Home > Nuclear Reactors > New Reactors > Combined License Applications > Comanche Peak Nuclear Power Plant, Units 3 and 4 Application
Comanche Peak Nuclear Power Plant, Units 3 and 4 Application
|
Who: |
Luminant Generation Company LLC (Luminant)
|
What: |
Application for a combined license (COL) for a United States Advanced Pressurized Water Reactor (US-APWR) designated as Comanche Peak Nuclear Power Plant, Units 3 and 4
|
When: |
September 19, 2008 (date of application submittal)
|
Where: |
Luminant's Comanche Peak site near Glen Rose in Somervell County, Texas |
|
On this page:
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
Reference Documents
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Date |
Description |
12/18/08 |
Response to request for additional information on 2.4.13
|
11/10/08 |
Resolution of Docketing Issues Regarding COL Holder
|
11/06/08 |
Resolution of Docketing Issues Regarding FSAR Subsection 2.45.13
|
11/05/08 |
Resolution of Docketing Issues Regarding FSAR Subsections 2.5.1, 2.5.2, and 2.5.4
|
11/04/08 |
Resolution of Docketing Issues Regarding FSAR 2.5.4, 6.4.4, and the Emergency Plan
|
09/19/08 |
Comanche Peak Nuclear Power Plant, Units 3 and 4, Meteorological Data
|
09/19/08 |
Luminant transmittal letter for Comanche Peak COLA
- Part 1 - General and Administrative Information
- Part 2 - Final Safety Analysis Report (FSAR)
- Part 3 - Environmental Report
- Part 4 - Technical Specifications
- Part 5 - Emergency Plan
- Part 6 - Limited Work Authorization [Part not used in this application]
- Part 7 - Generic DCD Departures Report [Part not used in this application]
- Part 8 - Safeguards / Security Plans [Part not used in this application]
- Part 9 - [Part not used in this application]
- Part 10 - Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) and Proposed License Conditions
- Part 11 - Enclosures
|
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
09/19/08 - A |
Acceptance Review |
Acceptance Review Start |
09/22/08 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
12/02/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
|
Safety Review |
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant |
|
Phase 2 - SER with Open Items issued |
|
Phase 3 - ACRS Review of SER with Open Items Complete |
|
Phase 4 - Advanced SER with no Open Items Issued |
|
Phase 5 - ACRS Review of SER with no Open Items Complete |
|
Phase 6 - Final SER Issued |
|
Environmental Review |
Phase 1 - Environmental impact statement (EIS) summary report issued |
|
Phase 2 - Draft EIS issued to EPA |
|
Phase 3 - Response to public comments on draft EIS issued |
|
Phase 4 - Final EIS issued to EPA |
|
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.
NRC Documents
Date |
Description |
12/12/08 |
Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping
|
12/02/08 |
Notification for Docketing and Federal Register Notice
|
11/03/08 |
Acknowledgment of receipt of the Combined License Application for Comanche Peak, Units 3 and 4
|
Public Meetings
Date |
Description |
01/06/09 |
Environmental Scoping Meeting
|
10/19/08 |
Summary of COLA Orientation Meeting
|
06/12/08 |
Public Outreach Meeting
|
Contacts
Contacts for the Comanche Peak COL Application |
Safety Project Manager |
Stephen Monarque |
Environmental Project Manager |
Michael Willingham |
Contact a Public Affairs Officer |
|