General Decision Number: AR080168 12/26/2008 AR168 State: Arkansas Construction Type: Building Building Construction County: Jefferson County in Arkansas. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number Publication Date 0 12/26/2008 BOIL0069-001 01/01/2008 Rates Fringes BOILERMAKER......................$ 26.23 13.96 ---------------------------------------------------------------- IRON0321-001 05/01/2008 Rates Fringes IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL.......$ 18.10 11.64 ---------------------------------------------------------------- PLUM0155-001 05/01/2008 Rates Fringes PLUMBER/PIPEFITTER (excluding HVAC pipe installation)..........$ 24.21 7.65 ---------------------------------------------------------------- ROOF0020-018 01/01/2008 Rates Fringes ROOFER...........................$ 14.50 .20 ---------------------------------------------------------------- SHEE0036-014 06/01/2008 Rates Fringes SHEETMETAL WORKER (Excluding HVAC Duct Installation)..........$ 20.39 10.57 ---------------------------------------------------------------- SUAR2008-122 11/20/2008 Rates Fringes ASBESTOS WORKER/MECHANICAL INSULATOR........................$ 18.67 0.00 BRICKLAYER.......................$ 19.11 0.00 CARPENTER, Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work.......$ 15.27 1.35 CEMENT MASON/CONCRETE FINISHER...$ 14.46 0.00 DRYWALL FINISHER/TAPER...........$ 14.71 0.00 ELECTRICIAN......................$ 20.00 5.50 LABORER: Common or General......$ 9.25 0.00 LABORER: Landscape..............$ 9.36 0.00 LABORER: Mason Tender - Brick...$ 10.29 0.00 LABORER: Mason Tender - Cement/Concrete..................$ 11.72 0.00 LABORER: Pipelayer..............$ 11.77 1.48 OPERATOR: Asphalt Paver.........$ 15.02 0.00 OPERATOR: Asphalt Roller........$ 12.03 1.83 OPERATOR: Blade/Grader..........$ 16.50 0.00 OPERATOR: Bulldozer.............$ 14.56 0.00 OPERATOR: Crane.................$ 16.19 0.00 OPERATOR: Forklift..............$ 13.00 0.00 OPERATOR: Roller (Dirt and Grade Compaction)................$ 10.88 0.00 OPERATOR: Screed................$ 11.75 2.08 OPERATOR: Backhoe/Excavator/Trackhoe.......$ 19.70 6.20 OPERATOR: Front End Loader.......$ 13.73 1.98 PAINTER (Brush, Roller and Spray), Excluding Drywall Finishing/Taping.................$ 12.65 0.00 PIPEFITTER (HVAC Pipe Installation Only)...............$ 19.10 4.10 SHEETMETAL WORKER (HVAC Duct Work Only).......................$ 14.26 0.00 TILE SETTER......................$ 17.00 0.00 TRUCK DRIVER: Dump Truck........$ 9.88 0.00 ---------------------------------------------------------------- TEAM0878-001 11/01/2007 Rates Fringes TRUCK DRIVER: Flatbed Truck.....$ 20.00 6.48 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in he matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION