This page lists regulations and guidance for pressurized-water reactor sump performance.
On this page:
Some links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS), and others are to documents
in Adobe Portable Document Format (PDF). ADAMS documents are provided in either
PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying
these formats, see our Plugins, Viewers, and
Other Tools page. If you have questions about search techniques or problems
with viewing or printing documents from ADAMS, please contact the Public
Document Room staff.
10 CFR
Document Number |
Description |
10 CFR 50.46 |
Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors |
SECY Papers
Document Number |
Description |
SECY-06-0078 |
Status of Resolution of GSI-191, "Assessment of [Effect of] Debris Accumulation on PWR Sump Performance"
|
SECY-04-0150 |
Alternate Approaches for Resolving the Pressurized Water Reactor
Sump Blockage Issue (GSI-191), Including Realistic and Risk-Informed
Considerations
|
SECY-03-0089 |
Proposed Bulletin: "Potential Impact of Debris
Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors,"
June 2, 2003
|
Regulatory Guides
Document Number |
Description |
RG 1.82, Rev. 3 |
Water Sources for Long-Term Recirculation Cooling Following Loss-of-Coolant-Accident, November 2003 |
Standard Review Plan for the Review of Safety Analysis Reports for Nuclear
Power Plants (NUREG-0800)
Document Number |
Description |
6.2.2 |
Containment Heat Removal Systems, Rev. 4, October 1985 |
Safety Evaluations
Date |
Description |
|
WCAP-16530-NP, Final Safety Evaluation of Post Accident Chemical Effects in Containment Sump Fluids to Support GSI-191 |
|
Final Safety Evaluation for Pressurized Water Reactor Owners
Group (PEROG) Topical Report (TR) WCAP-16406-P, "Evaluation
of Downstream Sump Debris Effects in Support of GSI 191," Revision
1 |
|
Draft SE, PWROG Topical Report WCAP-16530-NP, "Evaluation
of Post-Accident Chemical Effects in Containment Sump Fluids
to Support GSI-191" |
|
GSI-191 SE, Revision 0, "Pressurized Water Reactor Containment Sump Evaluation Methodology" |
|
GSI-191 SE, Revision 0, "Safety Evaluation of NEI Guidance on PWR Sump Performances" |
|
GSI-191 SE, Revision 0, "Review of NEI PWR Sump Performance GR Appendices" |
|
GSI-191 SE, Revision 0, Appendix I: "ANSI/ANS JET MODEL" |
|
GSI-191 SE, Revision 0, "Appendix II: "Confirmatory Debris Generation Analyses" |
|
GSI-191 SE, Revision 0, "Appendix III: "Volunteer Plant Containment Pool CFD Analysis " |
|
GSI-191 SE, Revision 0, " Appendix IV: "Debris Transport Comparison" |
|
GSI-191 SE, Revision 0, " Appendix V: "Confirmatory Head Loss Analyses" |
|
GSI-191 SE, Revision 0, "Attachment V-1. NUREG/CR-6224 Head Loss Temperature Assessment" |
|
GSI-191 SE, Revision 0, "Appendix VI: "Volunteer Plant Blowdown/Washdown Analysis" |
|
GSI-191 SE, Revision 0, "Appendix VII: "Characterization of Latent Debris" |
|
GSI-191 SE, Revision 0, "Appendix VIII: "Formation and Prediction of Thin Bed Behavior" |
Other Guidance
Date |
Description |
|
Revised Content Guide For Generic Letter 2004-02 Supplemental Responses
|
|
Content Guide for Generic Letter 2004-02 Supplemental Responses |
|
Draft Guidance for Review of Final Licensee Responses to Generic
Letter 2004-02, "Potential Impact of Debris Blockage on Emergency
Recirculation During Design Basis Accidents at Pressurized-Water
Reactors".
|
|