|
Home > Nuclear Reactors > New Reactors > Combined License Applications > Nine Mile Point, Unit 3 Application
Nine Mile Point, Unit 3 Application
|
Who: |
Nine Mile Point Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC (UniStar)
|
What: |
Application for a combined license (COL) for an AREVA U.S. Evolutionary Power Reactor (U.S. EPR) designated as Nine Mile Point Unit 3 |
When: |
September 30, 2008 (date of application submittal)
|
Where: |
UniStar Nuclear Energy's Nine Mile Point site in Oswego, New York |
|
On this page:
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
Reference Documents
![To top of page](https://webarchive.library.unt.edu/eot2008/20090118072536im_/http://www.nrc.gov/images/navigation/go-top.gif)
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Date |
Description |
11/18/08 |
COL Supplement 1: FSAR Section 2.5
|
09/30/08 |
UniStar Nuclear Energy transmittal letter for Nine Mile Point COLA
- Part 1 - General Information
- Part 2 - Final Safety Analysis Report
- Part 3 - Environmental Report
- Part 4 - Technical Specifications
- Part 5 - Emergency Plan
- Part 6 - Limited Work Authorization
- Part 7 - Departures and Exemption Requests
- Part 8 - Security Plan [This Part contains safeguards information which is with-held from public availability]
- Part 9 - Proprietary and Sensitive Unclassified Non-Safeguards Information [This Part contains other information which is with-held from public availability]
- Part 10 - Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) and ITAAC Closure
- Part 11A - Quality Assurance Program Description
- Part 11B - AREVA Design Control Document
- Part 11C - AREVA DCD Supplements
- Part 11D - NEI References
- Part 11E - Fuel Rack Supplements
- Part 11F - Boring Logs
|
![To top of page](https://webarchive.library.unt.edu/eot2008/20090118072536im_/http://www.nrc.gov/images/navigation/go-top.gif)
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
09/30/08 - A |
Acceptance Review |
Acceptance Review Start |
10/06/08 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
12/12/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
TBD |
Safety Review |
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant |
|
Phase 2 - SER with Open Items issued |
|
Phase 3 - ACRS Review of SER with Open Items Complete |
|
Phase 4 - Advanced SER with no Open Items Issued |
|
Phase 5 - ACRS Review of SER with no Open Items Complete |
|
Phase 6 - Final SER Issued |
|
Environmental Review |
Phase 1 - Environmental impact statement (EIS) summary report issued |
|
Phase 2 - Draft EIS issued to EPA |
|
Phase 3 - Response to public comments on draft EIS issued |
|
Phase 4 - Final EIS issued to EPA |
|
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.
![To top of page](https://webarchive.library.unt.edu/eot2008/20090118072536im_/http://www.nrc.gov/images/navigation/go-top.gif)
NRC Documents
Date |
Description |
TBD |
Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping
|
12/12/08 |
Notification of Docketing and Federal Register Notice
|
10/22/08 |
Acknowledgment of Receipt of Application and Federal Register Notice
|
![To top of page](https://webarchive.library.unt.edu/eot2008/20090118072536im_/http://www.nrc.gov/images/navigation/go-top.gif)
Requests for Additional Information
Category |
RAI Date |
RAI Letter No. and Subject |
Applicant Response |
Safety |
|
None Issued Yet |
|
Environmental |
|
None Issued Yet |
|
![To top of page](https://webarchive.library.unt.edu/eot2008/20090118072536im_/http://www.nrc.gov/images/navigation/go-top.gif)
Public Meetings
Date |
Description |
|
None have been scheduled
|
![To top of page](https://webarchive.library.unt.edu/eot2008/20090118072536im_/http://www.nrc.gov/images/navigation/go-top.gif)
Contacts
Contacts for the Nine Mile Point COL Application |
Safety Project Manager |
Prosanta Chowdhury |
Environmental Project Manager |
Philip Brandt |
Contact a Public Affairs Officer |
![To top of page](https://webarchive.library.unt.edu/eot2008/20090118072536im_/http://www.nrc.gov/images/navigation/go-top.gif)
|