Search Options | ||||
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us |
PART 75—SAFEGUARDS ON NUCLEAR MATERIAL—IMPLEMENTATION OF US/IAEA AGREEMENTFull Text Version (68.89 KB) General Provisions Sec. 75.6 Facility and location reporting. 75.7 Notification of IAEA safeguards. 75.9 Information collection requirements: OMB approval. Facility and Location Information 75.10 Installation information. 75.11 Installation information. 75.12 Communication of information to IAEA. Material Accounting and Control for Facilities Reports 75.32 Initial inventory report. 75.34 Inventory change reports. 75.35 Material status reports. Advanced Notification and Expenses 75.43 Circumstances requiring advance notification. 75.44 Timing of advance notification. 75.45 Content of advance notification. Enforcement Authority: Secs. 53, 63, 103, 104, 122, 161, 68 Stat. 930, 932, 936, 937, 939, 948, as amended (42 U.S.C. 2073, 2093, 2133, 2134, 2152, 2201); sec. 201, 88 Stat. 1242, as amended (42 U.S.C. 5841); sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note). Section 75.4 also issued under secs. 135, 141, Public Law 97–425, 96 Stat. 2232, 2241 (42 U.S.C. 10155, 10161). Source: 45 FR 50711, July 31, 1980, unless otherwise noted. [73 FR 78607, Dec. 23, 2008] |
Privacy Policy |
Site Disclaimer |