Indian Point 2

3Q/2008 Performance Indicators

Licensee's General Comments: Some SI and RHR unavailability hours for previous reporting periods were revised to include all applicable hours after a verification review determined some unavailability hours for SI and RHR had not been included based on component tag out times and actual component availability. Total unavailable hours added covering the period 3Q06-2Q08 for the follow components: Unit 2: 21 SI=1.08, 22 SI=1.78, 23 SI=6.57 21 RHR=1.18, 22 RHR=3.5



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned scrams 1.0 1.0 0 0 0 1.0 1.0 0
Critical hours 2186.0 2144.9 2184.0 2208.0 2209.0 1989.3 1724.9 2208.0
                 
Indicator value 2.6 2.6 2.4 1.6 0.8 0.8 1.7 1.7


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned power changes 1.0 0 1.0 0 0 0 0 0
Critical hours 2186.0 2144.9 2184.0 2208.0 2209.0 1989.3 1724.9 2208.0
                 
Indicator value 1.8 1.8 2.4 1.6 0.8 0.8 0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Scrams with complications 0 1.0 0 0 0 0 0 0
                 
                 
Indicator value       1.0 1.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 6.30E-07 6.40E-07 7.60E-07 7.90E-07 4.90E-07 5.30E-07 6.70E-07 6.30E-07
URI (ΔCDF) -3.70E-06 -3.70E-06 -3.70E-06 -3.60E-06 -3.80E-06 -3.90E-06 -3.90E-06 -3.90E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.07E-06 -3.06E-06 -2.94E-06 -2.81E-06 -3.31E-06 -3.37E-06 -3.23E-06 -3.27E-06

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 3.20E-10 3.00E-10 2.40E-10 1.70E-10 4.40E-11 -9.80E-11 -1.20E-10 -1.20E-10
URI (ΔCDF) 3.60E-09 3.60E-09 3.60E-09 3.60E-09 2.80E-09 2.80E-09 2.80E-09 2.80E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 3.92E-09 3.90E-09 3.84E-09 3.77E-09 2.84E-09 2.70E-09 2.68E-09 2.68E-09

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 3.50E-07 3.30E-07 2.70E-07 2.50E-07 2.30E-07 1.90E-07 2.40E-07 4.10E-07
URI (ΔCDF) -1.20E-06 -1.20E-06 -1.20E-06 -1.10E-06 -1.10E-06 -1.20E-06 -1.20E-06 -1.20E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -8.50E-07 -8.70E-07 -9.30E-07 -8.50E-07 -8.70E-07 -1.01E-06 -9.60E-07 -7.90E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -5.60E-09 -5.60E-09 -5.60E-09 -5.60E-09 -1.30E-09 -1.10E-09 -9.90E-10 -9.60E-10
URI (ΔCDF) 5.40E-09 4.30E-08 4.30E-08 4.30E-08 3.50E-08 9.10E-09 7.30E-09 8.00E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.00E-10 3.74E-08 3.74E-08 3.74E-08 3.37E-08 8.00E-09 6.31E-09 7.04E-09

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 2.60E-09 2.50E-09 -1.00E-08 -9.80E-09 -7.90E-09 -6.00E-09 3.70E-08 4.20E-08
URI (ΔCDF) 4.70E-08 4.70E-08 5.80E-08 5.70E-08 4.90E-08 4.60E-08 7.10E-08 7.10E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 4.96E-08 4.95E-08 4.80E-08 4.72E-08 4.11E-08 4.00E-08 1.08E-07 1.13E-07

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum activity 0.001410 0.001480 0.001600 0.001540 0.001580 0.001650 0.001810 0.001740 0.001660 0.001840 0.001850 0.001930
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Reactor Coolant System Activity 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum activity 0.002050 0.002020 0.002040 0.002140 0.002070 0.002220 0.000449 0.000501 0.000717 0.000595 0.000579 0.000614
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.2 0.2 0.2 0.2 0.2 0.2 0 0.1 0.1 0.1 0.1 0.1

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum leakage 0.011 0.020 0.010 0.070 0.020 0 0.030 0.020 0.030 0.610 0.010 0.010
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.1 0.2 0.1 0.7 0.2 0 0.3 0.2 0.3 6.1 0.1 0.1
Reactor Coolant System Leakage 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum leakage 0.010 0.010 0.010 0.040 0.050 0.070 0.010 0.620 0.030 0.020 0.020 0.030
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.1 0.1 0.1 0.4 0.5 0.7 0.1 6.2 0.3 0.2 0.2 0.3

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful opportunities 11.0 19.0 57.0 72.0 66.0 28.0 50.0 90.0
Total opportunities 14.0 20.0 58.0 75.0 71.0 28.0 54.0 92.0
                 
Indicator value 95.6% 96.2% 97.1% 96.6% 96.3% 96.5% 95.7% 95.4%

Licensee Comments: none






Link to Notes

ERO Drill Participation 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Participating Key personnel 104.0 106.0 114.0 113.0 111.0 114.0 99.0 94.0
Total Key personnel 108.0 108.0 117.0 116.0 111.0 114.0 99.0 94.0
                 
Indicator value 96.3% 98.1% 97.4% 97.4% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful siren-tests 885 728 965 536 618 786 627 486
Total sirens-tests 888 732 974 540 625 793 637 488
                 
Indicator value 98.9% 99.4% 99.4% 99.4% 99.2% 99.1% 98.9% 99.0%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 1 1 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Security information not publicly available.



 
 
 
 