U.S. DEPARTMENT OF LABOR OFFICE OF THE ASSISTANT SECRETARY FOR EMPLOYMENT STANDARDS WASHINGTON, D.C. 20210 JAN 29 1980 ALL AGENCY MEMORANDUM NO. 132 TO: ALL GOVERNMENT CONTRACTING AGENCIES AND THE DISTRICT OF COLUMBIA FROM: DONALD EDISBURG Assistant Secretary SUBJECT: Format Change for Some Wage Determination Decisions In the near future, the Department of Labor will begin using a new format for schedules of crafts and rates in some of its prevailing wage decisions issued pursuant to the Davis-Bacon And related acts. In the new format, fringe benefits will not be separately identified. Rather, they will be stated as a composite figure Which is the total hourly equivalent value-of fringe benefits found to be prevailing. Fringe benefits Which cannot be stated in monetary terms will be shown in foot- notes similar to those used in the current format. An example of the new schedule format is attached. It will be used as existing wage schedules are revised and updated. We are adopting the new format as a result of a ruling by the Wage Appeals Board that the Davis- Bacon Act does not require the payment of the a specific fringe benefits listed as prevailing on a particular wage determination. The Board essentially held that any bona fide fringe benefit, such as one listed in the Act, or cash payments in lieu of any or all of the fringe benefits listed on the Department's prevailing wage deter- minations could be used to meet a contractor's 2 fringe benefit obligations. Accordingly, we will no longer make the separate identification of fringe benefits when the new format is put into place. We also would like to take this opportunity to call to your attention the fact that we have had many complaints from individual contractors and associations representing them that wage decisions made part of the Invitations for Bids and the contractual documents are not legible and can result in inadvertent wage violations because of a confusion as to the exact amount required to be paid. To correct this problem, we are urging all contracting agencies to insure that the wage decisions appearing in the Federal Register which are disseminated to bidders are legible. In addi- tion, if the wage decision is a published general decision applicable to a wide geographic area or multiple types of construction, the contracting agency should consider extracting, for the bid and contract documents, only those portions of the wage decision that will apply to the project. Contractors should be advised on the application of the various schedules and rates by the con- tracting agency. Attachment GRAPHIC – “DAVIS - BACON INFOERATION SYSTEM WAGE SCHEDULE NUMBER WAGE SCHEDULE REPORT FEB 24, 1980”