Sequoyah 1

3Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned scrams 0 0 0 0 0 1.0 0 0
Critical hours 2209.0 2159.0 2184.0 2208.0 1169.4 2145.1 2184.0 2208.0
                 
Indicator value 0 0 0 0 0 0.9 0.9 0.9


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned power changes 0 0 0 0 0 0 0 0
Critical hours 2209.0 2159.0 2184.0 2208.0 1169.4 2145.1 2184.0 2208.0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value       0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -2.00E-07 -2.00E-07 1.60E-07 1.50E-07 1.70E-07 1.70E-07 -2.00E-07 -2.90E-07
URI (ΔCDF) -1.30E-06 -1.30E-06 -1.40E-06 -1.40E-06 -1.40E-06 -1.30E-06 -1.30E-06 6.80E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.50E-06 -1.50E-06 -1.24E-06 -1.25E-06 -1.23E-06 -1.13E-06 -1.50E-06 3.90E-07

Licensee Comments:

3Q/08: The risk cap is not invoked.

2Q/08: Risk Cap Invoked. Revised all quarterly data within the 3 yr reporting window for the following corrections. Planned unavailable hours due to SSPS testing on U1 were removed from the U2 indicator and vice versa. Unavailable hours included while the applicable unit was not critical were subtracted. Also, baseline planned unavailability was updated for these same conditions. These changes made in accordance with Sequoyah PER 135288. BPK7/11/08

1Q/08: Risk Cap Invoked. An error has been identified in baseline planned unavailability and critical hours. The baseline planned unavailability will increase once corrected adding further margin in the UAI derivation. This correction will be made prior to next quarter's reporting.

4Q/07: Risk Cap Invoked. The following changes have been made during the reporting quarter. PRA parameters for FVURC, FVUAP, UAP updated to reflect numbers in the basis document. Failure records 1057, 1088, and 1006 have been changed as a result of a re-evaluation.

3Q/07: Risk Cap Invoked. failure record 1088 updated for MSPI failure no. Failed components were outside the monitoring boundary. BPK 1/16/08






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 2.60E-08 3.60E-08 6.20E-08 1.10E-07 1.10E-07 9.30E-08 8.40E-08 9.20E-08
URI (ΔCDF) 5.00E-07 5.00E-07 5.00E-07 5.00E-07 -1.70E-07 -1.70E-07 -1.70E-07 -1.70E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 5.26E-07 5.36E-07 5.62E-07 6.10E-07 -6.00E-08 -7.70E-08 -8.60E-08 -7.80E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -2.20E-08 -2.20E-08 -2.20E-08 -2.20E-08 -2.30E-08 -2.00E-08 -2.00E-08 -2.00E-08
URI (ΔCDF) -6.60E-08 -6.40E-08 -6.40E-08 -6.40E-08 -8.90E-08 -6.60E-08 -6.40E-08 -6.40E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -8.80E-08 -8.60E-08 -8.60E-08 -8.60E-08 -1.12E-07 -8.60E-08 -8.40E-08 -8.40E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 9.10E-08 8.80E-08 1.50E-07 1.90E-07 1.90E-07 1.90E-07 2.60E-07 2.50E-07
URI (ΔCDF) 1.30E-07 1.30E-07 1.30E-07 -3.70E-07 -3.70E-07 -3.70E-07 -3.70E-07 -3.70E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.21E-07 2.18E-07 2.80E-07 -1.80E-07 -1.80E-07 -1.80E-07 -1.10E-07 -1.20E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -3.00E-06 -3.10E-06 -3.10E-06 -3.10E-06 -3.10E-06 -3.00E-06 -3.10E-06 -3.10E-06
URI (ΔCDF) -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.22E-06 -3.32E-06 -3.32E-06 -3.32E-06 -3.32E-06 -3.22E-06 -3.32E-06 -3.32E-06

Licensee Comments:

3Q/08: Changed PRA Parameter(s). Adjusted planned unavailability baselines for non-routine planned maintenance on ERCW pumps.






Link to Notes

Reactor Coolant System Activity 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum activity 0.006689 0.006602 0.007064 0.007125 0.007427 0.007719 0.007894 0.007921 0.007870 0.007976 0.008524 0.008710
Technical specification limit 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
                         
Indicator value 1.9 1.9 2.0 2.0 2.1 2.2 2.3 2.3 2.2 2.3 2.4 2.5
Reactor Coolant System Activity 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum activity 0.006488 0.001952 0.001923 0.003438 0.002020 0.002169 0.002079 0.002129 0.002289 0.002971 0.003110 0.002837
Technical specification limit 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
                         
Indicator value 1.9 0.6 0.5 1.0 0.6 0.6 0.6 0.6 0.7 0.8 0.9 0.8

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum leakage 0.050 0.050 0.040 0.030 0.030 0.030 0.050 0.070 0.080 0.080 0.070 0.080
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.5 0.5 0.4 0.3 0.3 0.3 0.5 0.7 0.8 0.8 0.7 0.8
Reactor Coolant System Leakage 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum leakage 0.060 0.010 0.020 0.010 0.020 0.020 0.020 0.050 0.040 0.040 0.030 0.040
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.6 0.1 0.2 0.1 0.2 0.2 0.2 0.5 0.4 0.4 0.3 0.4

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful opportunities 44.0 0 24.0 10.0 30.0 4.0 11.0 42.0
Total opportunities 48.0 0 26.0 10.0 32.0 4.0 12.0 43.0
                 
Indicator value 94.4% 94.0% 93.8% 93.5% 95.0% 94.9% 94.7% 94.3%

Licensee Comments: none






Link to Notes

ERO Drill Participation 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Participating Key personnel 81.0 75.0 82.0 93.0 88.0 83.0 73.0 87.0
Total Key personnel 81.0 76.0 82.0 93.0 88.0 83.0 75.0 87.0
                 
Indicator value 100.0% 98.7% 100.0% 100.0% 100.0% 100.0% 97.3% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful siren-tests 855 750 854 779 964 754 753 751
Total sirens-tests 864 756 864 864 972 756 756 756
                 
Indicator value 99.2% 99.2% 99.0% 96.7% 96.8% 97.0% 97.1% 99.4%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Security information not publicly available.



 
 
 
 