|
Home
> About NRC
> How We Regulate > Licensing > Topical Reports > Under Review By the NRC
Topical Reports Under Review
List of Reports Under Review as of April 28, 2008
On this page:
AREVA NP, INC. Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target Date |
Remarks (if applicable) |
MC9767 |
AREVA - BAW-10255 (P), Rev. 2, “Cycle-Specific DIVOM Methodology using the RAMONA5-FA Code” |
1/30/06 |
No AL issued before start of review. |
11/09/07
Revised 12/03/07* |
|
MC9766 |
AREVA - ANP-10262 (P), Rev. 0, “Enhanced Option III Long Term Stability Solution” |
1/31/06 |
No AL issued before start of review. |
11/9/07
Revised 12/3/07* |
|
*= actual draft SE issuance |
Boiling Water Reactor Owners' Group (BWROG) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target Date |
Remarks (if applicable) |
MD1764 |
NEDO-33163, High Burnup BWR Fuel Rod Gap Release Fractions |
3/30/06 |
8/4/06 |
TBD -review on hold |
RAI response received 5/22/07. |
MD2693 |
NEDC-33178P, Rev. 0, GE Method for Development of Reactor Pressure Vessel P/T Curves |
7/28/06 |
11/9/06 |
4/30/08
Delayed - waiting on Supp. RAI response. |
RAI response received 11/15/07. |
MD2917 |
NEDO-33148, Rev. 2, Separation of LOOP from LBLOCA |
8/25/06 |
3/1/07 |
TBD after May 2008 meeting. |
RAI response received 9/28/07 |
MD5743 |
NEDE-33213P, ODYSY Application for Stability Licensing Calculations |
6/5/07 |
1/31/08 |
05/30/08 |
RAI response received 3/28/08. |
MD6697 |
NEDO-33349, Revision 1, BWR Application to RG 1.97, Revision 4 |
8/30/2007 |
3/26/08 |
4/30/09 |
|
MD8146 |
NEDC-33347P Revision 0, Containment Overpressure Credit for Net Positive Suction Head (NPSH) |
2/15/08 |
4/23/08 |
6/12/09 |
|
*= actual draft SE issuance |
Electric Power Research Institute (EPRI)/Nuclear Energy Institute (NEI) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MC9663 |
NEI 94-01, Rev. 1, “Extension of ILRT Interval” |
12/19/05 |
5/10/06 |
12/05/07
Revised 4/30/08* |
RAI response submitted on 05/25/07 |
MD3236 |
EPRI TR-103237, Motor-Operated Valve Performance Prediction Methodology Software, Addenda 3, 4, 5, 6 and 7 |
1/6/06 |
11/14/06 |
3/14/08
A revised Target Date TBD |
1st round of RAIs (on the TR) issued 4/23/07.
1st round of RAI responses submitted on 9/27/07. |
MD4229 |
WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process – Wolf Creek Generating Station |
9/25/06 |
4/3/07 |
6/26/08 |
Fee waiver acceptance issued 12/26/06
RAIs issued on 8/27/07.
RAI responses provided on 10/22/07. |
MD5134 |
NEI WCAP-16294-NP, Rev. 0, “Risk-Informed Evaluation of Changes to Technical Specification Required Endstates For Westinghouse NSSS PWRs” |
9/9/05 |
|
3/28/08 |
Fee waiver acceptance issued 1/10/03 |
MD6111 |
NEI 04-10, Rev. 1, Risk-Informed Technical Specification Initiative 5B Risk-Informed Method for Control of Surveillance Frequencies |
4/19/07 |
|
4/14/08 |
Final SE issued on 9/19/07. |
MD8005 |
MRP-169, Technical Bases for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs |
1/9/08 |
3/25/08 |
8/22/08 |
RAI’s issued on 4/7/08 - ML080940280
RAI responses expected by 4/30/08 |
*= actual draft SE issuance |
GE Hitachi Nuclear Energy Americas LLC (GHNE)/Global Nuclear Fuel (GNF)
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD2569 |
NEDE-32906P, Supp. 3, Migration to TRACG04/PANAC11 from TRACG02/PANAC10 for TRACG AOO and ATWS Overpressure Transients |
5/26/06 |
11/7/06 |
TBD once RAI responses received. |
RAI response delayed. Partial responses - received on 12/20/07.
Remaining responses expected 4/30/08. |
MD3119 |
NEDE-33284P, Rev. 0, Marathon 5S Control Rod Assembly |
9/27/06 |
6/13/07 |
TBD, staff evaluating RAI responses and revised LTR. |
LTR revision and RAI responses received 11/19/07. |
MD4114 |
NEDC-33256P, NEDC-33257P, and NEDC-33258P, The PRIME Model for Analysis of Fuel Rod Thermal-Mechanical Performance |
1/19/07 |
6/13/07 |
7/31/08 |
Draft Partial RAIs responses sent 4/1/08, remaining draft responses expected by 4/18/08. |
MD6241 |
NEDO-32950, Revision 1, “Compilation of Improvements to GENE’s SAFER ECCS-LOCA Evaluation Model” |
7/31/07 |
TBD |
TBD |
|
TBD |
GESTAR II Amendment 31, Stability Analysis and SRLR Template Update |
12/7/07 |
TBD |
TBD |
|
*= actual draft SE issuance |
HF Controls Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD8462 |
PP901-000-01, Revision C, HFC-6000 Safety System |
3/5/08 |
9/16/08 |
12/4/09 |
|
*= actual draft SE issuance |
PWR Owners’ Group (formerly Westinghouse Owners’ Group - WOG) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MC9768 |
WCAP-16168-NP, Rev. 1, “Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval” |
1/26/06 |
9/19/06 |
3/6/08* |
|
MD5891 |
WCAP-16793-NP, Rev. 0, Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in Recirculating Fluid |
6/4/07 |
9/7/07 |
3/7/08* |
|
MD6206 |
WCAP-15830-P, Revision 1, “Staggered Integrated Engineered Safety Features and Loss of Offsite Power Testing at CE NSSS Plants” |
7/31/07 |
11/15/07 |
5/31/08 |
|
MD7404 |
BAW-2374, Rev. 2, Risk Informed Assessment of OTSG loads due to breaks in RCS |
1/4/07 |
-- |
-- |
-- |
MD8138 |
WCAP-16125-NP, Revision 1, "Justification for Risk-Informed Modifications to Selected Technical Specifications for Conditions Leading to Exigent Plant Shutdown" |
1/7/08 |
TBD |
TBD |
|
*= actual draft SE issuance |
Sargent & Lundy Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD6887 |
SL-TR-1, Rev 20, “Nuclear QA Program” |
9/21/07 |
TBD |
6/9/08 |
|
*= actual draft SE issuance |
Westinghouse Vendor Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD2953 |
WCAP-16608, Westinghouse Containment Analysis Methodology |
8/29/06 |
1/4/07 |
6/13/08 |
|
MD3959 |
WCAP-16081, Addendum 1, SVEA-96 Optima2 CPR Correlation (D4) |
11/28/06 |
5/23/07 |
5/30/08 |
|
MD5258 |
WCAP-16747-P, Revision 0, POLCA-T: System Analysis Code with Three-Dimensional Core Model |
4/26/07 |
9/10/07 |
6/30/08 |
|
MD6380 |
WCAP-16608-P, Addendum 1, Revision 0, “Appendix C – PWR LOCA Mass and Energy Release Input Calculational Methodology |
7/31/07 |
10/26/07 |
6/6/08 |
Expect RAI response 4/25/08 |
MD6383 |
WCAP-16081-P, Addendum 2, Revision 0, “SVEA-96 OPTIMA2 CPR Correlation (D4): Modified R-factors for part-length rods |
7/31/07 |
11/15/2007 |
1/15/09 |
|
MD7230 |
WCAP-16766-P, “Westinghouse Next Generation Correlation (WNG-1) for Predicting Critical Heat Flux in Rod Bundles with Split Van Mixing Grids” |
10/26/07 |
1/24/08 |
1/15/09 |
RAIs sent by tech branch 4/17/8 |
MD7734 |
WCAP-16865, BWR ECCS Methodology |
12/20/07 |
9/30/08 |
3/31/09 |
|
MD7989 |
WCAP-16182, CR 99 Licensing Report |
11/2/08* |
2/15/08 |
1/16/09 |
AL in concurrence |
MD8540 |
WCAP-16498, 17x17 NGF Ref Core Report |
4/3/08 |
5/18/08 |
TBD |
|
*= actual draft SE issuance |
Boiling Water Reactor Vessel and Internals Project (BWRVIP) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date (Some reports are
not applicable to this process) |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MA4468 |
BWRVIP-62, "Technical Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection"
|
3/7/00 |
N/A |
3/17/08 |
|
MB3948 |
BWRVIP-97, "Guidelines for Performing Weld Repairs to Irradiated BWR Internals" |
11/29/01
ML013340594 |
N/A |
8/31/08 |
|
MC2293 |
BWRVIP-03, Rev. 6, "BWR Vessel and Internals Project, Reactor Pressure Vessel and Internals Examination Guidelines" |
1/6/04 |
N/A |
5/30/08 |
|
MC7334 |
BWRVIP-139, “Steam Dryer Inspection and Flaw Evaluation Guidelines” |
5/10/05 |
6/30/05 |
6/15/07 changed to 5/23/08
revised to
7/11/08 |
|
MC7448 |
BWRVIP-06-A, “Consideration of Loose Parts” |
6/26/05 |
TBD |
5/30/08 changed to 7/11/08 |
|
MD3618 |
BWRVIP-158, Flaw Proximity Rules for Assessment of BWR Internals |
9/28/06 |
1/18/07 sent
2nd round 3/11/08 |
5/1/08 |
RAI dated 5/10/07 |
MD3762 |
BWRVIP Response to NRC SE of BWRVIP-84, Guidelines for Selection and Use of Materials for Repairs to BWR Internals |
12/5/06 |
N/A` |
8/30/08 |
|
MD4433 |
BWRVIP-76, BWR Core Shroud Inspection and Flaw Evaluation Guidelines for License Renewal Evaluation |
7/27/06 |
N/A |
8/30/08 |
|
MD6254 |
BWRVIP-59-A, Evaluation of Crack Growth in BWR Nickel Based Austenitic Alloys in RPV Internals |
6/21/07 |
N/A |
3/31/08 |
|
MD6255 |
BWRVIP-173, Evaluation of Chemistry Data for BWR Vessel Nozzle Forging Materials |
7/19/07 |
10/12/07 |
2/20/09 |
|
MD7957 |
BWRVIP-183, Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines |
|
|
|
|
* = actual draft SE issuance |
Updated: April 28, 2008 |
|