Home > Facility Info Finder > Sites Undergoing Decommissioning > Uranium Recovery Facilities > Sequoyah Fuels Corporation Site – Environmental Review
Sequoyah Fuels Corporation Site – Environmental Review
Sequoyah Fuels
Corporation Site in Gore,
Oklahoma
On this page:
Application Information:
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Environmental
Report
Surface Reclamation Plan
Groundwater
Corrective Action Plan Information
Schedule for the
Sequoyah Fuels Corporation Site ER Review and EIS Preparation*
Actions |
Date |
Surface Reclamation Plan Received |
January 2003 |
Groundwater Corrective Action Plan Received |
June 2003 |
Environmental Report Received |
October 2006 |
Draft EIS/FRN Availability |
September 21, 2007 |
DEIS Public Meeting (Gore, OK) |
October 16, 2007 |
Draft EIS Public Comment Period Ends |
November 5, 2007 |
Issue Final EIS to EPA |
April 2008 |
* These schedules
reflect work plans that are subject to change. Subsequent meetings and
comment periods may change based on the revised schedule. This work plan will
be updated on a periodic basis. Please see the NRC Public Meetings Page or
contact the listed PM for the latest information on meetings and status.
Public Involvement
-
The public is
encouraged to participate in the environmental review process through public
meetings, and public comment periods on rules, guidance, and other documents.
Comments to the NRC on the Draft Environmental Impact Statement (DEIS) may be
submitted by e-mail or regular mail as follows:
By regular mail - postmarked by November 5, 2007
Chief, Rules Review and Directives Branch,
U.S. Nuclear Regulatory Commission
Mail Stop T-6D59
Washington, DC 20555-0001
By email - received by midnight November 5, 2007 "Sequoyah Fuels DEIS" in the subject line
Send to NRCREP.Resource@nrc.gov
- On October 16, 2007,
the NRC staff conducted a public meeting for comment on the Draft Environmental
Impact Statement (DEIS) for the licensee’s surface reclamation and
groundwater corrective action plans. Several stakeholders were in attendance at the meeting. Links to the
meeting transcript and presentation are provided below:
Draft Environmental Impact Statement (DEIS): NUREG-1888
DEIS Meeting Presentation
Public
Meeting for Comment on
the DEIS - Official Transcript
Project Managers for Sequoyah Fuels Corporation
Site Reviews
NRC PMs for Sequoyah Fuels Corporation Site |
Environmental Review |
Allen Fetter |
Surface Reclamation Plan Review |
Myron Fliegel |
Groundwater Corrective Action Plan Review |
Stephen Cohen |
|