Oconee 2

3Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned scrams 0 1.0 0 0 0 1.0 0 0
Critical hours 2209.0 2102.7 1420.1 2208.0 2209.0 2172.9 2157.2 2208.0
                 
Indicator value 0.8 1.6 0.9 0.9 0.9 0.9 0.8 0.8


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned power changes 0 0 0 0 0 0 0 1.0
Critical hours 2209.0 2102.7 1420.1 2208.0 2209.0 2172.9 2157.2 2208.0
                 
Indicator value 0 0 0 0 0 0 0 0.8

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value       0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 5.40E-06 5.40E-06 5.10E-06 6.50E-07 5.10E-07 1.00E-07 1.10E-07 1.10E-07
URI (ΔCDF) -1.60E-06 -1.60E-06 -1.60E-06 -1.20E-06 -1.60E-06 -1.40E-06 -1.40E-06 -2.00E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 3.80E-06 3.80E-06 3.50E-06 -5.50E-07 -1.09E-06 -1.30E-06 -1.29E-06 -1.89E-06

Licensee Comments:

3Q/08: Oconee Problem Identification Process (PIP) 08-05623 identified that the MSPI baseline for Emergency AC Power (EAP) was not revised in 2Q2008 to subtract hours included from a previous refurbishment outage. By not removing these refurbishment hours, the EAP MSPI results reported for 2Q2008 and 3Q2008 are non-conservative pending the CDE software changes to allow revisions to current and past quarters. The baseline is corrected for 4Q2008. The Oconee Emergency AC Power Units remain Green with adequate margin to White.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -5.50E-08 -5.60E-08 -5.60E-08 -5.60E-08 -5.60E-08 -6.20E-08 -6.20E-08 -6.20E-08
URI (ΔCDF) -1.70E-07 -1.70E-07 1.50E-07 2.50E-07 2.50E-07 2.50E-07 2.50E-07 2.50E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.25E-07 -2.26E-07 9.40E-08 1.94E-07 1.94E-07 1.88E-07 1.88E-07 1.88E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 1.60E-07 4.40E-07 1.80E-07 1.90E-07 2.90E-07 3.60E-07 4.00E-07 4.20E-07
URI (ΔCDF) -9.00E-08 1.60E-07 1.60E-07 1.60E-07 1.60E-07 1.60E-07 1.60E-07 1.60E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 7.00E-08 6.00E-07 3.40E-07 3.50E-07 4.50E-07 5.20E-07 5.60E-07 5.80E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 5.20E-08 9.80E-08 1.00E-07 1.50E-07 1.90E-07 2.10E-07 3.60E-07 3.50E-07
URI (ΔCDF) -1.30E-07 -1.30E-07 -1.30E-07 -1.30E-07 -1.30E-07 -1.30E-07 -1.30E-07 -1.30E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -7.80E-08 -3.20E-08 -3.00E-08 2.00E-08 6.00E-08 8.00E-08 2.30E-07 2.20E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 1.10E-07 1.00E-07 9.90E-08 2.20E-08 -2.30E-08 -3.80E-08 -6.00E-08 -5.80E-08
URI (ΔCDF) -4.20E-08 -4.20E-08 -4.20E-08 -4.20E-08 -4.20E-08 -4.20E-08 -4.20E-08 -4.20E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 6.80E-08 5.80E-08 5.70E-08 -2.00E-08 -6.50E-08 -8.00E-08 -1.02E-07 -1.00E-07

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum activity 0.002018 0.002008 0.002019 0.002177 0.015470 0.004183 0.002340 0.000375 0.001405 0.000758 0.000693 0.000816
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.2 0.2 0.2 0.2 1.5 0.4 0.2 0 0.1 0.1 0.1 0.1
Reactor Coolant System Activity 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum activity 0.000962 0.001070 0.000963 0.000978 0.000874 0.001010 0.001020 0.001063 0.001170 0.001176 0.001116 0.001276
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum leakage 0.155 0.118 0.194 0.168 0.161 0.212 0.128 0.021 0.087 0.116 0.117 0.202
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.6 1.2 1.9 1.7 1.6 2.1 1.3 0.2 0.9 1.2 1.2 2.0
Reactor Coolant System Leakage 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum leakage 0.134 0.109 0.094 0.087 0.119 0.102 0.115 0.080 0.132 0.109 0.088 0.146
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.3 1.1 0.9 0.9 1.2 1.0 1.2 0.8 1.3 1.1 0.9 1.5

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful opportunities 7.0 39.0 29.0 26.0 26.0 71.0 18.0 31.0
Total opportunities 7.0 41.0 29.0 28.0 26.0 75.0 23.0 34.0
                 
Indicator value 93.1% 94.0% 94.5% 93.5% 94.4% 95.3% 93.2% 93.9%

Licensee Comments: none






Link to Notes

ERO Drill Participation 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Participating Key personnel 159.0 155.0 159.0 156.0 147.0 136.0 134.0 137.0
Total Key personnel 162.0 161.0 171.0 169.0 153.0 142.0 141.0 144.0
                 
Indicator value 98.1% 96.3% 93.0% 92.3% 96.1% 95.8% 95.0% 95.1%

Licensee Comments: none






Link to Notes

Alert & Notification System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful siren-tests 1688 1684 1748 1753 1623 1811 1619 1622
Total sirens-tests 1690 1690 1755 1755 1625 1820 1625 1625
                 
Indicator value 99.8% 99.7% 99.7% 99.8% 99.8% 99.7% 99.7% 99.7%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Security information not publicly available.



 
 
 
 