![Lavon wetlands](images/lavonwetlands.jpg)
Mr. Jeffry A. Tripe
CESWF-PER-EE
U.S. Army Corps of Engineers
Fort Worth District
P.O. Box 17300-0300
819 Taylor Street
Phone: 817-886-1716
These documents require the Adobe PDF Reader. Click here to download the reader.
Recent long-range water supply planning efforts have identified significant increases in water demands that must be met through conservation and increased water supplies. During the past several years, water demand in the NTMWD service area, as well as in much of north central Texas, has increased significantly. NTMWD has investigated a number of options to obtain additional raw water supplies to meet the increasing demand. One of the more promising technologies is the indirect reuse of wastewater treatment plant effluent discharged to the river by diverting a portion of that river water into a constructed wetland for further treatment and returning the treated water to upstream lakes to augment the water supply.
- Notice of Availability
- The North Texas Municipal Water District (NTMWD) East Fork Water Reuse Project, Kaufman, Rockwall, and Collin Counties, Texas
- Appendices
Written comments on the EA will be accepted through March 8, 2006 by sending them directly to Jeffry A. Tripe, CESWF-PER-EE, P.O. Box 17300, Fort Worth, Texas, 76102-0300, or by e-mail at Jeffry.A.Tripe@usace.army.mil. Copies of the EA and Draft Finding of No Significant Impact may be requested in writing at the above address, by telephone at (817) 886-1716, or visit the Fort Worth District website at www.swf.usace.army.mil.