Home > About NRC
> How We Regulate > Licensing > Topical Reports > Approved in FY2007
Topical Reports Approved in FY2008
Publicly available topical reports
may be found in the Agencywide Document
Access and Management System.
List of Reports Approved in FY2008
On this page
AREVA NP, Inc. Reports
Task ID (TAC No.) |
Title |
MC4261 |
BAW-10247(P), Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors
Final NRC SE: 2/12/08 ML080350227
Accepted Version: Expected 5/08 |
Bechtel Reports
Task ID (TAC No.) |
Title |
MD5365 |
BQ-TOP-1, 2007 Edition, Revision 1, “Quality Assurance Program for Nuclear Power Plants
Final NRC SE: 1/22/08, ML080090429
Accepted Version: |
Boiling Water Reactor Owners’ Group (BWROG) Reports
Electric Power Research Institute (EPRI)/Nuclear Energy Institute (NEI) Reports
GE Hitachi Nuclear Energy Americas LLC (GHNE)/Global Nuclear Fuel (GNF)
Task ID (TAC No.) |
Title |
MC1737 |
NEDC-33075P, Revision 5, “General Electric Boiling Water Reactor Detect and Suppress Solution – Confirmation Density”
Final NRC SE: 11/27/07, ML062640346
Accepted Version: 1/25/08 |
MD0277 |
NEDC-33173P, Applicability of GE Methods to Expanded Operating Domains
Final NRC SE: 1/17/08, ML073340231
Accepted Version: |
MD5742 |
GESTAR Administrative Amendment 30 to implement referencing of NEDC-33173P
Final NRC SE: 2/11/08, ML080310007
Accepted Version: Expected April 2008 |
PWR Owners Group (formerly Westinghouse Owners Group - WOG) Reports
Task ID (TAC No.) |
Title |
MC9607 |
BAW-10179(P), Revision 7, “Safety Criteria and Methodology for Acceptable Cycle Reload Analyses”
Final NRC SE: 1/9/08, ML080080361
Accepted Version: Expected 4/08 |
MD2189 |
WCAP-16406, Evaluation of Downstream Sump Debris
Final NRC SE: 12/21/07 ML073520767
Accepted Version: Expected 3/08; PWROG checking status |
MD3834 |
WCAP-15791-P, Rev. 2, Risk-Informed CIV Completion Times
Final NRC SE: 2/13/08, ML080170680
Accepted Version: Expected 5/08 |
MC4524 |
WCAP-15981-NP,"Post Accident Monitoring Instrumentation Redefinition"
Final NRC SE: 2/29/08 ML080380346
Accepted Version: Expected 5/08 |
MD4241 |
BAW-2308, Rev. 2, Initial RTNDT of Linde 80 Weld Materials
Final NRC SE: 3/24/08 ML080770349
Accepted Version: Expected 6/08 |
MD1119 |
WCAP-16530-NP, Evaluation of Post Accident Chemical Effects in Containment Sump
Final NRC SE: 12/21/08 ML073521294
Accepted Version: PWROG notified NRC staff of error in TR 3/18/08, NRC staff notified the PWROG the change was acceptable on 3/25/08. PWROG to submit by 3/31/08. |
Westinghouse Vendor Reports
Task ID (TAC No.) |
Title |
MD2952 |
WCAP-16606, Supplement 2 to BISON Topical Report
Final NRC SE: 10/22/07 ML072670542
Accepted Version: NA |
MD3184 |
Addendum 2 to WCAP-14565-P-A, Extended Application of ABB-NV Correlation and Modified ABB-NV Correlation
Final NRC SE: 2/14/08 ML080360381
Accepted Version: NA |
Updated March 27, 2008 ML073050451 |