General Decision Number: AR080164 12/26/2008 AR164 State: Arkansas Construction Type: Building Building Construction County: Faulkner County in Arkansas. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number Publication Date 0 12/26/2008 BOIL0069-001 01/01/2008 Rates Fringes BOILERMAKER......................$ 26.23 13.96 ---------------------------------------------------------------- CARP0216-001 07/01/2008 Rates Fringes MILLWRIGHT.......................$ 19.15 7.16 ---------------------------------------------------------------- ELEC0295-001 12/01/2008 Rates Fringes ELECTRICIAN (Including low voltage wiring for HVAC electrical and temperature controls; Excluding low voltage wiring for video cable and voice data) Electrical contracts over $1,500,000..................$ 24.41 9.47 Electrical contracts under $1,500,000..................$ 22.84 9.40 ---------------------------------------------------------------- ELEV0079-001 01/01/2008 Rates Fringes ELEVATOR MECHANIC................$ 31.92 16.285+A FOOTNOTE A: Vacation - 6%/under five years; 8%/over five years based on regular hourly rate for all hours worked. Paid Holidays - New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday After Thanksgiving Day; and Christmas Day. ---------------------------------------------------------------- IRON0321-003 05/01/2008 Rates Fringes IRONWORKER, REINFORCING..........$ 18.10 11.64 ---------------------------------------------------------------- PAIN0424-002 07/01/2008 Rates Fringes PAINTER (Brush and Roller), Excluding Drywall Finishing/Taping.................$ 14.41 5.34 ---------------------------------------------------------------- PLUM0155-003 05/01/2008 Rates Fringes PIPEFITTER, Including HVAC Pipe and System Installation.....$ 24.21 7.65 PLUMBER, Excluding HVAC Pipe Installation.....................$ 24.21 7.65 ---------------------------------------------------------------- ROOF0020-018 01/01/2008 Rates Fringes ROOFER...........................$ 14.50 .20 ---------------------------------------------------------------- SFAR0669-001 04/01/2008 Rates Fringes SPRINKLER FITTER (Fire Sprinklers)......................$ 23.25 12.30 ---------------------------------------------------------------- SHEE0036-012 06/01/2008 Rates Fringes SHEETMETAL WORKER (Including HVAC Duct Installation)..........$ 20.39 10.57 ---------------------------------------------------------------- SUAR2008-118 11/20/2008 Rates Fringes ABATEMENT WORKER: ASBESTOS (Removal From Floors, Ceilings, Mechanical Systems and Walls).......................$ 11.00 0.00 ASBESTOS WORKER/MECHANICAL INSULATOR........................$ 18.51 0.00 BRICKLAYER.......................$ 19.05 0.00 CARPENTER, Including Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Metal Stud Installation and Form Work........................$ 14.39 0.00 CEMENT MASON/CONCRETE FINISHER...$ 13.54 0.00 ELECTRICIAN (Low Voltage Wiring for Video Cable and Voice Data Only).................$ 19.17 0.00 GLAZIER..........................$ 16.49 2.42 IRONWORKER, ORNAMENTAL AND STRUCTURAL, Excluding Metal Building Erection................$ 16.96 6.80 LABORER: Common or General......$ 9.50 0.00 LABORER: Landscape..............$ 9.96 0.00 LABORER: Mason Tender - Brick...$ 9.51 0.00 LABORER: Mason Tender - Cement/Concrete..................$ 11.89 0.00 LABORER: Pipelayer..............$ 11.77 1.48 METAL BUILDING ERECTOR...........$ 12.33 1.77 OPERATOR: Asphalt Paver.........$ 15.02 0.00 OPERATOR: Asphalt Roller........$ 13.00 0.00 OPERATOR: Blade/Grader..........$ 16.50 0.00 OPERATOR: Bulldozer.............$ 14.81 0.00 OPERATOR: Crane.................$ 16.19 0.00 OPERATOR: Forklift..............$ 12.75 0.00 OPERATOR: Roller (Dirt and Grade Compaction)................$ 10.88 0.00 OPERATOR: Screed................$ 11.75 2.08 OPERATOR: Backhoe/Excavator/Trackhoe.......$ 11.80 0.00 OPERATOR: Front End Loader.......$ 13.73 1.98 OVERHEAD DOOR INSTALLER..........$ 14.52 1.35 PAINTER (Drywall Finishing/Taping Only)...........$ 14.26 0.00 PAINTER (Spray)..................$ 14.13 3.50 TILE FINISHER....................$ 12.56 0.00 TILE SETTER......................$ 17.50 0.00 TRUCK DRIVER: Dump Truck........$ 11.25 0.00 ---------------------------------------------------------------- TEAM0878-001 11/01/2007 Rates Fringes TRUCK DRIVER: Flatbed Truck.....$ 20.00 6.48 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in he matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION