Comanche Peak 2

3Q/2008 Performance Indicators

Licensee's General Comments: Based on feedback received from a review of Mitigating Systems Performance Index (MSPI) data supplied to the Nuclear Regulatory Commission (NRC) and the Idaho National Laboratory (INL), an error was noted in the Unit 2 Train A EDG unplanned UA baseline (UABLU). This PRA value was corrected to match the approved site MSPI Bases document.



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned scrams 2.0 0 0 0 0 2.0 0 0
Critical hours 1735.9 2159.0 2184.0 2208.0 2209.0 2097.8 1753.1 2208.0
                 
Indicator value 1.7 1.7 1.7 1.7 0 1.6 1.7 1.7


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned power changes 0 0 0 0 0 0 0 0
Critical hours 1735.9 2159.0 2184.0 2208.0 2209.0 2097.8 1753.1 2208.0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Scrams with complications 1.0 0 0 0 0 0 0 0
                 
                 
Indicator value       1.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -2.50E-07 -3.00E-07 -3.60E-07 -3.60E-07 -3.60E-07 -3.00E-07 -3.00E-07 -3.00E-07
URI (ΔCDF) -8.80E-08 -1.30E-06 -1.20E-06 -1.20E-06 -1.20E-06 -1.20E-06 -1.20E-06 -1.20E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.38E-07 -1.60E-06 -1.56E-06 -1.56E-06 -1.56E-06 -1.50E-06 -1.50E-06 -1.50E-06

Licensee Comments:

3Q/08: Changed PRA Parameter(s).

2Q/08: Changed PRA Parameter(s).

1Q/08: Changed PRA Parameter(s).

4Q/07: Changed PRA Parameter(s).

3Q/07: Changed PRA Parameter(s).

2Q/07: Changed PRA Parameter(s).

1Q/07: Changed PRA Parameter(s).

4Q/06: Changed PRA Parameter(s).

3Q/06: Changed PRA Parameter(s).

2Q/06: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -7.40E-08 -7.40E-08 -7.40E-08 -7.40E-08 -7.40E-08 -7.40E-08 -7.40E-08 -7.50E-08
URI (ΔCDF) -3.50E-08 -3.40E-08 -3.40E-08 -3.30E-08 -3.20E-08 -3.10E-08 -3.30E-08 -3.30E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.09E-07 -1.08E-07 -1.08E-07 -1.07E-07 -1.06E-07 -1.05E-07 -1.07E-07 -1.08E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -8.10E-08 -8.10E-08 -8.10E-08 -8.10E-08 -8.10E-08 -8.40E-08 -1.50E-07 -1.50E-07
URI (ΔCDF) -1.40E-07 -1.50E-07 -1.40E-07 -1.40E-07 -1.40E-07 -1.40E-07 -1.30E-07 -1.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.21E-07 -2.31E-07 -2.21E-07 -2.21E-07 -2.21E-07 -2.24E-07 -2.80E-07 -2.70E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) -7.50E-09 -7.50E-09 -7.50E-09 -7.50E-09 -7.50E-09 -3.40E-10 -3.90E-10 -3.90E-10
URI (ΔCDF) -2.20E-08 -2.20E-08 -2.20E-08 -2.20E-08 -2.20E-08 -2.20E-08 -2.20E-08 -2.20E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.95E-08 -2.95E-08 -2.95E-08 -2.95E-08 -2.95E-08 -2.23E-08 -2.24E-08 -2.24E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 3.30E-07 3.30E-07 3.30E-07 3.30E-07 3.30E-07 3.20E-07 -2.20E-07 -2.20E-07
URI (ΔCDF) -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07 -2.10E-07 -2.20E-07 -2.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.10E-07 1.10E-07 1.10E-07 1.10E-07 1.10E-07 1.10E-07 -4.40E-07 -4.40E-07

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum activity 0.002210 0.000180 0.000196 0.000207 0.000294 0.000233 0.000244 0.000364 0.000340 0.000303 0.000540 0.000669
Technical specification limit 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
                         
Indicator value 0.5 0 0 0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Reactor Coolant System Activity 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum activity 0.000472 0.000714 0.001580 0.005850 0.002980 0.017700 0.000191 0.000211 0.000241 0.000282 0.000295 0.000287
Technical specification limit 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
                         
Indicator value 0.1 0.2 0.4 1.3 0.7 3.9 0 0 0.1 0.1 0.1 0.1

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum leakage 0 0 0 0 0 0 0 0 0 0 0 0
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0
Reactor Coolant System Leakage 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum leakage 0 0 0 0 0 0 0 0 0 0 0 0
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful opportunities 0 0 0 26.0 52.0 22.0 25.0 36.0
Total opportunities 0 0 0 26.0 52.0 24.0 26.0 37.0
                 
Indicator value 93.6% 93.6% 93.6% 94.6% 95.8% 95.3% 95.6% 97.6%

Licensee Comments: none






Link to Notes

ERO Drill Participation 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Participating Key personnel 75.0 76.0 73.0 70.0 72.0 81.0 76.0 76.0
Total Key personnel 75.0 77.0 77.0 72.0 73.0 88.0 78.0 79.0
                 
Indicator value 100.0% 98.7% 94.8% 97.2% 98.6% 92.0% 97.4% 96.2%

Licensee Comments: none






Link to Notes

Alert & Notification System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful siren-tests 208 215 215 212 213 213 211 426
Total sirens-tests 216 216 216 216 216 216 216 432
                 
Indicator value 98.3% 98.4% 98.3% 98.4% 99.0% 98.7% 98.3% 98.4%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
High radiation area occurrences 0 0 0 1 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 1 1 1 1 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none