken. For working on stacks, tanks, and towers over 40 feet in height. ---------------------------------------------------------------- PAIN0841-001 06/01/2007 MEDINA, PORTAGE (South of and including Ohio Turnpike), & SUMMIT (South of and including Ohio Turnpike) Rates Fringes Painters: GROUP 1.....................$ 23.05 8.98 GROUP 2.....................$ 23.70 8.98 GROUP 3.....................$ 23.80 8.98 GROUP 4.....................$ 23.90 8.98 GROUP 5.....................$ 24.30 8.98 GROUP 6.....................$ 37.70 8.98 GROUP 1 - Brush, Roller & Paperhanger GROUP 2 - Epoxy Application GROUP 3 - Night Rate, Swing Scaffold, Bosum Chair & Window Jack GROUP 4 - Spray Gun Operator of Any & All Coatings GROUP 5 - Sandblast, Painting of Standpipes, etc. from Scaffolds, Bridge Work and/or Open Structural Steel, Standpipes and/or Water Towers, Synthetic Exterior, Lead Abatement, Asbestos Removal, Drywall Finisher and/or Taper, Drywall Finisher and Follow-up Man Using Automatic Tools GROUP 6 - Public & Commerce Transportation, Steel or Galvanized, Bridges, Tunnels & Related Support Items ---------------------------------------------------------------- PAIN0970-007 12/01/2008 GALLIA, LAWRENCE, MEIGS & VINTON Rates Fringes PAINTER Base Rate...................$ 24.83 10.00 Bridges, Locks, Dams & Tension Towers..............$ 27.83 10.00 ---------------------------------------------------------------- PLUM0042-002 07/01/2008 ASHLAND, CRAWFORD, ERIE, HURON, KNOX, LORAIN, MORROW, RICHLAND & WYANDOT Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 27.50 14.95 ---------------------------------------------------------------- PLUM0050-002 09/29/2008 DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 33.45 17.64 ---------------------------------------------------------------- PLUM0055-003 05/01/2008 ASHTABULA, CUYAHOGA, GEAUGA, LAKE, MEDINA (N. of Rte. #18 & Smith Road) & SUMMIT (N. of Rte. #303, including the corporate limits of the city of Hudson) Rates Fringes PLUMBER..........................$ 31.50 17.75 ---------------------------------------------------------------- PLUM0083-001 07/01/2007 BELMONT & MONROE (North of Rte. #78) Rates Fringes Plumber and Steamfitter..........$ 28.76 14.68 ---------------------------------------------------------------- PLUM0094-002 05/24/2008 CARROLL (N. half), STARK & WAYNE Rates Fringes PLUMBER/PIPEFITTER...............$ 27.60 14.17 ---------------------------------------------------------------- PLUM0120-002 05/01/2008 ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN (the C.E.I. Power House in Avon Lake), MEDINA (N. of Rte. #18) & SUMMIT (N. of #303) Rates Fringes PIPEFITTER.......................$ 33.17 16.10 ---------------------------------------------------------------- PLUM0162-002 06/01/2008 CHAMPAIGN, CLARK, CLINTON, DARKE, FAYETTE, GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 27.50 16.07 ---------------------------------------------------------------- PLUM0168-002 06/01/2008 MEIGS, MONROE (South of Rte. #78), MORGAN (South of Rte. #78) & WASHINGTON Rates Fringes PLUMBER/PIPEFITTER...............$ 29.73 15.32 ---------------------------------------------------------------- PLUM0189-002 06/01/2008 DELAWARE, FAIRFIELD, FRANKLIN, HOCKING, LICKING, MADISON, MARION, PERRY, PICKAWAY, ROSS & UNION Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 30.01 15.48 ---------------------------------------------------------------- PLUM0219-002 06/01/2007 MEDINA (Rte. #18 from eastern edge of Medina Co., west to eastern corporate limits of the city of Medina, & on the county road from the west corporate limits of Medina running due west to and through community of Risley to the western edge of Medina County - All territory south of this line), PORTAGE & SUMMIT (S. of Rte. #303) Rates Fringes Plumber and Steamfitter..........$ 28.56 16.11 ---------------------------------------------------------------- PLUM0392-002 06/01/2008 BROWN, BUTLER, CLERMONT, HAMILTON & WARREN Rates Fringes PLUMBER/PIPEFITTER...............$ 28.39 14.30 ---------------------------------------------------------------- PLUM0396-001 06/01/2008 COLUMBIANA (Excluding Washington & Yellow Creek Townships & Liverpool Twp. - Secs. 35 & 36 - West of County Road #427), MAHONING & TRUMBULL Rates Fringes PLUMBER/PIPEFITTER...............$ 26.66 14.06 ---------------------------------------------------------------- PLUM0495-002 06/01/2008 CARROLL (Rose, Monroe, Union, Lee, Orange, Perry & Loudon Townships), COLUMBIANA (Washington & Yellow Creek Townships & Liverpool Township, Secs. 35 & 36, West of County Rd. #427), COSHOCTON, GUERNSEY, HARRISON, HOLMES, JEFFERSON, MORGAN (South to State Rte. #78 & from McConnelsville west on State Rte. #37 to the Perry County line), MUSKINGUM, NOBLE & TUSCARAWAS Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 29.23 14.38 ---------------------------------------------------------------- PLUM0577-002 06/01/2008 ADAMS, ATHENS, GALLIA, HIGHLAND, JACKSON, LAWRENCE, PIKE, SCIOTO & VINTON Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 25.70 16.22 ---------------------------------------------------------------- PLUM0776-002 07/01/2008 ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY & VAN WERT Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 29.05 14.85 ---------------------------------------------------------------- TEAM0377-003 05/01/2008 STATEWIDE, EXCEPT CUYAHOGA, GEAUGA & LAKE Rates Fringes TRUCK DRIVER GROUP 1.....................$ 21.93 10.51 GROUP 2.....................$ 22.35 10.51 TRUCK DRIVER CLASSIFICATIONS GROUP 1 - Asphalt Distributor; Batch; 4- Wheel Service; 4-Wheel Dump; Oil Distributor & Tandem GROUP 2 - Tractor-Trailer Combination: Fuel; Pole Trailer; Ready Mix; Semi-Tractor; & Asphalt Oil Spraybar Man When Operated From Cab; 5 Axles & Over; Belly Dump; End Dump; Articulated Dump; Heavy Duty Equipment; Low Boy; & Truck Mechanic ---------------------------------------------------------------- TEAM0436-002 05/01/2008 CUYAHOGA, GEAUGA & LAKE Rates Fringes TRUCK DRIVER GROUP 1.....................$ 24.00 10.35 GROUP 2.....................$ 24.50 10.35 GROUP 1: Straight & Dump, Straight Fuel GROUP 2: Semi Fuel, Semi Tractor, Euclids, Darts, Tank, Asphalt Spreaders, Low Boys, Carry-All, Tourna-Rockers, Hi-Lifts, Extra Long Trailers, Semi-Pole Trailers, Double Hook-Up Tractor Trailers including Team Track & Railroad Siding, Semi-Tractor & Tri-Axle Trailer, Tandem Tractor & Tandem Trailer, Tag Along Trailer, Expandable Trailer or Towing Requiring Road Permits, Ready-Mix (Agitator or Non-Agitator), Bulk Concrete Driver, Dry Batch Truck, Articulated End Dump ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION