Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend Unit 1
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
Nine Mile Point Unit 3
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Grand Gulf, Unit 3 Application

Grand Gulf
Who:   Entergy Operations, Inc. (EOI) [see Part 1 for additional details]

What:   Application for a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as Grand Gulf Unit 3

When:   February 27, 2008 (date of application submittal)

Where:   EOI's Grand Gulf site near Port Gibson in Claiborne County, Mississippi

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
08/29/08 Entergy Responses to USNRC COL Information Needs for the Hydrology Safety Audit Items
08/27/08 Entergy USNRC COL Application: Semiannual Departures Report
07/24/08 Entergy Responses to USNRC COL Environmental Site Audit Requests for Electronic Files
06/30/08 Entergy Response to USNRC COL Acceptance Review Questions Regarding Methodology Used to Develop Horizontal and Vertical Site-Specific Hazard Consistent Uniform Hazard Response Spectra
06/13/08 Entergy Response to USNRC COL Acceptance Review Questions Regarding Geologic and Seismic Information
04/11/08 Entergy Response to USNRC COL Acceptance Review Question re: FEMA Acceptance Review of the Offsite Emergency Response Plans for the Grand Gulf Site
04/09/08 Entergy Response to USNRC COLA Acceptance Review Questions re: Geologic and Seismic Information
02/27/08 Entergy transmittal letter for Grand Gulf Unit 3 COLA
  • Part 1 - General and Administrative Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - LWA/Site Redness Plan
  • Part 7 - Departures (Variances, Supplemental Information) from the ESBWR Design Control Document (DCD)
  • Part 8 - Security Plan [This Part contains safeguards information which is withheld from public availability]
  • Part 9 - Withheld information [This part contains sensitive information which is withheld from public availability]
  • Part 10 - Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
  • Part 11 - Enclosures [QA Plan, Environmental Protection Plan]

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 02/27/08 - A
Acceptance Review
Acceptance Review Start
03/03/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
04/17/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
05/16/08 - A
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
01/23/09 - T
Phase 2 - SER with Open Items issued
09/04/09 - T
Phase 3 - ACRS Review of SER with Open Items Complete
12/09 - T
Phase 4 - Advanced SER with no Open Items Issued
09/10 - T
Phase 5 - ACRS Review of SER with no Open Items Complete
01/11 - T
Phase 6 - Final SER Issued
03/11 - T
Environmental Review
Phase 1 - Environmental Scoping Summary Report issued
11/26/08 - A
Phase 2 - Draft EIS issued to EPA
05/19/09 - T
Phase 3 - Response to public comments on draft EIS issued
11/03/09 - T
Phase 4 - Final EIS issued to EPA
05/10 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
11/26/08 Environmental Scoping Summary Report
07/22/08 Trip Report - June 16 and 17, 2008, Hydrology-Related Site Visit in Support of Grand Gulf Unit 3 Combined License Application
06/25/08 Federal Register Notice for Hearing and Opportunity to Petition for Leave to Intervene for Grand Gulf Unit 3 COLA and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information for Contention Preparation
05/30/08 Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process
05/16/08 Grand Gulf Nuclear Station Unit 3 Combined License Application Review Schedule
04/17/08 Acceptance for Docketing of the Entergy Application for a Combined License for Grand Gulf Unit 3
03/10/08 Acknowledgement of Receipt of Application and Federal Register Notice
02/14/08 Acceptance Review Schedule for the Entergy Application for a Combined License for Grand Gulf Unit 3

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 09/05/08 RAI Letter No. 01 SRP Section 191 and 19.2 10/01/08
09/12/08 RAI Letter No. 02 SRP Section 2.31, 2.3.4 and 2.3.5 10/13/08
09/12/08 RAI Letter No. 03 SRP Section 12.03-12.04 10/09/08
09/16/08 RAI Letter No. 04 SRP Section 13.01.02-13.01.03 10/15/08
09/18/08 RAI Letter No. 05 SRP Section 17.5 10/20/08
09/18/08 RAI Letter No. 06 SRP Section 10.04.05 10/14/08
09/29/08 RAI Letter No. 07 SRP Section 09.05.04 10/23/08
10/06/08 RAI Letter No. 08 SRP Section 11.2, 11.3, 11.4 and 11.5 11/05/08
10/06/08 RAI Letter No. 09 SRP Section 12.02 11/05/08
10/06/08 RAI Letter No. 10 SRP Section 02.02.03 12/03/08
10/06/08 RAI Letter No. 11 SRP Section 01.9 10/23/08
10/07/08 RAI Letter No. 12 SRP Section 8.2 and 8.3 11/05/08
10/15/08 RAI Letter No. 13 SRP Section 14.2 11/05/08
10/24/08 RAI Letter No. 14 SRP Section 09.02.01 11/24/08
10/22/08 RAI Letter No. 15 Part 01 11/19/08
10/22/08 RAI Letter No. 16 SRP Section 14.2 11/05/08
10/27/08 RAI Letter No. 17 SRP Section 3.71 11/18/08
10/30/08 RAI Letter No. 18 SRP Section 01 11/24/08
10/30/08 RAI Letter No. 19 SRP Section 13.03 12/01/08
11/04/08 RAI Letter No. 20 SRP Section 14.03.10 12/04/08
11/10/08 RAI Letter No. 21 SRP Section 09.05.01  
11/24/08 RAI Letter No. 22 SRP Section 9.5.4 12/17/08
11/24/08 RAI Letter No. 23 SRP Section 13.1.1 12/16/08
11/24/08 RAI Letter No. 24 SRP Section 14.2  
11/24/08 RAI Letter No. 25 SRP Section 12.03 12/12/08
12/08/08 RAI Letter No. 26 SRP Section 2.5.1-2.5.5  
12/08/08 RAI Letter No. 27 SRP Section 2.4.2, 2.4.12 and 2.4.13  
12/10/08 RAI Letter No. 28 SRP Section 1.0  
12/22/08 RAI Letter No. 29 SRP Section 3.7.2  
12/22/08 RAI Letter No. 30 SRP Section 13.03  
Environmental 09/08/08 Request for Additional Information Regarding the Environmental Review of the Combined License Application for Grand Gulf Nuclear Station, Unit 3 10/06/08

To top of page

Public Meetings

Date Description
06/19/08 Public Scoping Meeting
03/19/08 Meeting regarding the technical content of the Grand Gulf Unit 3 COLA
03/06/08 Grand Gulf Unit 3 COLA Orientation
02/21/08 Public Outreach Meeting

To top of page

Contacts

Contacts for the Grand Gulf COL Application
Safety Project Manager Andrea Johnson
Environmental Project Manager Tamsen Dozier
Contact a Public Affairs Officer