General Decision Number: IL080005 11/28/2008 IL5 Superseded General Decision Number: IL20070005 State: Illinois Construction Types: Building and Residential County: Macon County in Illinois. BUILDING AND RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and garden apartments up to and including 4 stories). Modification Number Publication Date 0 02/08/2008 1 04/25/2008 2 05/23/2008 3 06/20/2008 4 07/18/2008 5 08/15/2008 6 09/12/2008 7 10/03/2008 8 11/21/2008 9 11/28/2008 BOIL0363-001 09/02/2005 Rates Fringes BOILERMAKER......................$ 27.75 17.75 ---------------------------------------------------------------- BRIL0013-002 05/01/2008 Rates Fringes Bricklayer MARBLE SETTERS, TILE SETTERS, and TERRAZZO WORKERS.....................$ 25.64 14.80 ---------------------------------------------------------------- CARP0742-003 05/01/2008 Rates Fringes CARPENTER Carpenter and Lather........$ 27.79 15.16 Piledriver..................$ 28.29 15.16 Residential.................$ 20.84 15.16 ---------------------------------------------------------------- CARP1051-005 05/01/2008 Rates Fringes MILLWRIGHT.......................$ 27.70 15.71 ---------------------------------------------------------------- ELEC0146-002 09/01/2008 RESIDENTIAL Rates Fringes ELECTRICIAN......................$ 19.98 8.05 ---------------------------------------------------------------- ELEC0146-005 06/01/2007 BUILDING Rates Fringes ELECTRICIAN ALL OTHER WORK..............$ 30.65 11.13 ---------------------------------------------------------------- ELEV0092-004 05/01/2002 Rates Fringes ELEVATOR MECHANIC................$ 26.615 7.455 + A&B FOOTNOTES: a. Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving; Veterans' Day and Christmas Day. b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 yrs; Employer contributes 6% of regular hourly rate to vacation pay credit for employee who has worked in business less. ---------------------------------------------------------------- ENGI0965-004 05/01/2008 MACON COUNTY Rates Fringes Operating Engineers: Group 1.....................$ 27.90 15.25 Group 2.....................$ 25.55 15.25 Group 3.....................$ 21.95 15.25 Group 4.....................$ 29.40 15.25 PREMIUM PAY- CRANES WITH BOOMS-120-200 ft.- 1.00 per hour; 150 ft. .02 Per Foot For Each Foot Above 200; MULTIPLE UNIT MACHINES- 1.00 per hour; UNDERGROUND WORK- 1.00 per hour; UNDER AIR PRESSURE- 1.00 per hour; LONG BOOMS ON STATIONARY CRANES- 1.00 per hour. Above Long Boom Scale Hazardous Waste/Asbestos Removal workers receive the following wages and fringe benefits: Level A (highest level of respiratory, skin, and eye protection) receives $2.00 per hour above journeyman. Level B (same as level B, but a lower level of skin protection) receives $1.50 per hour above journeyman. Level C (same as level B, but a lower level of respiratory protection) receives $1.00 per hour above journeyman. OPERATING ENGINEER CLASSIFICATIONS: GROUP 1: Asphalt Plant Engineer; Asphalt screed man; Apsco concrete spreader; Asphalt paver; Asphalt roller on bituminous contrete; Athey loaders; Cableways; Cherry Picker; ClamShell; C.M.I. & Similar Type Autograde Formless Paver,Autgrade Placer & Finisher; Concrete Breaker;Concrete plant Oper; Concrete Pumps; Cranes; Derricks; Derrick boats; Draglines; Earth auger boring machine, Elevating Graders; Engineers on dredge; Gravel processing machines; Head equipment greaser; High lift or fork lift; Hoist with two drums or 2 or more loadlines; Locomotive; Mechanics; Motor graders or auto patrols; Operators or levelman on dredges; Power boat oper; Pug mill oper; (Asphalt plat); Orange peels; Overhead cranes; Paving mixer; Piledrivers; Pipe wraper & Painting machines; Push dozers, or Push cats; Rock crusher; Ross carrier or similar machine; Scoops; Skimmers 2 cu yd capacity & Under: Sheep foot roller (self propelled);Shovels; Skimmer; Scoops; Test hole drilling machines; Tower machine; Tower mixer; Track Tupe & Loaders; Track type forklifts or high lifts; Track jacks & Tampers; Trackors; Sideboom; Trenching machine; Ditching machine; Tunnel lugger; Wheel type end loader; Winch cat; Scoops (Allor tournapull) GROUP 2: Asphalt booster & Heater; Asphalt distributor; Asphalt plant fireman; Building Elevator; Bull float or flexplane; Concrete finshing machine; Concrete saw, self propelled; Concrete spreader machine; Gravel or stone spreader, Power operated; Hoist automatic; Hoist with one drum & one load line; Oiler on 2 paving mixers when used in tandem boom or winch truck; Post hole diggers; Mechanical; Road or street sweeper, Self-propelled; Scissors hoist; Seaman tiller; Straw machine; Vibratory compactor; Well drill machine; & Mud jacks. GROUP 3: Air compressor, Track or self-propelled; Bulk cement batching- plants; Conveyors; Concrete miers (Except Plant, Paver, Tower) Firement, Generators; Greasers; Light plants; Mechanical theater; Oilers; Power from graders; Power sub-grader; Pug mill, When used other than asphalt operation; Roolers (Except bitumin ous); Tractors w/o Power attachments regardless of size or type; Truck crane oiler; & driver ( one man ); Vibratory hammer; Wat er pump; Welding machine ( one 300 amp or over) Combinations of five of any air compressors; Conveyors, Welding Machines, Water pumps; Light plants or Generators shall be in batteries or with in 300 FT. Group 4: Lattice Boom crawler crane, Lattice Boom truck crane, Telescopic truck mounted crane, Tower crane ---------------------------------------------------------------- IRON0046-001 05/01/2008 Rates Fringes IRONWORKER.......................$ 27.30 15.97 ---------------------------------------------------------------- IRON0380-003 05/01/2007 MACON COUNTY (East of Decatur) Rates Fringes IRONWORKER.......................$ 27.55 13.96 ---------------------------------------------------------------- * LABO0159-004 05/01/2008 Rates Fringes LABORER..........................$ 24.55 12.73 LABORER PREMIUMS (Add to basic hourly rate): MASON TENDER $1.00 ASBESTOS, LEAD & HAZAROUS MATERIALS $2.00 ---------------------------------------------------------------- MARB0109-001 05/01/2008 Rates Fringes Marble Finisher, terrazzo finisher and tile finisher.......$ 24.34 14.60 ---------------------------------------------------------------- PAIN0288-003 05/01/2008 Rates Fringes PAINTER Brush, Roller over 50 ft....$ 27.10 12.40 Paperhanging and Drywall Taping......................$ 26.10 12.40 Spray and Sandblasting......$ 26.85 12.40 Spray over 50 ft............$ 27.85 12.40 ---------------------------------------------------------------- PAIN1168-003 05/01/2008 Rates Fringes GLAZIER..........................$ 29.23 11.69 ---------------------------------------------------------------- PLAS0103-004 05/01/2002 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 22.50 9.75 PLASTERER........................$ 16.67 1.985 ---------------------------------------------------------------- PLUM0065-002 06/16/2008 Rates Fringes Plumber and Steamfitter..........$ 27.00 13.82 ---------------------------------------------------------------- PLUM0065-003 06/16/2008 Rates Fringes Plumber and Steamfitter..........$ 33.93 13.82 ---------------------------------------------------------------- ROOF0092-002 06/01/2008 Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.85 13.70 ---------------------------------------------------------------- SHEE0218-010 06/01/2008 Rates Fringes SHEET METAL WORKER...............$ 29.29 17.80 ---------------------------------------------------------------- TEAM0279-001 05/01/2008 Rates Fringes TRUCK DRIVER Group 1.....................$ 27.58 8.85+a Group 2.....................$ 27.98 8.85+a Group 3.....................$ 28.18 8.85+a Group 4.....................$ 28.43 8.85+a Group 5.....................$ 29.18 8.85+a FOOTNOTE: a. $31.40 per day CLASSIFICATIONS: GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity. GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity; winch trucks; and four axle combiation units. GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons. GROUP 4: Low Boy and Oil Distributors. GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION