Grand Gulf 1

3Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned scrams 0 0 1.0 1.0 0 2.0 0 0
Critical hours 2209.0 1843.0 1817.7 1863.9 2209.0 2020.5 2184.0 1988.0
                 
Indicator value 0 0 0.9 1.8 1.8 3.5 2.5 1.7


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned power changes 1.0 0 0 1.0 2.0 2.0 2.0 0
Critical hours 2209.0 1843.0 1817.7 1863.9 2209.0 2020.5 2184.0 1988.0
                 
Indicator value 1.6 0.8 0.9 1.8 2.7 4.4 5.9 5.0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value       0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 4.40E-08 5.90E-08 9.00E-08 9.80E-08 1.00E-07 6.40E-08 6.40E-08 3.10E-08
URI (ΔCDF) 3.40E-07 5.30E-07 3.90E-07 5.40E-07 5.10E-07 5.10E-07 5.10E-07 3.40E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 3.84E-07 5.89E-07 4.80E-07 6.38E-07 6.10E-07 5.74E-07 5.74E-07 3.71E-07

Licensee Comments:

3Q/08: Revision 3 of the GGNS PRA was issued on June 30, 2008. Revision 3 was a major update that included the update of plant specific data, initiator frequencies (both plant specific and generic), common cause analyses, human reliability analyses; the addition of several new initiators; and changes to the modeling of offsite power. The revision has resulted in a new overall core damage frequency, changes to the Fussell-Vesely importance of all of the MSPI related basic events and changes to the probability of many of the MSPI related basic events.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -6.00E-10 5.60E-09 4.90E-09 -2.80E-08 -4.40E-08 4.90E-07 4.90E-07 1.80E-07
URI (ΔCDF) 1.50E-08 7.60E-09 1.10E-08 2.60E-08 2.80E-08 2.00E-07 1.90E-07 6.60E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.44E-08 1.32E-08 1.59E-08 -2.00E-09 -1.60E-08 6.90E-07 6.80E-07 2.46E-07

Licensee Comments:

3Q/08: Revision 3 of the GGNS PRA was issued on June 30, 2008. Revision 3 was a major update that included the update of plant specific data, initiator frequencies (both plant specific and generic), common cause analyses, human reliability analyses; the addition of several new initiators; and changes to the modeling of offsite power. The revision has resulted in a new overall core damage frequency, changes to the Fussell-Vesely importance of all of the MSPI related basic events and changes to the probability of many of the MSPI related basic events.






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -4.10E-08 -4.20E-08 1.00E-07 9.50E-08 9.00E-08 3.90E-08 9.20E-09 -1.50E-09
URI (ΔCDF) -4.00E-07 -3.90E-07 -4.00E-07 -3.90E-07 -3.90E-07 -3.80E-07 -3.90E-07 -2.10E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -4.41E-07 -4.32E-07 -3.00E-07 -2.95E-07 -3.00E-07 -3.41E-07 -3.81E-07 -2.12E-07

Licensee Comments:

3Q/08: Revision 3 of the GGNS PRA was issued on June 30, 2008. Revision 3 was a major update that included the update of plant specific data, initiator frequencies (both plant specific and generic), common cause analyses, human reliability analyses; the addition of several new initiators; and changes to the modeling of offsite power. The revision has resulted in a new overall core damage frequency, changes to the Fussell-Vesely importance of all of the MSPI related basic events and changes to the probability of many of the MSPI related basic events.






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -8.50E-09 -8.50E-09 -7.60E-09 -7.60E-09 -7.30E-09 -5.10E-09 -1.40E-09 -7.10E-10
URI (ΔCDF) -1.00E-08 -1.00E-08 -1.00E-08 -1.10E-08 -1.10E-08 -1.10E-08 -1.10E-08 -2.40E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.85E-08 -1.85E-08 -1.76E-08 -1.86E-08 -1.83E-08 -1.61E-08 -1.24E-08 -2.47E-08

Licensee Comments:

3Q/08: Revision 3 of the GGNS PRA was issued on June 30, 2008. Revision 3 was a major update that included the update of plant specific data, initiator frequencies (both plant specific and generic), common cause analyses, human reliability analyses; the addition of several new initiators; and changes to the modeling of offsite power. The revision has resulted in a new overall core damage frequency, changes to the Fussell-Vesely importance of all of the MSPI related basic events and changes to the probability of many of the MSPI related basic events.






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -1.40E-09 -1.40E-09 -1.40E-09 -1.40E-09 -1.40E-09 -1.40E-09 -1.40E-09 -1.70E-09
URI (ΔCDF) -1.30E-07 -1.20E-07 -1.20E-07 -1.20E-07 -1.20E-07 -1.20E-07 -1.20E-07 -9.20E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.31E-07 -1.21E-07 -1.21E-07 -1.21E-07 -1.21E-07 -1.21E-07 -1.21E-07 -9.37E-08

Licensee Comments:

3Q/08: Revision 3 of the GGNS PRA was issued on June 30, 2008. Revision 3 was a major update that included the update of plant specific data, initiator frequencies (both plant specific and generic), common cause analyses, human reliability analyses; the addition of several new initiators; and changes to the modeling of offsite power. The revision has resulted in a new overall core damage frequency, changes to the Fussell-Vesely importance of all of the MSPI related basic events and changes to the probability of many of the MSPI related basic events.






Link to Notes

Reactor Coolant System Activity 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum activity 0.007000 0.005790 0.004680 0.004440 0.004620 0.004590 0.004790 0.002870 0.002660 0.005360 0.002100 0.002170
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 3.5 2.9 2.3 2.2 2.3 2.3 2.4 1.4 1.3 2.7 1.1 1.1
Reactor Coolant System Activity 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum activity 0.002670 0.002510 0.003380 0.002370 0.002660 0.002120 0.002210 0.002420 0.002430 0.004370 0.002590 0.003030
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 1.3 1.3 1.7 1.2 1.3 1.1 1.1 1.2 1.2 2.2 1.3 1.5

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum leakage 2.350 2.380 2.310 2.300 2.600 3.140 2.420 2.390 2.480 2.770 2.600 2.280
Technical specification limit 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
                         
Indicator value 7.8 7.9 7.7 7.7 8.7 10.5 8.1 8.0 8.3 9.2 8.7 7.6
Reactor Coolant System Leakage 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum leakage 2.680 2.620 2.300 2.420 2.380 2.570 2.480 2.730 2.170 2.810 2.320 2.170
Technical specification limit 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
                         
Indicator value 8.9 8.7 7.7 8.1 7.9 8.6 8.3 9.1 7.2 9.4 7.7 7.2

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful opportunities 43.0 11.0 28.0 24.0 77.0 20.0 55.0 10.0
Total opportunities 45.0 12.0 29.0 24.0 78.0 22.0 57.0 10.0
                 
Indicator value 96.2% 95.6% 94.8% 95.2% 97.4% 97.0% 96.9% 96.8%

Licensee Comments:

2Q/08: April data corrected to reflect inaccurate notification form (not marked "Drill").






Link to Notes

ERO Drill Participation 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Participating Key personnel 90.0 90.0 92.0 90.0 83.0 74.0 80.0 84.0
Total Key personnel 93.0 93.0 94.0 90.0 83.0 82.0 80.0 84.0
                 
Indicator value 96.8% 96.8% 97.9% 100.0% 100.0% 90.2% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful siren-tests 126 128 126 123 129 127 125 82
Total sirens-tests 129 129 129 129 129 129 125 84
                 
Indicator value 98.8% 98.8% 98.3% 97.5% 98.1% 97.9% 98.4% 99.1%

Licensee Comments:

3Q/08: The September 2008 siren test was cancelled at the discretion of the Tensas Parish Office of Emergency Preparedness Emergency Coordinator (LA) and the Claiborne County Civil Defense Director (MS). The test was cancelled due to agencies responding to the aftermath of hurricane Gustav.






Link to Notes

Occupational Exposure Control Effectiveness 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Security information not publicly available.



 
 
 
 